Refer back to Problem 16. Suppose that in addition to the usual precedence constraints, there are two zoning constraints within the trim line. First, work elements K and L should be assigned to the same station; both use a common component, and assigning them to the same station conserves storage space. Second, work elements H and J cannot be performed at the same station.
- Using trial and error, balance the line as best you can.
- What is the efficiency of your solution?
Want to see the full answer?
Check out a sample textbook solutionChapter 5 Solutions
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Additional Business Textbook Solutions
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
Business in Action (8th Edition)
Operations and Supply Chain Management 9th edition
OPERATIONS MANAGEMENT IN THE SUPPLY CHAIN: DECISIONS & CASES (Mcgraw-hill Series Operations and Decision Sciences)
Operations Management, Binder Ready Version: An Integrated Approach
- Super Fun Industries manufactures four top-selling toys code-named A-148, B-356, B-457, and C-843. The following table shows how long it takes to process each toy through each required station. Note that all times are in minutes. Super Fun's manufacturing plant is open 12 hours a day, 5 days a week, and 8 hours on Saturday. b. If weekly demand for the four products are A-148=180 units, B-356=310 units, B-457=280 units, and C-843=300 units, which station is the bottleneck, and is it capable of producing all the toys demanded? The bottleneck for Super Fun Industries is ▼ Station 1 Station 2 Station 3 Station 4 , with a utilization of ______%. (Enter your response rounded to one decimal place.)arrow_forwardSuper Fun Industries manufactures four top-selling toys code named A-148, B-356, B-457, and C-843. The following table shows how long it takes to process each toy through each required station. Note that all times are in minutes. Super Fun's manufacturing plant is open 13 hours a day, 5 days a week, and 8 hours on Saturday. Processing Time Station 1 Processing Time Station 2 Processing Time Station 3 Processing Time Station 4 A-148 5 min 3 min 7 min 4 min a. If only toy A-148 is produced during a specific week, to the nearest whole number.) B-356 5 min 1 min 7 min 0 min B-457 0 min 5 min 2 min 11 min C-843 8 min 1 min 2 min 2 min units could be produced. (Enter your response rounded downarrow_forwardThe Theory of Constraints method is also referred to as the drum-buffer-rope method. True Falsearrow_forward
- An operatlons consultant for an automatic car wash wishes to plan for enough capacity to handle 60 cars per hour. Each car will have wash time of 2 minutes, but there is to be a 20 per centallowance for setup, delays and payment transactions. The installation capacity of car wash stalls should bearrow_forwardWhatYouNeed is an online retailer with operations in Northern Indiana. Their network includes five big warehouses. All of the warehouses are fully automated: packaging is performed by robots on top of electric conveyors. Although the company has saved a lot in labor costs by the use of this packaging line, it has resulted in some excessive waste of material. After some analysis of this waste issue, the company has discovered that the number of product types that are assigned to the packaging line is strongly correlated with the amount of wasted material. Based on this insight, their operations manager has built a mathematical expression that estimates the expected amount of waste from the packaging line as a function of the number of product types in it. The expression is as follows: W = (n-93)2 – (n-88) + 227 In this expression, n is the number of product types you are packing on the line and W is the hourly waste of packaging material (in lbs). Based on this expression, what is the…arrow_forwardWhatYouNeed is an online retailer with operations in Northern Indiana. Their network includes five big warehouses. All of the warehouses are fully automated: packaging is performed by robots on top of electric conveyors. Although the company has saved a lot in labor costs by the use of this packaging line, it has resulted in some excessive waste of material. After some analysis of this waste issue, the company has discovered that the number of product types that are assigned to the packaging line is strongly correlated with the amount of wasted material. Based on this insight, their operations manager has built a mathematical expression that estimates the expected amount of waste from the packaging line as a function of the number of product types in it. The expression is as follows: W = (n-93)2 – (n-88) + 227 In this expression, n is the number of product types you are packing on the line and W is the hourly waste of packaging material (in lbs). Based on this expression, how much will…arrow_forward
- A restaurant has a maximum capacity to serve 60 customers at any given point of time. However, over extended periods in a day, all tables are occupied and the restaurant staff are able to reconfigure the layout to regularly serve 70 customers with many customers still queuing up to get inside the restaurant. What is the utilization of the restaurant?arrow_forwardDue to the COVID‐19 pandemic, Julio’s Pizzeria, traditionally a high‐class, eat‐in only Italian restaurant in Malibu, has had to pivot in order to stay in business. One of their most sought‐after menu items is their sausage, ham, and pepperoni pizza. To accommodate the anticipated increase in carry‐out and delivery orders of this famous entrée, the restaurant manager, Kerry, has decided to create a small assembly line to speed up production of the pizzas. All tasks required to produce the pizza have been identified along with the time it takes to perform the task and the immediate predecessors for each task. if Desired Cycle time = Total time per hour / Demand per hour Desired Cycle time = 60 (minutes/hour) * 60 (seconds/minute) / 40 Desired Cycle time = 90 seconds and task are assigned to each work station below: Workstation 1: A, B Workstation 2: C, D, E, F, G Workstation 3: H, I then What is the efficiency of the most balanced line?arrow_forwardDue to the COVID‐19 pandemic, Julio’s Pizzeria, traditionally a high‐class, eat‐in only Italian restaurant in Malibu, has had to pivot in order to stay in business. One of their most sought‐after menu items is their sausage, ham, and pepperoni pizza. To accommodate the anticipated increase in carry‐out and delivery orders of this famous entrée, the restaurant manager, Kerry, has decided to create a small assembly line to speed up production of the pizzas. All tasks required to produce the pizza have been identified along with the time it takes to perform the task and the immediate predecessors for each task. if Desired Cycle time = 90 seconds What is the theoretical minimum number of stations?arrow_forward
- A production line at V. J. Sugumaran’s machineshop has three stations. The first station can process a unit in10 minutes. The second station has two identical machines,each of which can process a unit in 12 minutes. (Each unitonly needs to be processed on one of the two machines.) Thethird station can process a unit in 8 minutes. Which station isthe bottleneck station?arrow_forwardThe Pullman Mfg., Inc. three-station work cell illustrated in the figure below has two machines at station 1 in parallel. (The product needs to go through only one of the two machines before proceeding to station 2.) 12 min/unit Station 1 Machine A Station 1 Machine B 12 min/unit Station 2 12 min/unit Station 3 2 min/unit The manager, Ms. Hartley, has asked you to evaluate the system if she adds a parallel machine at station 2. a) The throughput time of the new work cell is 26 minutes (enter your response as a whole number). b) The bottleneck time of the new work cell is minutes per unit (enter your response as a whole number). Q Marrow_forwardThe trim line at PW is a small subassembly line that, along with other such lines, feeds into the final chassis line. The entire assembly line, which consists of more than 900 workstations, is to make PW’s new E cars. The trim line itself involves only 13 work elements and must handle 20 cars per hour. Work-element data are as follows: Work Element Time (Sec) Immediate Predecessor(s) A B C DE F G H I J K L M 1.8 0.4 1.6 1.5 0.7 0.5 0.8 1.4 1.4 1.4 0.5 1.0 0.8 None None None A A E B C D F,G H J I,K,L a. Draw a precedence diagram.b. What cycle time (in minutes) results in the desired output rate?c. What is the theoretical minimum number of stations?d. Use the longest work element decision rule to balance the line and calculate the efficiency of your solution.e. Use the most followers work element decision rule to balance the line and calculate the efficiency of your solution.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.