PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
7th Edition
ISBN: 9781119610526
Author: Mannering
Publisher: WILEY
bartleby

Concept explainers

Question
Book Icon
Chapter 7, Problem 18P
To determine

The total vehicle delay on the approach until the complete queue clearance.

Blurred answer
Students have asked these similar questions
An observer notes that an approach to a pretimed signal, the time it will take the queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) is 60 s. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, what is the maximum number of vehicles in a queue in a given cycle?
An observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies)?
The uniform arrival and uniform service rates observed on an approach road to a signalized intersection are 20 and 50 vehicles/minute, respectively. For this signal, the red time is 30 s, the effective green time is 30 s, and the cycle length is 60 s. Assuming that initially there are no vehicles in the queue, the average delay per vehicle using the approach road during a cycle length (in s, round off to 2 decimal places) is
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning