PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
7th Edition
ISBN: 9781119610526
Author: Mannering
Publisher: WILEY
expand_more
expand_more
format_list_bulleted
Question
Chapter 7, Problem 5P
To determine
The minimum cycle length and the timing stage effective green times..
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210
veh/h (saturation flow rates are 1800 veh/h/In for all phases). The lost time is known to be 4 seconds for each
phase. Assuming X₁ = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth
phase?
6.93 sec
O 21.89 sec
Ⓒ 7.78 sec
Q 7.41 sec
A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all phases). The lost time is known to be 4 seconds for each phase. Assuming Xi = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth phase?
PROBLEM 2. A lane group in an intersection approach with a pre-timed signal has a phase with
display green of 48, with 4 seconds of yellow and all-red time and 2 seconds of lost time. The
uniform delay in this signal phase is 12 seconds per vehicle and the ratio of volume to capacity is
0.8 with a satuation flow rate of 1,600 veh/h.
Question: Determine the effective red and arrival rate of this lane group.
Chapter 7 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10P
Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - Prob. 14PCh. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 18PCh. 7 - Prob. 19PCh. 7 - Prob. 20PCh. 7 - Prob. 21PCh. 7 - Prob. 22PCh. 7 - Prob. 23PCh. 7 - Prob. 24PCh. 7 - Prob. 25PCh. 7 - Prob. 26PCh. 7 - Prob. 27PCh. 7 - Prob. 28PCh. 7 - Prob. 29PCh. 7 - Prob. 30PCh. 7 - Prob. 31PCh. 7 - Prob. 32PCh. 7 - Prob. 33PCh. 7 - Prob. 34PCh. 7 - Prob. 35PCh. 7 - Prob. 36PCh. 7 - Prob. 37PCh. 7 - Prob. 38PCh. 7 - Prob. 39PCh. 7 - Prob. 40PCh. 7 - Prob. 41PCh. 7 - Prob. 42PCh. 7 - Prob. 43PCh. 7 - Prob. 44PCh. 7 - Prob. 45PCh. 7 - Prob. 46PCh. 7 - Prob. 47PCh. 7 - Prob. 48PCh. 7 - Prob. 49PCh. 7 - Prob. 50PCh. 7 - Prob. 51PCh. 7 - Prob. 52PCh. 7 - Prob. 53PCh. 7 - Prob. 54PCh. 7 - Prob. 55PCh. 7 - Prob. 56PCh. 7 - Prob. 57PCh. 7 - Prob. 58PCh. 7 - Prob. 59PCh. 7 - Prob. 60PCh. 7 - Prob. 61PCh. 7 - Prob. 62P
Knowledge Booster
Similar questions
- A signalized intersection has four phases. The yci are 0.15, 0.19, 0.21, and 0.17 for the four phases, respectively. If the cycle length is 108 seconds and the total lost time is 16 seconds, what is the effective green time for phase 2? Group of answer choices 23 sec 25 sec 21 sec 19 secarrow_forwardAn intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. Phase Allowed movements NB L, SB L NB T/R, SB T/R EB L, WB L EB T/R, WB T/R Analysis flow rate 330, 365 veh/h 1125, 1075 veh/h 110, 80 veh/h 250, 285 veh/h Saturation flow rate 1700, 1750 veh/h 3400, 3300 veh/h 650, 600 veh/h 1750, 1800 veh/h Calculate the sum of the flow ratios for the critical lane groups. O 0.709 O 0.857 O 0.787 O 0.829arrow_forwardTRANSPORTATION ENGINEERING-TRAFFIC SIGNALS" Recent analysis at an approach to pre-time signalized intersection indicate that the volume-to-capacity ratio (v/c) is 0.8, htat saturation flow rate (s) is 1600 vehicles/hour, and the effective green time is 50 seconds. If the average delay, assuming D/D/1 is 11.25 seconds per vehicle, determine the arrival flow rate (vehicles/hour) and the cycle length.arrow_forward
- (b) An approach to a pretimed signal has 25 seconds of effective green in a 60-second cycle. The approach volume is 500 vph and the saturation flow rate is 1400 vph. Calculate the average vehicle delay assuming D/D/1 queuing.arrow_forwardA fixed time two-phase signal is to be designed for a four-legged intersection, for which the design hourly flow and saturation flow are given below: Details of flow Details hourly flow (veh/h) Saturation flow (veh/h) North South East West 570 320 550 455 1750 1500 2210 2265 Time lost per phase due to starting delays is 2 seconds. Calculate the optimum cycle time and allocate the green time for the two phases using Webster's method.arrow_forwardAn approach to a pre-timed signal has 40 sec of effective green in a 75-second cycle.The approach volume is 700 veh/h and the saturation flow rate is 1600 veh/h.Calculate the time to queue clearance after the start of the effective green, themaximum number of vehicles in the queue, the total vehicle delay per cycle andthe average delay per vehicle assuming D/D/1 queuing.arrow_forward
- If the all-red time required for pedestrian crossing at a two-phase signal is 12 s and the average normal flow for the two roads, A and B was given as 525 and 375, respectively and the saturation flow was given as 1650 and 1200 respectively. Find the green time in seconds required for road A.arrow_forwardAn intersection has a three-phase signal with the movement allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired Phase 1 2 3 Allowed Movement NB L, SB L NB T/R, SB T/R EB L, WB L EB /T/R, WB T/R Analysis Flow Rate 330, 365 veh/h 1125, 1075 veh/h 110, 80 veh/h 250, 285 veh/h Saturation Flow Rate 1700, 1750 veh/h 3400, 300 veh/h 650, 600 veh/h 1750, 1800 veh/h Calculate the Following: 1.)Sum of flow ratios for critical lane groups 2.)minimum cycle length 3.)using v/c equation ratio, calculate the effective green time for phase 1 4.)using v/c equation ratio, calculate the effective green time for phase 2 5.)using v/c equation ratio, calculate the effective green time for phase 3arrow_forwardAn intersection has a three-phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in the table below. Assume the lost time is 4 seconds per phase and a critical intersection v/c of 0.90 is desired. Phase 3 Allowed movements NB L, SB L NB T/R, SB T/R EB L, WB L EB T/R, WB T/R Analysis flow rate 330, 365 veh/h 1125, 1075 veh/h 110, 80 veh/h 250, 285 veh/h Saturation flow rate 1700, 1750 veh/h 3400, 3300 veh/h 650, 600 veh/h 1750, 1800 veh/h Using v/c equalization ratio, calculate the effective green time for phase 1 O 15.954 sec O 12.105 sec O 14.127 sec O 13.190 secarrow_forward
- A new freeway ramp meter will be installed on the Medina onramp to westbound SR 520. There is 70 ft from the ramp meter stop line back to the nearest intersection, and each stopped vehicle takes up an average of 20 ft. The desired meter rate is one vehicle every 10 seconds, while the arrival rate averages one vehicle arrival every 11 seconds. What is the average queue length? 55ft O 4.5 ft 100ft 90ftarrow_forwardQ9:- For the following intersection, it has been decided to use a traffic signal device. The intersection has the following data: Flow/ Direction Actual flow (veh/hr) North South 490 480 Saturation flow (veh/hr) 2100 2100 West East 400 450 2000 2000 Amber time 3 sec, without all-red time; starting delay=2.5 sec. Use a 4-phase signalized intersection; draw the timing diagram for each phase?arrow_forwardThree-phase a pretimed signalized system for T- intersection, the total lost time per phase is 15 sec. Given that PHF for intersection is 0.91. The table below shows information for all movements included in each phase. (Assume the intersection is isolated, and the traffic flow accounts for the peak 15-min period, and there is no initial queue at the start of the analysis period.) 1 Phase Direction Lane group Number of Lanes Volume (veh/h) 2 Northbound Southbound Northbound LT TH & RT ΤΗ I I 250 1800 390 1800 1 270 1600 2- Determine the average vehicle delay for each traffic lane. 3- Evaluate the level of service (LOS) for each traffic lane. 3 Westbound LT 1 250 2500 Saturation flow (veh/lane/hr) 1- Using the Webster method, determine the optimum cycle length and the effective green time for each phase.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning