Chapter 7, Problem 6P
To determine
The minimum cycle length and the timing stage effective green times.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Problem-Traffic Engg.
A two-phase signalized intersection is designed with a cycle time of 120 s. The amber and red times for each phase are 4 s and 50 s, respectively. If the total lost time per phase due to start-up and clearance
is 2 s, the effective green time of each phase is s. (in integer)
A two-phase signalized intersection is designed with a cycle time of 100 s. The amber and red times for each phase
are 4 s and 50 s, respectively. If the total lost time per phase due to start-up and clearance is 2 s, the effective
green time of each phase is _s. (in integer)
Please estimate the minimum cycle length and the green intervals for the following signalized
intersection (Figure 7). Please note that the minimum cycle length will be influenced by the design of
the phasing diagram. The arrival flow, in pcu/h, for each direction, is illustrated in Figure 7. Please
assume any missing values.
Lost time following each phase = 2 sec, Amber = 3 sec, Red all = 1 sec, saturation flow 1400 pcu/h.
196, 367, 170
JIL!
400, 140, 215
716
120, 417, 232
400, 433, 184
Figure 7. Intersection Layout and Traffic Flow Data
Chapter 7 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10P
Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - Prob. 14PCh. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 18PCh. 7 - Prob. 19PCh. 7 - Prob. 20PCh. 7 - Prob. 21PCh. 7 - Prob. 22PCh. 7 - Prob. 23PCh. 7 - Prob. 24PCh. 7 - Prob. 25PCh. 7 - Prob. 26PCh. 7 - Prob. 27PCh. 7 - Prob. 28PCh. 7 - Prob. 29PCh. 7 - Prob. 30PCh. 7 - Prob. 31PCh. 7 - Prob. 32PCh. 7 - Prob. 33PCh. 7 - Prob. 34PCh. 7 - Prob. 35PCh. 7 - Prob. 36PCh. 7 - Prob. 37PCh. 7 - Prob. 38PCh. 7 - Prob. 39PCh. 7 - Prob. 40PCh. 7 - Prob. 41PCh. 7 - Prob. 42PCh. 7 - Prob. 43PCh. 7 - Prob. 44PCh. 7 - Prob. 45PCh. 7 - Prob. 46PCh. 7 - Prob. 47PCh. 7 - Prob. 48PCh. 7 - Prob. 49PCh. 7 - Prob. 50PCh. 7 - Prob. 51PCh. 7 - Prob. 52PCh. 7 - Prob. 53PCh. 7 - Prob. 54PCh. 7 - Prob. 55PCh. 7 - Prob. 56PCh. 7 - Prob. 57PCh. 7 - Prob. 58PCh. 7 - Prob. 59PCh. 7 - Prob. 60PCh. 7 - Prob. 61PCh. 7 - Prob. 62P
Knowledge Booster
Similar questions
- PROBLEM 1. Consider a signalized intersection approach in which the arrival rates are different during the effective green and red times during a given phase. During the effective green, there is only one lane group with an arrival rate of 2,400 vehicles per hour and 2700 vehicles per hour during the rest of the cycle (during the effective red). The cycle length is of 90 seconds, the effective green is 30 seconds and the saturation rate is 8,000 veh/h. Questions: a) Estimate the average uniform delay for this approach b) Consider that this approach has an upgrade of 4%. The total width of the cross street at this intersection is 60 feet. The average vehicle length of approaching traffic is 16 feet. The speed of approaching traffic is 40 mi/h. Determine the sum of the minimum necessary change and clearance intervals.arrow_forwardFour-phases signal with a cycle time of 80 sec, Inter Green = 4 sec/phase, lost time / phase = 2 sec. Saturation flow on all approaches are similar, but the maximum traffic flows on two of the phases are triple the maximum traffic flows on the remaining two approaches, what will be actual green time on each phase ?arrow_forward3. An intersection approach has two lane groups: left-turn lane group, and through/right-turn lane group. The control delay is 37 seconds/vehicle for the left-turn lane group, and 27 seconds/vehicle for the through/right-turn lane group. The analysis flow rate is 97 vehicles/hour for the left-turn lane group, and 450 vehicles/hour for the through/right-turn lane group. Calculate the approach control delay and write the corresponding level of service (LOS) for the approach in the box below.arrow_forward
