PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
7th Edition
ISBN: 9781119610526
Author: Mannering
Publisher: WILEY
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 5, Problem 34P
Vehicles arrive at a recreational park booth at a uniform deterministic rate of 5 veh/min. If uniform deterministic processing of vehicles (collecting of fees) begins 20 minutes after the first arrival and the total delay is 3200 veh-min, how long after the arrival of the first vehicle will it take for the queue to be cleared?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Vehicles arrive at a single toll booth beginning at8:00 A.M. They arrive and depart according to a uniformdeterministic distribution. However, the toll booth doesnot open until 8:10 A.M. The average arrival rate is 8veh/min and the average departure rate is 10 veh/min.Assuming D/D/1 queuing, when does the initial queueclear and what are the total delay, the average delay pervehicle, longest queue length (in vehicles), and the waittime of the 100th vehicle to arrive (assuming first-infirst-out)?
9- Vehicles arrive at a recreational park booth at a uniform deterministic rate of 4veh/min. If uniform
deterministic processing of vehicles (collecting of fees) begins 30 minutes after the first arrival and
the total delay is 3600 veh-min, how long after the arrival of the first vehicle will it take for the queue
to be cleared?
Vehicles arrive at a recreational park booth at a uniform deterministic rate of 4 veh/min. If uniform deterministic
processing of vehicles (collecting fees) begins 30 minutes after the first arrival and the total delay is 3600 veh-min,
how long after the arrival of the first vehicle will it take the queue to dissipate?
Chapter 5 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - Prob. 3PCh. 5 - Prob. 4PCh. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prob. 9PCh. 5 - Prob. 10P
Ch. 5 - Prob. 11PCh. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - The arrival rate at a parking lot is 6 veh/min....Ch. 5 - Prob. 16PCh. 5 - At the end of a sporting event, vehicles begin...Ch. 5 - Prob. 18PCh. 5 - Prob. 19PCh. 5 - Vehicles begin arriving at a single toll-road...Ch. 5 - Vehicles begin to arrive at a toll booth at 8:50...Ch. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Vehicles begin to arrive at a parking lot at 6:00...Ch. 5 - At a parking lot, vehicles arrive according to a...Ch. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - Prob. 32PCh. 5 - Prob. 33PCh. 5 - Vehicles arrive at a recreational park booth at a...Ch. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - A truck weighing station has a single scale. The...Ch. 5 - Prob. 39PCh. 5 - Prob. 40PCh. 5 - Vehicles leave an airport parking facility (arrive...Ch. 5 - Vehicles begin to arrive at a parking lot at 7:45...Ch. 5 - Prob. 43PCh. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - Prob. 48PCh. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 51PCh. 5 - Prob. 52PCh. 5 - A theme park has a single entrance gate where...Ch. 5 - Prob. 54PCh. 5 - Prob. 55P
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
1.2 Explain the difference between geodetic and plane
surveys,
Elementary Surveying (14th Edition)
5.11 What error results on a 200-ft sight with a level if the rod reading is 6.307 ft but the top of the
7-ft r...
Elementary Surveying: An Introduction To Geomatics (15th Edition)
State three examples of a static load application and three examples of a dynamic load application.
Materials for Civil and Construction Engineers (4th Edition)
11-1. Determine the moments at A,B, and C, then draw
the moment diagram for the beam. The moment of ine...
Structural Analysis (10th Edition)
A 3 ft square footing carries a sustained load of 10 k. It is placed on the surface of a 30 ft thick saturated ...
Foundation Design: Principles and Practices (3rd Edition)
What production method for steel shapes is specified by the following organizations? AISI (American Iron and St...
Structural Steel Design (6th Edition)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- QUESTION 1 3 booths, each of which can handle one vehicle every 6 second. a. If D/D/1 model is used, what is total service rate of the system? (you can express this in total vehicles that can be handled in 10 minutes) 6. Draw the queuing diagram (cumulative traffic volumes vs. time) with traffic upstream arriving volume and this service rate. C. Using the queuing diagram, determine the max queue, the longest delay to an individual vehicle and total delay (veh-min). Time Period 10-min Volume 7:00-7:10 200 स 7:10-7:20 400 7:20-7:30 500 7:30-7:40 250 7:40-7:50 200 7:50-8:00 150arrow_forwardA toll booth on a temple is open from 8:00 AM to 12 midnight. Vehicles start arriving at 7:45 AM at a uniform deterministic rate of six per minute until 8:15 AM and from then on at two per minute. If vehicles are processed at a uniform deterministic rate of six per minute, determine the (a) time of queue dissipation in minutes (b) total number of vehicles in queue and (c) total vehicle delayarrow_forwardThe arrival rate at a parking lot is 6 veh/ min. Vehicles start arriving at 6:00 P. M., and when the queue reaches 36 vehicles, service begins. If company policy is that total vehicle delay should be equal to 540 veh-min, what is the service rate? (Assume D/ D/ 1 queuing and a constant service rate.)arrow_forward
- Vehicles arrive at a single toll booth beginning at 7:00 A.M. at a rate of 8 veh/min. Service also starts at 7:00 A.M. at a rate of u(t)=6+0.2t where (f) is in vehicles per minute and it is in minutes after 7:00 A.M. Assuming D/D/1 queuing, determine when the queue will clear, the total delay, and the maximum queue length in vehicles.arrow_forwardThe arrival rate at a parking lot is 6 veh/min. Vehicles start arriving at 6:00 P.M., and when the queue reaches 36 vehicles, service begins. The company policy states that the total vehicle delay should be equal to 500 veh-min. Assuming D/D/1 queuing and a constant service rate, determine the maximum queue length.arrow_forwardThe arrival rate at a parking lot is 6 veh/min. Vehicles start arriving at 6:00 P.M., and when the queue reaches 36 vehicles, service begins. The company policy states that the total vehicle delay should be equal to 500 veh-min. Assuming D/D/1 queuing and a constant service rate, at what time did the queue clear?arrow_forward
- At 9 am, vehicles arrive at a toll booth facility at the rate of 480 vehicles/hour. Initially, the toll booth is closed from 9:00 am until 9:15 am. Then it opens from 9:15 with a service rate of 600 vehicles/hour. Assuming D/D/1 queuing, determine: (1) At what time queue disappears? (2) What is the total delay? (3) What is the maximum Queue length? (4) What is the queue length at 10:00 am? (5) What is maximum delay? (6) What is the delay for 160th vehicle?arrow_forwardehicles arrive at a single toll booth beginning at 8:00 A.M. They arrive and depart according to a uniform deterministic distribution. However, the toll booth does not open until 8:10 A.M. The average arrival rate is 8 veh/min and the average departure rate is 10 veh/min. Assuming D/D/1 queuing, when does the initial queue clear and what are the total delay, the average delay per vehicle, longest queue length (in vehicles), and the wait time of the 100th vehicle to arrive (assuming first-in-first- out)?arrow_forwardThe arrival rate at a parking lot is 6 veh/min. Vehicles start arriving at 6:00 P.M., and when the queue reaches 36 vehicles, service begins. The company policy states that the total vehicle delay should be equal to 500 veh-min. Assuming D/D/1 queuing and a constant service rate, determine the average delay of any vehicle.arrow_forward
- The gate entrance to a park opens at 8:00 AM and there are 18 vehicles in the queue waiting to enter. Vehicles continue to arrive (from 8:00 AM onward) at a constant rate of 8 veh/min. The gate attendant processes vehicles at a constant rate of 1 vehicle every 6 seconds. Assume D/D/1 queuing for the vehicle arrival and departure processes at this gate. What is the average delay per vehicle (min/veh) from 8:00 AM until the queue clears? 0.9 1.1 4.5 9 Ο Ο 81arrow_forwardVehicles arrive at a single toll booth beginning at 8:00 AM. They arrive and depart according to a uniform deterministic distribution. However, the toll booth does not open until 8:10 AM. The average arrival rate is 8 veh/min and the average departure rate is 10 veh/min. Assuming D/D/1 queuing, when does the initial queue clear and what are the total delay, the average delay per vehicle, longest queue length (in vehicles), and the wait time of the 100th vehicle to arrive (arrow_forwardVehicles begin arriving at Allen fieldhouse at 6:30 PM, at a constant rate of 4 per minute. One gate opens at 7:00 PM and processes cars at a rate of 5 vehicles per minute. At 7:10 PM, a second gate opens, doubling the rate at which cars are processed. What is the average vehicle delay? Assume D/D/1 queuing.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
What Is A Construction Takeoff? | Are They Still Necessary In Quantity Surveying?; Author: Metroun Quantity Surveying;https://www.youtube.com/watch?v=uTWoDPtcOjg;License: Standard Youtube License