Question
Chapter 7, Problem 14P
To determine
The approach flow rate and the cycle length.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
An approach to a pretimed signal has 30 seconds
of effective red, and D/D/1 queuing holds. The
total delay at the approach is 83.33 veh-s/cycle
and the saturation flow rate is 1000 veh/h. If the
capacity of the approach equals the number of
arrivals per cycle, determine the approach flow
rate and cycle length.
An observer notes that an approach to a pretimed signal, the time it will take the queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) is 60 s. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, what is the maximum number of vehicles in a queue in a given cycle? Round off the final answer to whole number (no units).
An observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) (in seconds)? Round off the final answer to whole number
Chapter 7 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10P
Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - Prob. 14PCh. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 18PCh. 7 - Prob. 19PCh. 7 - Prob. 20PCh. 7 - Prob. 21PCh. 7 - Prob. 22PCh. 7 - Prob. 23PCh. 7 - Prob. 24PCh. 7 - Prob. 25PCh. 7 - Prob. 26PCh. 7 - Prob. 27PCh. 7 - Prob. 28PCh. 7 - Prob. 29PCh. 7 - Prob. 30PCh. 7 - Prob. 31PCh. 7 - Prob. 32PCh. 7 - Prob. 33PCh. 7 - Prob. 34PCh. 7 - Prob. 35PCh. 7 - Prob. 36PCh. 7 - Prob. 37PCh. 7 - Prob. 38PCh. 7 - Prob. 39PCh. 7 - Prob. 40PCh. 7 - Prob. 41PCh. 7 - Prob. 42PCh. 7 - Prob. 43PCh. 7 - Prob. 44PCh. 7 - Prob. 45PCh. 7 - Prob. 46PCh. 7 - Prob. 47PCh. 7 - Prob. 48PCh. 7 - Prob. 49PCh. 7 - Prob. 50PCh. 7 - Prob. 51PCh. 7 - Prob. 52PCh. 7 - Prob. 53PCh. 7 - Prob. 54PCh. 7 - Prob. 55PCh. 7 - Prob. 56PCh. 7 - Prob. 57PCh. 7 - Prob. 58PCh. 7 - Prob. 59PCh. 7 - Prob. 60PCh. 7 - Prob. 61PCh. 7 - Prob. 62P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- An observer notes that an approach to a pretimed signal, the time it will take the queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) is 60 s. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, what is the maximum number of vehicles in a queue in a given cycle?arrow_forwardAn observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) (in seconds)? Round off the final answer to whole number. Blank 1 Blank 1 Add your answerarrow_forwardAn observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies)?arrow_forward
- An approach to a pretimed signal has 25 seconds of effective green. The approach volume is 500 veh/h and the saturation flow rate is 1400 veh/h. If the average vehicle delay is 20 seconds assuming D/D/1 queuing, determine the cycle length (in seconds). Round off the final answer to whole number (no units).arrow_forwardThe saturation flow for an intersection approach is 3600 veh/h. At the beginning of cycle no vehicles are queued. The signal is timed so that what the queue is 13 vehicles the effective green begins. If the queue dissipates 8 seconds before the end of the cycle and the cycle length is 60 seconds. What is the arrival rate assuming D/D/1 queuing?arrow_forwardThe uniform arrival and uniform service rates observed on an approach road to a signalized intersection are 20 and 50 vehicles/minute, respectively. For this signal, the red time is 30 s, the effective green time is 30 s, and the cycle length is 60 s. Assuming that initially there are no vehicles in the queue, the average delay per vehicle using the approach road during a cycle length (in s, round off to 2 decimal places) isarrow_forward
- An approach to a pre-timed signal has 40 sec of effective green in a 75-second cycle.The approach volume is 700 veh/h and the saturation flow rate is 1600 veh/h.Calculate the time to queue clearance after the start of the effective green, themaximum number of vehicles in the queue, the total vehicle delay per cycle andthe average delay per vehicle assuming D/D/1 queuing.arrow_forwardAn approach to a pretimed signal has 25 seconds of effective green in a 60-second cycle. The approach volume is 500 veh/h and the saturation flow rate is 1400 veh/h. Calculate the average vehicle delay (in seconds) assuming D/D/1 queuing. Round off the final answer to whole number (no units).arrow_forwardCompute the average approach delay per cycle, given the saturation flow rate of 2400 veh/h and is allocated 24 seconds of effective green in an 80-second signal cycle. Flow at the approach is 500 veh/h. Assume the traffic flow accounts for the peak 15-min period and that there is no initial queue at the start of the analysis period.arrow_forward
- vehicles start to arrive at a parking area at 6 am with an arrival rate function(vehicles per minute) of lambda(t)=1.2+(0.3)t, where t is in minutes. At 6:15 am, the parking area opens and processed vehicles at a rate of 12 per minute. a)Determine when does the queue clear? b)find the total delay? c)find the maximum queue length?arrow_forwardThe uniform arrival and uniform service rates observed on an approach road to a signalized intersection are 20 and 50 vehicles/minutes, respectively. For this signal, the red time is 30 s, the effective green time is 30 s, and the cycle length is 60s. Assuming that initially there are no vehicles in the queue, the average delay per vehicle using the approach road during a cycle length (in seconds, round off to 2 decimal places) isarrow_forwardTraffic demand shown in the figure below uniformly arrives at an intersection. Determine the optimal cycle length and split for the 2- phase signal control. The saturation flow rate of each approach is 2000 [veh/hr of effec-tive green] during the first 40 [sec] after the start of green, but it drops to 1900 [veh/hr of effective green] thereafter. Also, the lost time is assumed to be 5 [sec/phase]. 1000[veh/h] 300[veh/h] 500[veh/h] 1300[veh/h]arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning