Concept explainers
a
Interpretation: Tasks for each workstation, total time and idle time are to be calculated.
Concept Introduction:
Longest task time first rule:In this rule of line balancing, the task which has highest cycle time is assigned first to the workstation.
a
Explanation of Solution
Cycle Time:
It is the time between two consecutive outputs come out from a process.
Here CT = Cycle time; A = Available time to produce output; R = Demand
Assembly line:
It is a manufacturing process in which goods or services created in previous steps are joined together. Assembly line efficiency can be calculated by following formula:
Here t = Task time; N= Actual no. of workstations; CT = cycle time
Idle time:
It is time for which machines or employees do not work due to the stoppage or work for any causes.
Here N= Actual no. of work stations; CT= cycle time; t = task time
Assembly time per shift (A) = 480 min
No. of shifts each day = 1
Output forecasted per shift(R) = 60 units
The theoretical minimum no. of the workstation can be obtained as follows:
Here CT= Cycle time; t= Sum of tasks time;
Theoretically, minimum no. of the workstation is:
Line balancing by longest task time first rule can be calculated as follows:
Lines balanced by the assignable task are determined by longest task time first rule. It has following steps:
Task 2 has highest processing time and no prerequisite is required therefore it is assigned on station A.
Although task 1 has highest processing time after task 2 in that case, total time exceeds the cycle time, therefore, task 4 and 3 is assigned on station A along with task 2 as no prerequisite is required for these tasks.
Task 1 is assigned to station B and there is a tie between task 6 and 7 as both task time is same.
Task5 is assigned to station C as its preceding task 1, 2, 3 has already assigned.
Either task 6 or 7 is assigned to station D.
Finally, task 8 is assigned to station E.
In actual situation no. of workstation are 5 in order to follow precedence and cycle time rule.
Station | Tasks | Total Time(min) | Idle Time(min) |
A | 2,4,3 | 8 | 0 |
B | 1,6 (or 7 tie) | 7 | 1 |
C | 5 | 6 | 2 |
D | 7 (or 6) | 3 | 5 |
E | 8 | 8 | 0 |
Total | 32 | 8 |
Total time at station A= Task Time of task 2+ Task Time of task 3+ Task Time of task 4
Total time at station A = 5+1+2
= 8 min
Idle time at station A= Cycle time-Total tasks at station A
= 8-8
= 0 min
Total time at station B = Task Time of task 1+ Task Time of task (6 or 7)
Total time at station B = 4+3
=7 min
Idle time at station B= Cycle time-Total tasks time at station B
=8-7
=1 min
Total time at station C = 6 min
Idle time at station C= Cycle time-Total tasks time at station c
= 8-6
= 2 min
Total time at station D= Task time of task 7 or 6
Total time at station D= 3 min
Idle time at station D= Cycle time-Total tasks time at station D
= 8-3
= 5 min
Total time at station E= Task Time of task D
Total time at station E= 8 min
Idle time at station E= Cycle time- Total tasks time at Station E
= 8-8
= 0 min
Total time
Total idle time:
It can be calculated as follows:
b
Interpretation:Assembly line efficiency is to be determined.
Concept Introduction:
Assembly line:It is a manufacturing process in which goods or services created in previous steps are joined together. Assembly line efficiency can be calculated by following formula:
Here t = Task time; N= Actual no. of workstations; CT = cycle time
b
Explanation of Solution
Assembly line efficiency can be calculated as follows:
c
Interpretation:Whether assembly line balance solution is good or bad and a criterion for assessment is to be explained.
Concept Introduction:
Idle time:It is time for which machines or employees do not work due to the stoppage or work for any causes.
c
Explanation of Solution
The assembly line balancing goodness is assessing its assembly line efficiency and idle time. In present case, although the assembly line efficiency is 80% the idle time is 8 min which is very high. It is highest for station D i.e. 5 min and at station B and C has 1 and 2 min idle time respectively. Therefore a fair chance that station B and C becomes bottleneck station for the assembly line. So it is not the very good balancing solution.
Want to see more full solutions like this?
- The desired daily output for an assembly line is 540 units. This assembly line will operate 720 minutes per day. The following table contains information on this product's task times and precedence relationships: TASK TASK TIME(SECONDS) IMMEDIATEPREDECESSOR A 35 — B 25 A C 35 A D 55 B E 5 B F 15 C G 30 E-D H 5 F-G b. What is the workstation cycle time? c. Balance this line using the largest number of following tasks. Use the longest task time as a secondary criterion. (Leave no cells blank - be certain to enter "0" wherever required.)arrow_forwardA local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed . The daily demand is 120 toys. Times of the tasks are 2.73,2.01 1, 2.13, 2.0, 2.61, 2.71 , and 2.95 minutes for A ,B,C,D,E,F, , and G, respectively . However, due to the nature of product there are precedence rules that must be observed . Such that Task A does not need any predecessors ; task B requires task be completed. To start task C and task D, each require task B to be completed . Task C must be completed prior to stating task E. Task F needs both task D and task Eto be completed . Finally, task G can start only once task F is completed . What is the minimum number of workstations needed? a. 4 b. 5 c. 6 d. None of them e. 8arrow_forwardAlocal toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73, 2.01 201 2.13, 2.0, 2.61, 2.71 , and 2.95 minutes for A,B,C,D,E,F, and respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task Adoes not need any predecessorsB requires task A to completed. To start task C and task Deach require task B to be completed. Task C must be completed prior to stating task E. Task F needs both task D and task Eto be completed. Finally, task G can start only once task Fis completed.Given we apply the most remaining tasks rule for balancing the assembly line with ties broken according to longest task time firstthe tasks that will be assigned to the SECOND workstation arearrow_forward