- An intersection of four phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in table pictute below. Calculate the sum of flow ratios for critical lane groups.arrow_forwardA right-turn-only lane at the west-east approach to a signalized intersection can store a maximum of five vehicles. The traffic volume at the approach is 900 veh/h and 20% of the traffic take right turns. The cycle time of the traffic light is 60 s, the green time allocated for right turns can accommodate a maximum of five vehicles. Determine the probability that there will be a backup of vehicles waiting to turn right thus blocking the lane.arrow_forwardDetermine minimum cycle length and LOS of North bound approach for the intersection shown below. Given, Phase l: All EB movements; Phase I1: All WB movements; and Phase IlI: All NB movements. Traffic volumes given in figure are in veh/hr. Assume saturation flow rates as follows, EBT/R 1590 veh/hr, WBL- 1580 veh/hr, WBT 1670 veh/hr, NBR - 1660 veh/hr and NBL - 1580 veh/hr. The intersection is isolated and pre-timed. Use lost time per phase as 5 seconds. Use appropriate recommendations where ever needed. 300 Eir 36 ft 330 285 LT RI 305 250 110 PHF 0.90 Target v/e ratio 0.90 Moderate pedestrian activity (in xwalks only) Speed limit 30 mi/h (all approaches) Crosswalk width 15 ft 24 ft24 ft 10 ftarrow_forward
- The traffic volume at the north-south approach of an arterial road intersection is 720 veh/h and 25% of the traffic take right turns. A right-turn-only lane at the signalised intersection of this approach can store a maximum of six vehicles. The cycle time of the traffic light is 90 seconds, the green time allocated for right turns can accommodate a maximum of six vehicles. Determine - the volume (veh/hr) of vehicles taking right turns - the average number of vehicles taking right turns in 90 seconds - the probability of no vehicles staying on the right-turn-only lane during an allocated green time - the probability that there will be a backup of vehicles waiting to turn right thus blocking the lane; and - show the situation of the north-south approach using an appropriate sketcharrow_forward6. Design signal timing for an intersection with the following details. Assume a total loss time of 3 seconds per phase. Width of lanes are 12 ft each. Assume that there are 20 pedestrians crossing each of the approaches per cycle. Check the signals for pedestrian crossing time. Take pedestrian walking speed as 4 ft/s. Saturation flow rates are: Left-turning: 1600 veh/hr/ln, Through: 1800 veh/hr/In, and Right-turning: 1700 veh/hr/In 488 488 234- 115 C 1051 217 N 338 -338 Phase I Phase II Phase III 11 AN J|| Narrow_forwardThe maximum flow that could pass through an intersection from a given approach, if that approach was allocated all of the cycle time as effective green with no lost time. Saturation flow B) cycle flow Peak flow (D Approach capacityarrow_forward
- Problem 1: Textbook Problem 7.1 W An intersection approach has one left-turn lane. The signal cycle length is C = 90 seconds, which is divided into r= 74 seconds of effective red, followed by g = 16 seconds of effective green. At t = 0 (start of the effective red), there is a queue of 3 vehicles. Left turn vehicles arrive at a constant rate of λ = 200 . During the 16 second effective green time, left-turn vehicles cross the stop line at one vehicle every 2 seconds. veh a. Sketch the graph of cumulative arrivals and departures from t = 0-90 seconds. Shade the area that represents the total delay. b. At t = 90 seconds, how many vehicles arrived? How many vehicles departed?arrow_forwardProblem 4: Compute delays and determine LOS for the NBTH and NBLT lane groups at this intersection. Assume a full-actuated control with unit extension (passage time, PT) of 4 seconds and absence of filtering/metering at the neighboring signalized intersections. Effective green signal times are. 8 NB,TH = 33.2s =17.3s 8 NB,LT and Cycle length is: C = 125 s 3.41 3.99m 4.02m 7.99m- 3.81m 3.82m N X Street 1.38m 3.03m 5.73m 5.29m 3.48m 1.55m 3.26m 3.21m 3.47m 4.51m 6.70m 3.19m 1.20m 3.44m 3.90m 3.87m 4.06m 4,09m 4,51m Y Street Figure 1. Dual-Ring Phasing, X St. and y Street (North is up)arrow_forward5. Design signal timing for an intersection with the following details. Assume a total loss time of 3 seconds per phase. Width of lanes are 12 ft each. Assume that there are 20 pedestrians crossing each of the approaches per cycle. Check the signals for pedestrian crossing time. Take pedestrian walking speed as 4 ft/s. Saturation flow rates are: Left-turning: 1600 veh/hr/ln, Through: 1800 veh/hr/In, and Right- turning: 1700 veh/hr/In A 488 488 115 1051 217 N 338 -338 (В Phase I Phase II Phase III J!!! J↓↓ Yrarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning