Concept explainers
Case Summary: A rare book library at the University of Audubon in England keeps books that are worth thousands of dollars. This library is the foremost choice for many book readers. The library wants to design a structured process to make ensure the safety of books. The library has a designated process for which the throughput rate is 40 customers per hour. On average, 10 people wait in the visitor’s area, 12 people in the second waiting area, 5 people in the first edition waiting area, 3 people in the original manuscript area and 1 in the author’s journal waiting area. Activity durations are provided by the library and they want to analyze their process flow chart to ensure maximum customer satisfaction.
Interpretation: Bottleneck needs to be determined with the help of information given in the case.
Want to see the full answer?
Check out a sample textbook solution- What are the techniques available to operations managers to deal with a bottleneck operation? Which of thesedoes not decrease throughput time?arrow_forwardkindly do question 5 & 6 pls. thx Kiko Teddy Bear is a manufacturer of stuffed teddy bears. Kiko would like to be able to produce 40 teddy bears per hour on its assembly line. The following information will assist in answering the questions that follow: Task Information for Kiko Teddy Bear Work Element Task Description Immediate Predecessor Task Time (in seconds) A Cut teddy bear pattern None 90 B Sew teddy bear cloth A 75 C Stuff teddy bear B 50 D Glue on eyes C 20 E Glue on nose C 15 F Sew on mouth C 35 G Attach manufacturer’s label B 15 H Inspect and pack teddy bear D,E,F,G 40 Draw a precedence diagram. What cycle time would provide the desired output? What is the maximum possible output of the line?…arrow_forwardSuppose the times for the individual operations for the in-line skate assembly are as follows: Task Description Time (sec) 1 Assemble wheels, bearings, and axle hardware 11 2 Assemble brake housing and pad 8 3 Complete wheel assembly 20 4 Inspect wheel assembly 13 5 Assemble boot 18 6 Join boot and wheel subassemblies 7 7 Add line and final assembly 10 8 Perform final inspection 10 Consider the production line achieving an output rate of 180 per hour below. Using the proposed design, calculate the total time and idle time for each workstation. If your answer is zero, enter "0". Round your answers to the nearest whole number. Station Tasks Total Time, seconds Idle Time, seconds A 1 and 2 B 3 C 5 D 4 and 6 E 7 and 8 Total What is the assembly line efficiency? Round your answer to one decimal place. %arrow_forward
- State how can the resources be deployed to achieve customer requirements ?arrow_forwardExplain the techniques to deal with bottleneck operations and some of those techniques that does not decrease throughput time ?arrow_forwardJ 1 ue K Beth Zion Hospital has received initial certification from the state of California to become a center for liver transplants. The hospital, however, must complete its first 10 transplants under great scrutiny and at no cost to the patients with the hospital picking the expenses. The cost per hour of surgery is estimated to be $5,000. The very first transplant, just completed, required 27 hours. On the basis of research at the hospital, Beth Zion estimates that it will have an 75% learning curve. Using Table E.3, estimate the time it will take to complete: a) the 10th transplant hours (round your response to two decimal places). Learning Curve Coefficients Unit Number (N) 10 Unit Time .385 75% Total Time 5.589 Unit Time .477 80% Total Time 6.315 Unit Time .583 85% Total Time 7.116 Xarrow_forward
- How does the capacity analysis respond when many processes are running at the same time?arrow_forwardWhen bottlenecks are identified, resources become accessible, and some people may go looking for them.arrow_forwardDescribe the techniques to deal with bottleneck operations and some of those techniques that does not decrease throughput time ?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.