PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
7th Edition
ISBN: 9781119610526
Author: Mannering
Publisher: WILEY
Question
Book Icon
Chapter 7, Problem 5P
To determine

The minimum cycle length and the timing stage effective green times..

Blurred answer
Students have asked these similar questions
A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/In for all phases). The lost time is known to be 4 seconds for each phase. Assuming X₁ = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth phase? 6.93 sec O 21.89 sec Ⓒ 7.78 sec Q 7.41 sec
A pretimed four-phase signal has critical lane group flow rates for the first three phases of 200, 187, and 210 veh/h (saturation flow rates are 1800 veh/h/ln for all phases). The lost time is known to be 4 seconds for each phase. Assuming Xi = 0.9. If the cycle length is 60 seconds, what is the estimated effective green time of the fourth phase?
PROBLEM 2. A lane group in an intersection approach with a pre-timed signal has a phase with display green of 48, with 4 seconds of yellow and all-red time and 2 seconds of lost time. The uniform delay in this signal phase is 12 seconds per vehicle and the ratio of volume to capacity is 0.8 with a satuation flow rate of 1,600 veh/h. Question: Determine the effective red and arrival rate of this lane group.
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning