Question
Book Icon
Chapter 7, Problem 12PA
Summary Introduction

Interpretation: Average time spent by a part in the workstation is to be calculated.

Concept Introduction:

The average work-in-process is being used to determine the progress of the work done and the ongoing work. Process rate and average time spent plays an important role in calculating the average work in process.

Blurred answer
Students have asked these similar questions
(a) T. Smunt Manufacturing Corp. has the process displayed below. The drilling operation occurs separately from and simultaneously with the sawing and sanding operations. The product only needs to go through one of the three assembly operations (the assembly operations are "parallel"). ASSEMBLY SAWING SANDING 78 min/unit 15 min/unit 15 min/unit WELDING ASSEMBLY DRILLING 25 min/unit 78 min/unit 27 min/unit ASSEMBLY 78 min/unit 1. Which operation is the bottleneck? 2. What is the throughput time for the overall system? 3. If the firm operates 8 hours per day, 22 days per month, what is the monthly capacity of the manufacturing process? 4. Suppose that a second drilling machine is added, and it takes the same time as the original frilling machine. What is the new bottleneck time of the system? 5. Suppose that a second drilling machine is added, and it takes the same time as the original drilling machine. What is the new throughput time?
A production process at Brianna Bryant Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). a) is the bottleneck. 1.8 units/hr Sawing minutes per unit (round your response to two decimal places). 5 units/hr Sanding Drilling 5 units/hr b) The bottleneck time is c) The throughput time of the overall system is minutes (round your response to two decimal places). d) If the firm operates 11 hours per day, 20 days per month, the monthly capacity of the manufacturing process is Welding 2.5 units/hr Assembly 0.8 units/hr Assembly 0.8 units/hr Assembly 0.8 units/hr units (enter your response as a whole number). Q
Consider the assembly line of a laptop computer. The line consists of 10 stations and operates at a cycle time of 2 minutes/unit. Their most error-prone operation is step 2. There is no inventory between the stations because this is a machine-paced line. Final inspection happens at station 10. What would be the information turnaround time for a defect made at station 2? answer:_______minutes
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.