- A local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed. The daily demand is 100 toys. Times of the tasks are 2.73,2.01,2.13,2.0.2.61,2.71 , and 2.95 minutes for A A,B,C,D,E,F, and G, respectively. However, due to the nature of the product there are precedence rules that must be observed. Such that Task A does not need any predecessors; task B requires task A to be completed. To start task C and task D. each require task B to be completed. Task must be completed prior to stating task E. Task F needs both task D and task Eto be completedFinally, task G can start only once task Fis completed.Given we apply the most remaining tasks rule for balancing the assembly line, with ties broken according to longest task time first, the tasks that will be assigned to the THIRD workstation arearrow_forwardDevelop a solution for the following line balancing problem, allowing a cycle time of 5 minutes. Draw the precedence diagram for the set of tasks. Calculate the minimum number of workstations. Show what tasks are assigned to which stations? Using the heuristic rules How much idle time is there, summed over all workstations? What is the efficiency of this line? Work Task Task Time (seconds) Immediate Predecessor(s) A 70 - B 60 A C 120 B D 60 - E 240 C, D F 100 A G 190 E, Farrow_forwardA local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed . The daily demand is 100 toys. Times of the tasks are 2.73,2.01 1,2.13,2.0,2.61,2. 2.71 , and 2.95 minutes for A, B, C, D, E, F , and G , respectively . However , due to the nature of the product there are precedence rules that must be observed . Such that Task A does not need any predecessors ; task B requires task A to be completed . To start task C and task D, each require task B to be completed . Task C must be completed prior to stating task E. Task F needs both task D and task E to be completed . Finally , task G can start only once task F is completed . What should be the calculated cycle time in minutes ? a. 0.9 b. 4.5 c. None is correct d. 4.8 e. 4.4arrow_forward
- A manutacturer is designing a product layout for a new product production. It plans to use a production line for B hours per day in order to meet forecasted demand of 100 units per day. The product requires 7 lasks in total. These tasks are namely, A, 8, CD, E, F, and G respectively. Task A does not have any predecessor to start. To start Task B, it requires Task A to be completed Starting tasks Cneeds, the tack B to be completed. Also, starting task D needed task B to be completed Task E can only start upon completion of Task C. Whescas starting lask F needs the completion of both the tasks D and E Finally, starting task G needed, task Fto be completed. 1the processing times for tasks, A BC D, E F, andG are 28, 2.1, 0.9, 1.0, 1.2, 1.8, are 4.7 minutes respectively. Applying the most following tasks nule for balancing the assembly line, with ties broken according to longest task time first, the tasks that will be assigned to the FIRST workstation are Select one OaAB, and C ODAB Oc None…arrow_forwardAs part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 230 units per 8-hour day. Task times and precedence relationships are as follows: Task Duration(minutes) ImmediatePredecessor a 0.2 - b 0.6 a c 0.4 b d 0.7 - e 1.6 d f 1.8 c g 2 e, farrow_forwardFrancis Johnson’s plant needs to design an efficient assembly line to make a new product. The assembly line needs to produce 15 units per hour, and there is room for only four workstations. The tasks and the order in which they must be performed are shown in the following table. Tasks cannot be split, and it would be too expensive to duplicate any task. TASK TASK TIME (MINUTES) IMMEDIATE PREDECESSOR A 1 — B 2 — C 3 — D 1 A, B, C E 3 C F 2 E G 3 E What is the workstation cycle time required to produce 15 units per hour? Note: Round your answer to 1 decimal place. Balance the line to use the fewest possible workstations to meet the cycle time found in part (b). Use whatever method you feel is appropriate. What is the efficiency of your line balance, assuming the line operates at the cycle time from part (b)? Note: Round your answer to 1 decimal place.arrow_forward
- A producer of inkjet printers is planning to add a new line of printers, and you have been asked to balance the process, given the following task times and precedence relationships. Assume that cycle time is to be the minimum possible. Task Length(minutes) Immediate(Predecessor) a 0.2 - b 0.4 a c 0.3 - d 1.3 b, c e 0.1 - f 0.8 e g 0.3 d, f h 1.2 g Click here for the Excel Data File a. Do each of the following: (1) Enter the number of following tasks for each of the tasks shown in the table below. (2) Assign tasks to stations in order of greatest number of following tasks. Use greatest positional weight as a tiebreaker rule. (3) Determine the percentage of idle time. (Round your answer to 2 decimal places.) (4) Compute the rate of output in printers per day that could be expected for this line, assuming a 420-minute working day. (Round your answer 2 decimal places.) b. Answer these questions: (1) What is the…arrow_forwardA manufacturer needs to produce 300 coffee pots per 8 hour day. The discrete tasks required to produce a coffee pot have been identified, timed in seconds, and ordered as indicated in the table.Based on your takt time, what is the theoretical minimum number of workstations? Task Time Predecessors A 75 -- B 25 A C 40 A D 20 B, C E 50 C F 70 E G 45 D H 25 G I 15 G J 40 F, H, Iarrow_forwardA local toy manufacturer is using a production line that runs 8 hours per day and produces a toy that requires a total of 7 tasks to be performed . The daily demand is 100 toys . Times of the tasks are 2.73,2.01 ,2.13,2.0,2.61,2.71 and 2.95 minutes for A,B,C,D,E,F, and G, respectively . However , due to the nature of the product there are precedencerules that must be observed . Such that Task A does not need any predecessors ; task B requires task A to becompleted . To start task C and task Deach require task B to be completed . Task must be completed prior to stating task E. Task F needs both task and task E to be completed . Finally , task G can start only once task F is completed . Given we apply the most remaining tasks rule for balancing the assembly line , with ties broken according to longesttask time first , the tasks that will be assigned to the THIRD workstation are a. D and F b . None is the correct answer c. D only d. E only e. B, C , and Darrow_forward