Chapter 7, Problem 22P
To determine

The total vehicle delay on the approach for the signal cycle.

Blurred answer
Students have asked these similar questions
An observer notes that an approach to a pretimed signal has a maximum of eight vehicles in a queue in a given cycle. If the saturation flow rate is 1440 veh/h and the effective red time is 40 seconds, how much time will it take this queue to clear after the start of the effective green (assuming that approach capacity exceeds arrivals and D/D/1 queuing applies)?
7. An approach at a pretimed signalized intersection is allocated 30 seconds of effective green in an 80-second signal cycle. The flow at the approach is 500 veh/h and the saturation flow of the approach is 2500 veh/h. Assuming D/D/1 queuing, calculate: 1) the time needed to clear the queue, 2) the average delay per vehicle, and 3) the maximum delay of any vehicle.
5. Green terminates at a signalized intersection with 6 vehicles queued for service. The arrival rate for the approach is 1 veh/sec. The departure rate is 2 veh/sec. The cycle length is 100s, 50s of which are effective green. Answer the following: a. What is the total delay (in veh-sec) experienced by all vehicles in this system during the next cycle? (
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning