Chapter 7, Problem 32P
To determine
The length of the cycle and the average delay per vehicle over the cycle.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
An approach at a signalized intersection with a 60-second cycle gets 30 seconds of displayed green time. Yellow time is
4 seconds and all-red is 2 seconds (lost time is to be determined from standard assumptions). At the beginning of an
effective red there are 4 vehicles in the queue and the saturation flow is 876 veh/h. The arrival rate is given by v(t) = 0.20
- 0.002t [with v(t) in veh/s and t in seconds after the beginning of the effective red]. What is the average vehicle delay for
this approach in seconds at the end of the cycle (until the next effective red) that started with the 4 vehicles queued at the
beginning of the effective red? (Assume D/D/1 queueing. Please provide you answer in decimal form without units)
Please estimate the minimum cycle length and the green intervals for the following signalized
intersection (Figure 7). Please note that the minimum cycle length will be influenced by the design of
the phasing diagram. The arrival flow, in pcu/h, for each direction, is illustrated in Figure 7. Please
assume any missing values.
Lost time following each phase = 2 sec, Amber = 3 sec, Red all = 1 sec, saturation flow 1400 pcu/h.
196, 367, 170
JIL!
400, 140, 215
716
120, 417, 232
400, 433, 184
Figure 7. Intersection Layout and Traffic Flow Data
A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210
veh/h (saturation flow rates are 1800 veh/h/In for all phases). The lost time is known to be 4 seconds for each
phase. Assuming X₁ = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth
phase?
6.93 sec
O 21.89 sec
Ⓒ 7.78 sec
Q 7.41 sec
Chapter 7 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10P
Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - Prob. 14PCh. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 18PCh. 7 - Prob. 19PCh. 7 - Prob. 20PCh. 7 - Prob. 21PCh. 7 - Prob. 22PCh. 7 - Prob. 23PCh. 7 - Prob. 24PCh. 7 - Prob. 25PCh. 7 - Prob. 26PCh. 7 - Prob. 27PCh. 7 - Prob. 28PCh. 7 - Prob. 29PCh. 7 - Prob. 30PCh. 7 - Prob. 31PCh. 7 - Prob. 32PCh. 7 - Prob. 33PCh. 7 - Prob. 34PCh. 7 - Prob. 35PCh. 7 - Prob. 36PCh. 7 - Prob. 37PCh. 7 - Prob. 38PCh. 7 - Prob. 39PCh. 7 - Prob. 40PCh. 7 - Prob. 41PCh. 7 - Prob. 42PCh. 7 - Prob. 43PCh. 7 - Prob. 44PCh. 7 - Prob. 45PCh. 7 - Prob. 46PCh. 7 - Prob. 47PCh. 7 - Prob. 48PCh. 7 - Prob. 49PCh. 7 - Prob. 50PCh. 7 - Prob. 51PCh. 7 - Prob. 52PCh. 7 - Prob. 53PCh. 7 - Prob. 54PCh. 7 - Prob. 55PCh. 7 - Prob. 56PCh. 7 - Prob. 57PCh. 7 - Prob. 58PCh. 7 - Prob. 59PCh. 7 - Prob. 60PCh. 7 - Prob. 61PCh. 7 - Prob. 62P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- H.W: A simple four-leg intersection needs a fixed-time signal. The critical flows in the N-S and E-W directions are 600 and 400 veh/hr. Saturation flow is 1800 veh/hr and the lost time per phase is observed to be 5.2 seconds. Determine the cycle length and distribution of green (assume yellow interval 4sec).arrow_forwardThe saturation flow for an intersection approach is 3600 veh/h. At the beginning of cycle no vehicles are queued. The signal is timed so that what the queue is 13 vehicles the effective green begins. If the queue dissipates 8 seconds before the end of the cycle and the cycle length is 60 seconds. What is the arrival rate assuming D/D/1 queuing?arrow_forward(b) An approach to a pretimed signal has 25 seconds of effective green in a 60-second cycle. The approach volume is 500 vph and the saturation flow rate is 1400 vph. Calculate the average vehicle delay assuming D/D/1 queuing.arrow_forward
- Question 21 A signalized intersection operates in two phases. The lost time is 3 seconds per phase. The maximum ratios of approach flow to saturation flow for the two phases are 0.37 and 0.40. The optimum cycle length using the Webster's method (in seconds, round off to one decimal place) ISarrow_forwardPROBLEMS 2. The 15 minute-traffic counts on cross roads 1 and 2 during peak hour are observed as 178 and 142 vehicles per lane respectively approaching the intersection in the direction of heavier traffic flow. If the amber times required are 3 and 2 seconds respectively for two lanes based on approach speeds, design the signal timings by trial cycle method. Assume an average time headway of 2.5 seconds during green phase.arrow_forwardTraffic demand shown in the figure below uniformly arrives at an intersection. Determine the optimal cycle length and split for the 2- phase signal control. The saturation flow rate of each approach is 2000 [veh/hr of effec-tive green] during the first 40 [sec] after the start of green, but it drops to 1900 [veh/hr of effective green] thereafter. Also, the lost time is assumed to be 5 [sec/phase]. 1000[veh/h] 300[veh/h] 500[veh/h] 1300[veh/h]arrow_forward
- A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all phases). The lost time is known to be 4 seconds for each phase. Assuming Xi = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth phase?arrow_forwardThe average normal flow on cross roads A and B during design period are 400 and 250 pcu per hour. The saturations flow values on these roads are estimated as 1200 and 1000 pcu per hour respectively. The all-red time required for pedestrian crossing is 12secs. Calculate cycle time for two phase signal system.arrow_forwardA simple four-legged intersection needs a fixed-time signal. The critical lane flows in the N-S and E-W directions are 950 and 600 veh/hr/ln, respectively. Saturation flow is 1,950 veh/hr/ln and the lost time per phase is 6 seconds. Assume yellow interval is 3 seconds and all red interval is 2 seconds. Determine the cycle length and the distribution of green using Webster’s method.arrow_forward
- For the geometric characteristics, traffic conditions (traffic volumes are in vehicles per hour) and signal timing shown below, complete parts A through E for the Northbound and Eastbound approaches. A. Adjust the volumes. B. Find the saturation flow rate. C. Find the degree of saturation. D. Find the theoretical delay for each movement. E. Find the theoretical delay and LOS for the EB and NB approaches. Bus stop 5 stops/hr $12 ft teach 6% HV 400 6% HV 650 100 12 ft each - Isolated signal with random arrivals, AT-3 - No residual demand delay 11 ft each - No bicycles or pedestrians Bus stop 5 stops/hr P C = 60 sec Lost time = 3.5 sec/ 7550 2% HV - G=42 Y=4 G=10; Y=4 G=8 Y=4 G=30 Y=4 Φ1 Φ2 ФЗ Assume the intersection is located at Central Business District (CBD) Assume that both the streets are located on level grades, i.e. G = 0 Assume a PHF = 0.95 Assume random arrival i.e. AT-3 Assume that the intersection is isolated and signal is pre-timedarrow_forwardPROBLEM 2. A lane group in an intersection approach with a pre-timed signal has a phase with display green of 48, with 4 seconds of yellow and all-red time and 2 seconds of lost time. The uniform delay in this signal phase is 12 seconds per vehicle and the ratio of volume to capacity is 0.8 with a satuation flow rate of 1,600 veh/h. Question: Determine the effective red and arrival rate of this lane group.arrow_forwardThe equivalent hourly flow rate for an approach with 125 vehicles in the peak 15 minutes and PHF = 0.92 would be:arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning