Textbook Question
Chapter 5, Problem 42P
Vehicles begin to arrive at a parking lot at 7:45 A.M. at a constant rate of 4 veh/min and continue to arrive at that rate throughout the day. The parking lot opens at 8:00 A.M. and vehicles are processed at a constant rate of one vehicle every 10 seconds. Assuming D/D/1 queuing, what is the longest queue, the queue at 8:15 A.M., and the average delay per vehicle from 7:45 A.M. until the queue clears?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
vehicles start to arrive at a parking area at 6 am with an arrival rate function(vehicles per minute) of lambda(t)=1.2+(0.3)t, where t is in minutes. At 6:15 am, the parking area opens and processed vehicles at a rate of 12 per minute.
a)Determine when does the queue clear?
b)find the total delay?
c)find the maximum queue length?
1. Estimate the queue dissipation time, maximum queue length, and total delay, given:
Time
Arrival Rate (veh/hour/lane)
Departure Rate (veh/hour/lane)
3:30 4:00 PM
4:00 8:00 PM
3:00 - 3:30 PM
1200
1800
1200
1200
900
1800
9- Vehicles arrive at a recreational park booth at a uniform deterministic rate of 4veh/min. If uniform
deterministic processing of vehicles (collecting of fees) begins 30 minutes after the first arrival and
the total delay is 3600 veh-min, how long after the arrival of the first vehicle will it take for the queue
to be cleared?
Chapter 5 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - Prob. 3PCh. 5 - Prob. 4PCh. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prob. 9PCh. 5 - Prob. 10P
Ch. 5 - Prob. 11PCh. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - The arrival rate at a parking lot is 6 veh/min....Ch. 5 - Prob. 16PCh. 5 - At the end of a sporting event, vehicles begin...Ch. 5 - Prob. 18PCh. 5 - Prob. 19PCh. 5 - Vehicles begin arriving at a single toll-road...Ch. 5 - Vehicles begin to arrive at a toll booth at 8:50...Ch. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Vehicles begin to arrive at a parking lot at 6:00...Ch. 5 - At a parking lot, vehicles arrive according to a...Ch. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - Prob. 32PCh. 5 - Prob. 33PCh. 5 - Vehicles arrive at a recreational park booth at a...Ch. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - A truck weighing station has a single scale. The...Ch. 5 - Prob. 39PCh. 5 - Prob. 40PCh. 5 - Vehicles leave an airport parking facility (arrive...Ch. 5 - Vehicles begin to arrive at a parking lot at 7:45...Ch. 5 - Prob. 43PCh. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - Prob. 48PCh. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 51PCh. 5 - Prob. 52PCh. 5 - A theme park has a single entrance gate where...Ch. 5 - Prob. 54PCh. 5 - Prob. 55P
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
1.2 Explain the difference between geodetic and plane
surveys,
Elementary Surveying (14th Edition)
What production method for steel shapes is specified by the following organizations? AISI (American Iron and St...
Structural Steel Design (6th Edition)
State three examples of a static load application and three examples of a dynamic load application.
Materials for Civil and Construction Engineers (4th Edition)
11-1. Determine the moments at A,B, and C, then draw
the moment diagram for the beam. The moment of ine...
Structural Analysis (10th Edition)
A 3 ft square footing carries a sustained load of 10 k. It is placed on the surface of a 30 ft thick saturated ...
Foundation Design: Principles and Practices (3rd Edition)
5.11 What error results on a 200-ft sight with a level if the rod reading is 6.307 ft but the top of the
7-ft r...
Elementary Surveying: An Introduction To Geomatics (15th Edition)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Vehicles arrive at a single toll booth beginning at8:00 A.M. They arrive and depart according to a uniformdeterministic distribution. However, the toll booth doesnot open until 8:10 A.M. The average arrival rate is 8veh/min and the average departure rate is 10 veh/min.Assuming D/D/1 queuing, when does the initial queueclear and what are the total delay, the average delay pervehicle, longest queue length (in vehicles), and the waittime of the 100th vehicle to arrive (assuming first-infirst-out)?arrow_forwardVehicles begin to arrive at a park entrance at 7:45 A.M. at a constant rate of six per minute and at a constant rate of four vehicles per minute from 8:00 A.M. on. The park opens at 8:00 A.M. and the manager wants to set the departure rate so that the average delay per vehicle is no greater than 9 minutes (measured from the time of the first arrival until the total queue clears). Assuming D/D/1 queuing, what is the minimum departure rate needed to achieve thisarrow_forwardThere is a single gate at an entrance to a recreational park where arriving vehicles must stop to pay their tickets. The park opens at 8:00AM, at which time vehicles begin to arrive at a rate of 480 veh/hr. After 20 minutes the arrival flow rate declines to 120 veh/hr, and it continues at that level for the remainder of the day. If the service time is 15 seconds per vehicle, and assuming D/D/1 queuing, determine the Length of Queue at 8:1OAM. Note: Round off your answers to the nearest whole number. Only include the numeric value of your answer without the unit (i.e. 22).arrow_forward
- There is a single gate at an entrance to a recreational park where arriving vehicles must stop to pay their tickets. The park opens at 8:00AM, at which time vehicles begin to arrive at a rate of 480 veh/hr. After 20 minutes the arrival flow rate declines to 120 veh/hr, and it continues at that level for the remainder of the day. If the service time is 15 seconds per vehicle, and assuming D/D/1 queuing, determine the Longest Vehicle Queue. Note: Round off your answers to the nearest whole number. Only include the numeric value of your answer without the unit (i.e. 22).arrow_forwardVehicles arrive at a single toll booth beginning at 7:00 A.M. at a rate of 8 veh/min. Service also starts at 7:00 A.M. at a rate of u(t)=6+0.2t where (f) is in vehicles per minute and it is in minutes after 7:00 A.M. Assuming D/D/1 queuing, determine when the queue will clear, the total delay, and the maximum queue length in vehicles.arrow_forwardThere is a single gate at an entrance to a recreational park where arriving vehicles must stop to pay their tickets. The park opens at 8:00AM, at which time vehicles begin to arrive at a rate of 480 veh/hr. After 20 minutes the arrival flow rate declines to 120 veh/hr, and it continues at that level for the remainder of the day. If the service time is 15 seconds per vehicle, and assuming D/D/1 queuing, determine the time that the queue will dissipate. Answer must be in this format: *:**AM, minute time must be rounded off to the nearest whole number (i.e. 8:50AM)arrow_forward
- C. There is a traffic accident happened on EDSA at 6:00 AM the flow rate on that time was 50 veh per min while the normal capacity of EDSA is 60 veh per min but since there is an accident, it reduced to 22 veh per min, the traffic was cleared after 25 minutes. Determine the length of the queue before the removal of blockage. Also calculate the time that vehicles waited a long line before the removal of blockage and when was the queue cleared?arrow_forwardVehicles arrive to the park entrance at a constant rate of 900 veh/hour from 7:30 AM to 8:10 AM and then at a constant rate of 600 veh/hour from 8:10 A.M. The park opens at 8:10 A.M. and the manager wants to set the departure rate so that the average delay per vehicle (i.e.: Total delay/total number of arrival) is no greater than 24 minutes (measured from the time of the first arrival until the total queue clears). Assuming D/D/1 queuing, what is the minimum departure rate (?) needed to achieve this? What is the total delay at this rate? What is the longest Queue?arrow_forwardAt exactly 8:05AM, vehicles start to enter a single toll gate at rate of 7veh/min following deterministic distribution. Due to teller being late, the toll booth opened at 8:20AM having a service rate of 8.5veh/min. Determine the time of queue dissipation, total vehicles at queue dissipation, longest vehicle delay, longest vehicle queue, total vehicle delay, and average delay per vehicle.arrow_forward
- A toll booth on a temple is open from 8:00 AM to 12 midnight. Vehicles start arriving at 7:45 AM at a uniform deterministic rate of six per minute until 8:15 AM and from then on at two per minute. If vehicles are processed at a uniform deterministic rate of six per minute, determine the (a) time of queue dissipation in minutes (b) total number of vehicles in queue and (c) total vehicle delayarrow_forwardThe arrival rate at a parking lot is 6 veh/min. Vehicles start arriving at 6:00 P.M., and when the queue reaches 36 vehicles, service begins. The company policy states that the total vehicle delay should be equal to 500 veh-min. Assuming D/D/1 queuing and a constant service rate, at what time did the queue clear?arrow_forwardThe arrival rate at a parking lot is 6 veh/min. Vehicles start arriving at 6:00 P.M., and when the queue reaches 36 vehicles, service begins. The company policy states that the total vehicle delay should be equal to 500 veh-min. Assuming D/D/1 queuing and a constant service rate, determine the maximum queue length.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
What Is A Construction Takeoff? | Are They Still Necessary In Quantity Surveying?; Author: Metroun Quantity Surveying;https://www.youtube.com/watch?v=uTWoDPtcOjg;License: Standard Youtube License