Question
Chapter 5, Problem 31P
To determine
The new distribution rate.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
How many ticket vending machines will be needed if the hourly passenger demand is expected to be 8,750 and it takes each passenger 8 seconds to retrieve a ticket? Tickets are mandatory for all passengers. Round up your answer to the nearest integer (i.e. ticket vending machine).
RKI Instruments manufactures a ventilation controller designed for monitoring and controlling
carbon monoxide in the parking garages, boiler rooms, tunnels etc. The net cash flow associated with
one plant for the first 3 years of operation is shown. (a) What do the wo rules about sign changes
indicate concerning į* values? (b) Find all rate of return values between 0 and 100%
Year
Net Cash Flow, $
0
1
2
3
-30,000
20,000
15,000
-2000
Multinomial Logit Model - Sample Problem
Let the number of trips from zone i to zone j is 5000, and two modes are
available which has the characteristics given in below. Compute the trips
made by the three modes and the fare required to travel by each mode.
coefficient
car
bus
train
ti twalk tij Fij
0.03
0.04 0.06 0.1
20
18
30
6
12
5
10
3
2
Pij
0.1
Cij = a₁tij + a₂tij + asti; +astnij + a5 Fij + a60j + d
Chapter 5 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - Prob. 3PCh. 5 - Prob. 4PCh. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prob. 9PCh. 5 - Prob. 10P
Ch. 5 - Prob. 11PCh. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - The arrival rate at a parking lot is 6 veh/min....Ch. 5 - Prob. 16PCh. 5 - At the end of a sporting event, vehicles begin...Ch. 5 - Prob. 18PCh. 5 - Prob. 19PCh. 5 - Vehicles begin arriving at a single toll-road...Ch. 5 - Vehicles begin to arrive at a toll booth at 8:50...Ch. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Vehicles begin to arrive at a parking lot at 6:00...Ch. 5 - At a parking lot, vehicles arrive according to a...Ch. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - Prob. 32PCh. 5 - Prob. 33PCh. 5 - Vehicles arrive at a recreational park booth at a...Ch. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - A truck weighing station has a single scale. The...Ch. 5 - Prob. 39PCh. 5 - Prob. 40PCh. 5 - Vehicles leave an airport parking facility (arrive...Ch. 5 - Vehicles begin to arrive at a parking lot at 7:45...Ch. 5 - Prob. 43PCh. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - Prob. 48PCh. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 51PCh. 5 - Prob. 52PCh. 5 - A theme park has a single entrance gate where...Ch. 5 - Prob. 54PCh. 5 - Prob. 55P
Knowledge Booster
Similar questions
- Q2: For the project, its data shown below find: ● Time in weeks that gives a probability of %97.5 Probability of finishing the project 4 weeks more than TE Probability of finishing the project 3 weeks less than TE Act. 1-2 2-3 2-5 2-4 3-4 3-7 5-6 6-7 4-7 0 8 4 7 7 4 7 10 10 4 M 10 5 9 6 8 14 14 5 P 24 12 21 11 8 15 24 24 12arrow_forwardPlease answer. I need the answer after 40 minutes. Rate will be given accordingly.arrow_forwardQUESTION 2 There are 30 ticket vending machines to service an hourly passenger demand of 8,750. How quickly must the process of purchasing tickets occur? Tickets are mandatory for all passengers. Provide your response to the nearest tenth of a second.arrow_forward
- A truck rental company has two types of trucks. Type A has 20 cubic meters of refrigerated space and 40 cubic meters of non-refrigerated space, and type B has 30 cubic meters of refrigerated space and also 30 cubic meters of non-refrigerated space. A food plant must ship 900 cubic meters of refrigerated food and 1200 cubic meters of non-refrigerated food. Suppose truck A rents for $0.90 per mile and B for $1.20. Find the number of trucks of each type that the plant should rent so as to minimize cost. Type A Type B Minimum Cost Note: Input numerical values only. Page 320arrow_forwardThere are 30 ticket vending machines to service an hourly passenger demand of 8,750. How quickly must the process of purchasing tickets occur? Tickets are mandatory for all passengers. Provide your response to the nearest tenth of a second.arrow_forwardA civil engineer takes a public ride going to his firm. The average time for his trip is 24 minutes, with a standard deviation of 3.80 minutes. If the office offers coffee from 8:50AM to 9:00AM, and he leaves his house at 8:35AM. what is the probability (in percent) that he misses coffee?arrow_forward
- SITUATION 21: The activities, duration and cost under normal and accelerated conditions for a network diagram are shown below. ACTIVITY NODE Duration, Days Costs, Pesos Normal Accelerated Normal Accelerated A 1-2 10 7 3000 3450 2-4 8 6 2600 3400 1-3 6 6 2000 2000 3-5 12 11 4800 5100 2-5 13 10 3900 4500 F 4-5 24 3 2400 2700 G 5-6 2 2 1800 1800 64. Determine the normal duration of the project... a. 20 b. 25 c. 23 d. 22 65. Determine the critical path of the network a. a-e-g b. c-d-g c. a-b-c-d-g d. a-b-f-g 66. Determine the normal cost a. 22950 b. 20500 c. 22250 d. 22550 TMOSBY B с D E -arrow_forwardAverage demand on a rural roadway ranges from zero to 600 veh/day when the cost per trip goes from $1.75 to zero. (a) Calculate the net user benefits per year (in dollars) if the cost decreases from $1.50 to $0.75/trip (assume a linear demand function). $ 29 x Your response is within 10% of the correct value. This may be due to roundoff error, or you could have a mistake in your calculation. Carry out all intermediate results roundoff error. (b) Compare the value calculated in (a) with the benefits as calculated in typical highway studies. (Enter the benefits in dollars as calculated in typical highway studies.) $ 88000 x Your response is within 10% of the correct value. This may be due to roundoff error, or you could have a mistake in your calculation. Carry out all intermediate results E roundoff error.arrow_forwardIn a survey in the base year, the trip attraction, number of employees and shopping area in the zones are found as follows: Zone 1 2 3 4 5 6 7 8 9 10 Trip attraction (Trips/day) 34,000 33,000 37,000 9,000 19,000 20,000 50,000 22,000 21,000 5,000 Number of employees (persons) 2000 1500 3000 500 1000 1000 3200 1800 1600 200 Shopping area (m²) 250,000 350,000 150,000 80,000 160,000 180,000 350,000 60,000 100,000 50,000 Prepare a excel worksheet to calculate the generation model by regression analysis.arrow_forward
- 2. If an activity whose normal duration is 15 days can be shortened to 10 days for an added cost of $2,000, what is the crash time and crash cost per day? Select one: a. 10 days; $400 b. 10 days; $2,000 c. 5 days; $10,000 d. 10 days; $20,000 e. 5 days; $400arrow_forwardThe network of a small construction project awarded to a contractor is shown in the following figure. The normal duration, crash duration, normal cost, and crash cost of all the activities are shown in the table. The indirect cost incurred by the contractor is INR 5000 per day. Normal Crash Normal Activity Duration Duration (days) 6. Crash Cost Cost (days) (NR) (INR) 15000 25000 4 Q 6000 12000 R 3 8000 9500 S 3 7000 10000 3 2 6000 9000 U 2 1 4000 6000 V 4 20000 28000 If the project is targeted for completion in 16 days, the total cost (in INR) to be incurred by the contractor would bearrow_forwardPlease indicate your final answer in the choices! Determine the lx and ly I'll rate!arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning
Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning