Question
Book Icon
Chapter 7, Problem 28P
To determine

The minimum effective green time needed for the cycle, the effective red for the next cycle start and the approach’s total delay with the green time.

Blurred answer
Students have asked these similar questions
The saturation flow for an intersection approach is 3600 veh/h. At the beginning of cycle no vehicles are queued. The signal is timed so that what the queue is 13 vehicles the effective green begins. If the queue dissipates 8 seconds before the end of the cycle and the cycle length is 60 seconds. What is the arrival rate assuming D/D/1 queuing?
An observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies)?
An observer notes that an approach to a pretimed signal, the time it will take the queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies) is 60 s. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, what is the maximum number of vehicles in a queue in a given cycle?
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning