Concept explainers
(a)
Interpretation:The MPS of the computer is to be calculated.
Concept Introduction:
The optimal order policy is known as economic order quantity (EOQ) which is used to order the different quantities in such way that minimizes the holding cost and ordering cost.
(b)
Interpretation: The planned order release for the motherboard assuming a lot-for-lot
Concept Introduction:
The optimal order policy is known as economic order quantity (EOQ) which is used to order the different quantities in such way that minimizes the holding cost and ordering cost.
(c)
Interpretation: The schedule of outside orders for the disk drivers is to be determined.
Concept Introduction:
The optimal order policy is known as economic order quantity (EOQ) which is used to order the different quantities in such way that minimizes the holding cost and ordering cost.
Want to see the full answer?
Check out a sample textbook solutionChapter 8 Solutions
Production and Operations Analysis, Seventh Edition
- Describe what are the advantages of mixed model sequencing ?arrow_forwardCarol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip: Setup labor cost Annual holding cost Daily production Annual demand Desired lot size To obtain the desired lot size, the set-up time that should be achieved = $25 per hour $15 per unit 960 units/8 hour day 30,000 (250 days each x daily demand of 120 units) 120 units (one hour of production) minutes (round your response to two decimal places).arrow_forwardABC Corporation recently decided to switch to just-in-time (JIT) inventory system. At the beginning of this switch, the firm has 40 units of product in inventory. The firm has 2,500 labor hours available in the first month of this switch. These hours could produce 700 units of the product. Customer demand for this month is 500 units. If JIT principles are correctly followed, how many units should the firm produce in the first month of the switch? a. 40 b. 740 c. 500 d. 460 e. 660 f. 200arrow_forward
- EL Computer produces its multimedia notebook computer on a production line that has an annual capacity of 16,000 units. EL Computer estimates the annual demand for this model a 6000 units. The cost to set up the production line is $2345, and the annual holding cost is $30 per unit. Current practice calls for production runs of 500 notebook computers each month a. What is the optimal production lot size? b. How many production runs should be made each year? What is the recommended cycle time? c. Would you recommend changing the current production lot size policy from the monthly 500-unit production runs? Why or why not? What is the projected savings of your recommendation?arrow_forwardDicount-Mart, a major East Coast retailer,wants to determine the economic order quantity for its halogen lamps. it currently buys all halogen lamps from Speciality light manufacturers, in Atlanta. Annual demand is 2,200 lamps,ordering cost per order is $0.75, carrying cost per lamp is $20. As part of it's new JIT program, Discount-Mart has signed a long term contract with speciality lighting and will place orders electronically for its halogen lamps.What is the total annual cost of managing the inventory with this policy.arrow_forwardThe Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 35, 30, and 10 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 185 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are, in total, six drilling machines, but at present only three of them are operational. Each drilling machine drills part C at a rate of 80 parts per hour. In the final assembly, the output from assembly line 1 is assembled with the drilled part C. The final assembly line produces at a rate of 205 components per hour. At present, components are produced eight hours a day and five days a week. Management believes that if the need arises, it can add a second shift of eight hours for the assembly lines. The cost of assembly labor is 30 cents per part for…arrow_forward
- 6. The demand for a particular part called SKU 005 is 1,500 units a year. The cost of one SKU 005 is $40.00. It costs $50.00 to place an order for SKU 005, and the user of SKU 005 has a per year inventory carrying cost of 25% of unit cost. Assume 250 working days in the year where SKU 005 is used. (Noteshaper: Scenario #26) а. What is the combined annual holding and ordering cost of an order size of 200 units for SKU 005? b. How many of SKU 005 should be ordered, to minimize combined ordering and holding costs? c. The vendor who sells SKU 005 has just offered a 5% discount for orders of 500 or more. Now how many should be ordered? d. Once the purchasing manager for SKU 005 places an order, the vendor requires 7 working days to deliver that order. What should be the purchasing manager's reorder point?arrow_forwardSitka Industries uses a cost system that carries direct materials inventory at a standard cost. The controller has established these standards for one ladder (unit): StandardQuantity x StandardPrice = StandardCost Direct materials 3 pounds $4.50 per pound $13.50 Direct labor 2.00 hours 12.00 per hour 24.00 Total cost $37.50 Sitka Industries made 2,900 ladders in July and used 8,500 pounds of material to make these units. Sitka Industries bought 15,400 pounds of material in the current period. There was a $300 unfavorable direct materials price variance. Enter all amounts as positive numbers. A. How much in total did Sitka pay for the 15,400 pounds? B. What is the direct materials quantity variance? C. What is the total direct materials cost variance? D. What if 9,200 pounds were used to make these ladders, what would be the direct materials quantity variance? E. If there was a $340 favorable direct materials price variance, how much did Sitka pay…arrow_forwardCarol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip: Setup labor cost Annual holding cost Daily production Annual demand Desired lot size $25 per hour $12 per unit 992 units/8 hour day 24,840 (270 days each x daily demand of 92 units) 124 units (one hour of production) To obtain the desired lot size, the set-up time that should be achieved = minutes (round your response to two decimal places).arrow_forward
- Pauline Found Manufacturing, Inc., is moving to kanbans to support its telephone switching-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost Annual holding cost Daily production Annual usage $30 $120 per subassembly 20 subassemblies 4,500 (50 weeks x5 days each x daily usage of 18 subassemblies) 10 days Lead time: Safety stock 3 days' production Kanban container size = 150 units (round your response to the nearest whole number). Number of kanbans needed = 2 kanbans (round your response to the nearest whole number)arrow_forwardWhich type of lift truck is suitable for double deep rack storage - Counterbalance lift truck, Reach/double-reach lift truck, or Turret Truck?arrow_forwardCarol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip: Setup labor cost Annual holding cost $30 per hour $13 per unit 960 units/8 hour day 36,000 (250 days each x daily demand of 144 units) Daily production Annual demand Desired lot size 120 units (one hour of production) To obtain the desired lot size, the set-up time that should be achieved = ☐ minutes (round your response to two decimal places).arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.