Question
Chapter 7, Problem 60P
To determine
The sum of the flow ratios for the critical lane group.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The following calculations are taken at the approach of an intersection during the morning rush hour. Determine
(a) the hourly volume,
(b) the peak flow rate in one hour, and
(c) the peak hour factor.
An intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below.
(1) Calculate the sum of the flow ratios for the critical lane groups.
(2) calculate the minimum cycle length and the effective green time for each phase (balancing v/c for the critical lane groups). Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired.
3. An intersection approach has two lane groups: left-turn lane group, and through/right-turn lane
group. The control delay is 37 seconds/vehicle for the left-turn lane group, and 27
seconds/vehicle for the through/right-turn lane group. The analysis flow rate is 97
vehicles/hour for the left-turn lane group, and 450 vehicles/hour for the through/right-turn lane
group. Calculate the approach control delay and write the corresponding level of service (LOS)
for the approach in the box below.
Chapter 7 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10P
Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - Prob. 14PCh. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 18PCh. 7 - Prob. 19PCh. 7 - Prob. 20PCh. 7 - Prob. 21PCh. 7 - Prob. 22PCh. 7 - Prob. 23PCh. 7 - Prob. 24PCh. 7 - Prob. 25PCh. 7 - Prob. 26PCh. 7 - Prob. 27PCh. 7 - Prob. 28PCh. 7 - Prob. 29PCh. 7 - Prob. 30PCh. 7 - Prob. 31PCh. 7 - Prob. 32PCh. 7 - Prob. 33PCh. 7 - Prob. 34PCh. 7 - Prob. 35PCh. 7 - Prob. 36PCh. 7 - Prob. 37PCh. 7 - Prob. 38PCh. 7 - Prob. 39PCh. 7 - Prob. 40PCh. 7 - Prob. 41PCh. 7 - Prob. 42PCh. 7 - Prob. 43PCh. 7 - Prob. 44PCh. 7 - Prob. 45PCh. 7 - Prob. 46PCh. 7 - Prob. 47PCh. 7 - Prob. 48PCh. 7 - Prob. 49PCh. 7 - Prob. 50PCh. 7 - Prob. 51PCh. 7 - Prob. 52PCh. 7 - Prob. 53PCh. 7 - Prob. 54PCh. 7 - Prob. 55PCh. 7 - Prob. 56PCh. 7 - Prob. 57PCh. 7 - Prob. 58PCh. 7 - Prob. 59PCh. 7 - Prob. 60PCh. 7 - Prob. 61PCh. 7 - Prob. 62P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- In order to determine the DHV from a traffic count worksheet, the first step is to: Group of answer choices Calculate the PHF of each approach Determine which hour has the highest total intersection volume in veh/hr Convert all of the turning counts from veh/15-min to veh/hr Calculate the PHF of the intersectionarrow_forwardA new freeway ramp meter will be installed on the Medina onramp to westbound SR 520. There is 70 ft from the ramp meter stop line back to the nearest intersection, and each stopped vehicle takes up an average of 20 ft. The desired meter rate is one vehicle every 10 seconds, while the arrival rate averages one vehicle arrival every 11 seconds. What is the average queue length? 55ft O 4.5 ft 100ft 90ftarrow_forward5-10. The following travel times were measured for vehicles traversing a 1,000-ft segment of an arterial: Vehicle Travel Time (s) 20.6 2. 21.7 1 3 19.8 4 20.3 5 22.5 6 18.5 7 19.0 8 21.4 Determine the time mean speed (TMS) and space mean speed (SMS) for these vehicles.arrow_forward
- Draw a space – time diagram for traffic within a tunnel. Assuming there exist a 2-lane before the tunnel but the tunnel itself is 1-lane and after the tunnel the road returns to being a 2-lane.arrow_forwardFour-phases signal with a cycle time of 80 sec, Inter Green = 4 sec/phase, lost time / phase = 2 sec. Saturation flow on all approaches are similar, but the maximum traffic flows on two of the phases are triple the maximum traffic flows on the remaining two approaches, what will be actual green time on each phase ?arrow_forwardDetermine minimum cycle length and LOS of North bound approach for the intersection shown below. Given, Phase l: All EB movements; Phase I1: All WB movements; and Phase IlI: All NB movements. Traffic volumes given in figure are in veh/hr. Assume saturation flow rates as follows, EBT/R 1590 veh/hr, WBL- 1580 veh/hr, WBT 1670 veh/hr, NBR - 1660 veh/hr and NBL - 1580 veh/hr. The intersection is isolated and pre-timed. Use lost time per phase as 5 seconds. Use appropriate recommendations where ever needed. 300 Eir 36 ft 330 285 LT RI 305 250 110 PHF 0.90 Target v/e ratio 0.90 Moderate pedestrian activity (in xwalks only) Speed limit 30 mi/h (all approaches) Crosswalk width 15 ft 24 ft24 ft 10 ftarrow_forward
- Please calculate the level of service and delay for the westbound left lane group, the westbound approach, and the whole intersection. I provided LOS chart for reference.arrow_forwardAnalyze the unsignalized intersection below and calculate the optimum cycle length if the intersection will be signalized. Approach E W N S Maximum no. of lanes 5 5 4 4 Direction Through left Through left Through left Through left N Total volume pcu/hr 1,480 370 860 586 1,360 494 2,030 265 Sat. flow rate pcu/hr/lane 2,400 1,700 2,400 1,700 2,200 1,800 2,200 1,800arrow_forwardThe average normal flow of traffic on cross roads A and B during design period are 400 and 250 pcu per hour; the saturations flow values on these roads are estimated as 1250 and 1000 pcu per hour respectively. The all-red time required for pedestrian crossing is 12 secs. Design two phase traffic signal by Webster's method.arrow_forward
- Problem 17.2W You are given the following design hourly volume (pc/h) of an intersection with 4 approaches, all without an exclusive right-turn lane. In the following table, fill in the volumes and use them to determine the 8 NEMA movements. Fill in the movement numbers 1 to 8 in the last row of the table.arrow_forwardA new section of a freeway is to be designed with a free-flow-speed of 65 mph along of 0.75 mile on 5% upgrade. The expected traffic volume is 4200 v/hr. The traffic composition is 15% trucks, 5% recreational vehicles, and 10% buses. The peak hourly factor is 0.9, the unfamiliar driver factor is 0.95. If the design requirement is to target a level of service (B), how many lanes must be provided to satisfy the design requirement?arrow_forwardThree-phase a pretimed signalized system for T- intersection, the total lost time per phase is 15 sec. Given that PHF for intersection is 0.91. The table below shows information for all movements included in each phase. (Assume the intersection is isolated, and the traffic flow accounts for the peak 15-min period, and there is no initial queue at the start of the analysis period.) 1 Phase Direction Lane group Number of Lanes Volume (veh/h) 2 Northbound Southbound Northbound LT TH & RT ΤΗ I I 250 1800 390 1800 1 270 1600 2- Determine the average vehicle delay for each traffic lane. 3- Evaluate the level of service (LOS) for each traffic lane. 3 Westbound LT 1 250 2500 Saturation flow (veh/lane/hr) 1- Using the Webster method, determine the optimum cycle length and the effective green time for each phase.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning