At a parking lot, vehicles arrive according to a Poisson process and are processed (parking fee collected) at a uniform deterministic rate at a single station. The mean arrival rate is 4.2 veh/min and the processing rate is 5 veh/min. Determine the average length of queue, the average time spent in the system, and the average waiting time in the queue.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
1. Estimate the queue dissipation time, maximum queue length, and total delay, given:
Time
Arrival Rate (veh/hour/lane)
Departure Rate (veh/hour/lane)
3:30 4:00 PM
4:00 8:00 PM
3:00 - 3:30 PM
1200
1800
1200
1200
900
1800
At an entrance to a toll bridge, four toll booths are open. Vehicles arrive at the bridge at an average rate of 1200
veh/h, and at the booth, drivers take an average of 10 seconds to pay their tolls. Both the arrival and departure
rates can be assumed to be exponentially distributed. How would the average queue length, time in the system
change if a fifth toll booth were opened?
Queue Analysis - Numerical
M/M/N
- Average length of queue
Ō
- Average time waiting in queue
- Average time spent in system
A = arrival rate
=
11
W=
Pop-1
1
NIN (1-p/NY
P/N<1.0
p+Ō_1
2
i=P+Q
2
μl
= departure rate
M/M/N - More Stuff
1
- Probability of having no vehicles
1
P₁
P₁ = N-10²²
pN
Σ
+
n = n! N!(1-p/N)
- Probability of having n vehicles
p"Po
for n ≤N
n!
www
P
=
P₁ =
n
- Probability of being in a queue
PAN
Pop
NIN(1-p/N)
A = arrival rate
p"Po
NT-NN!
p:
P/N
The gate entrance to a park opens at 8:00 AM and there are 18 vehicles in the queue waiting to enter. Vehicles continue to arrive (from
8:00 AM onward) at a constant rate of 8 veh/min. The gate attendant processes vehicles at a constant rate of 1 vehicle every 6
seconds. Assume D/D/1 queuing for the vehicle arrival and departure processes at this gate. What is the average delay per vehicle
(min/veh) from 8:00 AM until the queue clears?
0.9
1.1
4.5
9
Ο Ο
81
Chapter 5 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - Prob. 3PCh. 5 - Prob. 4PCh. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prob. 9PCh. 5 - Prob. 10P
Ch. 5 - Prob. 11PCh. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - The arrival rate at a parking lot is 6 veh/min....Ch. 5 - Prob. 16PCh. 5 - At the end of a sporting event, vehicles begin...Ch. 5 - Prob. 18PCh. 5 - Prob. 19PCh. 5 - Vehicles begin arriving at a single toll-road...Ch. 5 - Vehicles begin to arrive at a toll booth at 8:50...Ch. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Vehicles begin to arrive at a parking lot at 6:00...Ch. 5 - At a parking lot, vehicles arrive according to a...Ch. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - Prob. 32PCh. 5 - Prob. 33PCh. 5 - Vehicles arrive at a recreational park booth at a...Ch. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - A truck weighing station has a single scale. The...Ch. 5 - Prob. 39PCh. 5 - Prob. 40PCh. 5 - Vehicles leave an airport parking facility (arrive...Ch. 5 - Vehicles begin to arrive at a parking lot at 7:45...Ch. 5 - Prob. 43PCh. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - Prob. 48PCh. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 51PCh. 5 - Prob. 52PCh. 5 - A theme park has a single entrance gate where...Ch. 5 - Prob. 54PCh. 5 - Prob. 55P
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
State three examples of a static load application and three examples of a dynamic load application.
Materials for Civil and Construction Engineers (4th Edition)
11-1. Determine the moments at A,B, and C, then draw
the moment diagram for the beam. The moment of ine...
Structural Analysis (10th Edition)
What production method for steel shapes is specified by the following organizations? AISI (American Iron and St...
Structural Steel Design (6th Edition)
1.2 Explain the difference between geodetic and plane
surveys,
Elementary Surveying (14th Edition)
A 3 ft square footing carries a sustained load of 10 k. It is placed on the surface of a 30 ft thick saturated ...
Foundation Design: Principles and Practices (3rd Edition)
5.11 What error results on a 200-ft sight with a level if the rod reading is 6.307 ft but the top of the
7-ft r...
Elementary Surveying: An Introduction To Geomatics (15th Edition)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- The Arrival time of vehicles at the entrance of a baseball stadium has a mean value of 30 veh/ hr. If it takes 1.5 min for the issuance of parking tickets to be bought for occupants of each car. a.) Determine the expected length of queue , not including the vehicle being served. b.) What will be the average waiting time of a vehicle in the queue in min.?arrow_forwardThe arrival function and departure functions at a traffic facility are given below: Arrival function, A(t) = 8t+0.95t2 • Departure function, D(t) = 2t+1t2 where, t = time in minutes. Determine the value of t (in minutes) at which the queue length is the maximum.arrow_forwardVehicles arrive according to a Poisson process (random arrival) to a parking lot with mean arrival rate of 180 veh/hour, and are processed (they pay parking fee) at a uniform deterministic rate of 4 veh/min. (1) What type of queuing is this problem? D/D/1 M/D/1 M/M/1 (2) Determine: (I) the average waiting time and (II) the average length of the queuearrow_forward
- 7. Queue Theory: At the end of a sporting event, vehicles begin leaving a parking lot at 2(1) = 12 - 0.25t and vehicles are processed at u(t) = 2.5 + 0.5t (t is in minutes and 2(t) and u(t) are in vehicles per minute). Assume D/D/1 determine: Time when queue clears and total vehicle delay.arrow_forwardPassenger car arrive at the stop sign at an average rate of 280 per hour. Average waiting time at the stop sign is 12 sec. If both arrivals and departure are exponentially distributed, what would be the average delay per vehicle in minutes. Assume both arrival and departure rates are exponentially distributed.arrow_forwardA ramp meter operates during the morning peak period. Ramp meter cycles vary with time as shown in the table. The metering scheme allows one vehicle to pass the signal. The table below gives the number of vehicles demanding service on the ramp during the particular time intervals, the cumulative demand for the ramp for the morning peak, the ram meter cycle for each interval. Using a queuing diagram, determine the maximum queue, the maximum delay to any vehicle, and the total delay in the system. draw a figure.arrow_forward
- At time ? = 0, when the border inspection station was scheduled to open, eight vehicles were already waiting in a queue in front of an inspection booth. Vehicles continued to arrive at a rate of 4 veh/minute. The officer did not start the inspection until ? = 4 minutes. When ?≥4 minutes, the barrier was lifted and vehicles left at a rate of 7.5 veh/minute. Draw the vehicle arrival and departure curves in the following graph. From the graph, determine the maximum queue length and the time the queue disappears. Assume D/D/1 queuing.arrow_forwardThere is a single gate at an entrance to a recreational park where arriving vehicles must stop to pay their tickets. The park opens at 8:00AM, at which time vehicles begin to arrive at a rate of 480 veh/hr. After 20 minutes the arrival flow rate declines to 120 veh/hr, and it continues at that level for the remainder of the day. If the service time is 15 seconds per vehicle, and assuming D/D/1 queuing, determine the Length of Queue at 8:1OAM. Note: Round off your answers to the nearest whole number. Only include the numeric value of your answer without the unit (i.e. 22).arrow_forwardThere are 10 vehicles in a queue when an attendant opens a toll booth. Vehicles arrive at the booth at a rate of 4 per minute. The attendant opens the booth and improves the service rate over time following the function μ(t) = 1.1 + 0.30t, where μ(t) is in vehicles per minute and t is in minutes. When will the queue clear, what is the total delay, and what is the maximum queue length? draw a figurearrow_forward
- Answer questions 13, 14, 15 and 16 using the following paragraph: Vehicles arrive at the carpark of an airport. Vehicles have to queue at the single entrance gate of the carpark at 9:00 AM. The arrival rate is constant at 240 veh/hr. However, between 9:00 and 9:40 AM, the parking ticket machine at the entrance works slowly due to a malfunction, and consequently, each vehicle spends 30 seconds to take the parking ticket. After 9:40 AM, the problem is solved and vehicles spend only 10 seconds at the gate to take the ticket. What is the longest vehicle queue? Select one: a.70 b.64 c.80 d.20 OOarrow_forwardThere is a single gate at an entrance to a recreational park where arriving vehicles must stop to pay their tickets. The park opens at 8:00AM, at which time vehicles begin to arrive at a rate of 480 veh/hr. After 20 minutes the arrival flow rate declines to 120 veh/hr, and it continues at that level for the remainder of the day. If the service time is 15 seconds per vehicle, and assuming D/D/1 queuing, determine the Longest Vehicle Queue. Note: Round off your answers to the nearest whole number. Only include the numeric value of your answer without the unit (i.e. 22).arrow_forwardThere is a single gate at an entrance to a recreational park where arriving vehicles must stop to pay their tickets. The park opens at 8:00AM, at which time vehicles begin to arrive at a rate of 480 veh/hr. After 20 minutes the arrival flow rate declines to 120 veh/hr, and it continues at that level for the remainder of the day. If the service time is 15 seconds per vehicle, and assuming D/D/1 queuing, determine the time that the queue will dissipate. Answer must be in this format: *:**AM, minute time must be rounded off to the nearest whole number (i.e. 8:50AM)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
What Is A Construction Takeoff? | Are They Still Necessary In Quantity Surveying?; Author: Metroun Quantity Surveying;https://www.youtube.com/watch?v=uTWoDPtcOjg;License: Standard Youtube License