Principles Of Operations Management
11th Edition
ISBN: 9780135173930
Author: RENDER, Barry, HEIZER, Jay, Munson, Chuck
Publisher: Pearson,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 6.S, Problem 15P
a)
Summary Introduction
To construct: A 3-sigma p-chart using the information.
Introduction: Control charts used to determine whether the process is under control or not. Attributes and variables are the factors under the control charts.
b)
Summary Introduction
To determine: Whether the process is in control if the number of defectives for next three days are 12, 5, and 13.
Introduction: Control charts used to determine whether the process is under control or not. Attributes and variables are the factors under the control charts.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
You own a donut shop. You have been getting customer complaints about the quality of the donuts and decide to take a daily sample to count the number of defects on each donut. What type of control chart would be the most appropriate to use for this purpose?
Group of answer choices
a X-bar
b R
c P
d C
e Cpk
The results of an inspection of DNA samples takenover the past 10 days are given below. Sample size is 100.
a) Construct a 3-sigma p -chart using this information.
b) Using the control chart in part (a), and finding that the num-ber of defectives on the next three days are 12, 5, and 13, is the
process in control?
An X-bar control chart designed with L=3 and constant sample size "n" has UCL=130.013 and
LCL=125.987, if the process is under control and its standard deviation is sigma=1.5, what is the
sample size "n"?
not enough information
4
6
10
8.
Chapter 6 Solutions
Principles Of Operations Management
Ch. 6.S - Prob. 1DQCh. 6.S - Define in statistical control.Ch. 6.S - Prob. 3DQCh. 6.S - Prob. 4DQCh. 6.S - Prob. 5DQCh. 6.S - Prob. 6DQCh. 6.S - Prob. 7DQCh. 6.S - Prob. 8DQCh. 6.S - Prob. 9DQCh. 6.S - Prob. 10DQ
Ch. 6.S - Prob. 11DQCh. 6.S - Prob. 12DQCh. 6.S - Prob. 13DQCh. 6.S - Prob. 14DQCh. 6.S - Prob. 15DQCh. 6.S - Prob. 16DQCh. 6.S - Prob. 17DQCh. 6.S - Prob. 18DQCh. 6.S - Prob. 19DQCh. 6.S - Prob. 1PCh. 6.S - Prob. 2PCh. 6.S - Prob. 3PCh. 6.S - Prob. 4PCh. 6.S - Prob. 5PCh. 6.S - Prob. 6PCh. 6.S - Prob. 7PCh. 6.S - Prob. 8PCh. 6.S - Prob. 9PCh. 6.S - Prob. 10PCh. 6.S - Prob. 11PCh. 6.S - Prob. 12PCh. 6.S - Prob. 13PCh. 6.S - Prob. 14PCh. 6.S - Prob. 15PCh. 6.S - Prob. 16PCh. 6.S - Prob. 17PCh. 6.S - Prob. 18PCh. 6.S - Prob. 19PCh. 6.S - Prob. 20PCh. 6.S - Prob. 21PCh. 6.S - Prob. 22PCh. 6.S - Prob. 23PCh. 6.S - Prob. 24PCh. 6.S - Prob. 25PCh. 6.S - Prob. 28PCh. 6.S - Prob. 29PCh. 6.S - Prob. 30PCh. 6.S - Prob. 32PCh. 6.S - Prob. 33PCh. 6.S - Prob. 34PCh. 6.S - Prob. 35PCh. 6.S - Prob. 36PCh. 6.S - Prob. 37PCh. 6.S - Prob. 39PCh. 6.S - Prob. 40PCh. 6.S - Prob. 41PCh. 6.S - Prob. 42PCh. 6.S - Prob. 43PCh. 6.S - Prob. 44PCh. 6.S - Prob. 45PCh. 6.S - Prob. 46PCh. 6.S - Prob. 48PCh. 6.S - Prob. 49PCh. 6.S - Prob. 50PCh. 6.S - Prob. 51PCh. 6.S - Prob. 52PCh. 6.S - Prob. 53PCh. 6.S - Prob. 54PCh. 6.S - Prob. 55PCh. 6.S - Prob. 1CSCh. 6.S - Prob. 2CSCh. 6.S - Prob. 1.1VCCh. 6.S - Prob. 1.2VCCh. 6.S - Prob. 1.3VCCh. 6.S - Prob. 2.1VCCh. 6.S - Prob. 2.2VCCh. 6.S - Prob. 2.3VCCh. 6.S - Prob. 2.4VCCh. 6 - Prob. 1EDCh. 6 - Prob. 1DQCh. 6 - Prob. 2DQCh. 6 - Prob. 3DQCh. 6 - Prob. 4DQCh. 6 - Prob. 5DQCh. 6 - Prob. 6DQCh. 6 - Prob. 7DQCh. 6 - Prob. 8DQCh. 6 - Prob. 9DQCh. 6 - Prob. 10DQCh. 6 - Prob. 11DQCh. 6 - Prob. 12DQCh. 6 - Prob. 13DQCh. 6 - Prob. 14DQCh. 6 - Prob. 15DQCh. 6 - Prob. 16DQCh. 6 - Prob. 17DQCh. 6 - Prob. 18DQCh. 6 - An avant-garde clothing manufacturer runs a series...Ch. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Kathleen McFaddens restaurant in Boston has...Ch. 6 - Prob. 6PCh. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10PCh. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 18PCh. 6 - Prob. 19PCh. 6 - Prob. 20PCh. 6 - Prob. 21PCh. 6 - Prob. 1CSCh. 6 - Prob. 2CSCh. 6 - Prob. 3CSCh. 6 - Prob. 1.1VCCh. 6 - Prob. 1.2VCCh. 6 - Prob. 1.3VCCh. 6 - Prob. 1.4VCCh. 6 - Prob. 2.1VCCh. 6 - Prob. 2.2VCCh. 6 - Prob. 2.3VCCh. 6 - Prob. 2.4VCCh. 6 - Prob. 3.1VCCh. 6 - Prob. 3.2VCCh. 6 - Prob. 3.3VCCh. 6 - Prob. 3.4VCCh. 6 - Prob. 3.5VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Explain how a person using 2-sigma control charts will more easily find samples “out of bounds” than 3-sigma control charts. What are some possible consequences of this fact?arrow_forwardManagement at Webster Chemical Company is concerned as to whether caulking tubes are being properly capped. If a significant proportion of the tubes are not being sealed, Webster is placing its customers in a messy situation. Tubes are packaged in large boxes of 135. Several boxes are inspected, and the following numbers of leaking tubes are found: View an example Sample 1 2 3 Get more help. 4 Tubes 7 7 8 5 1 5 6 7 Calculate p-chart three-sigma control limits to assess whether the capping process is in statistical control. The UCL, equals 1 Sample 8 8 9 10 11 12 13 14 Tubes 7 2 4 8 6 9 MacBook Pro 3 Sample 15 16 17 18 19 20 Total Tubes 8 3 3 5 and the LCL equals (Enter your responses rounded to three decimal places. If your answer for LCL, is negative, enter this value as 0.) 3 6 104 Clear all Check answer Oarrow_forwardSampling four pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results: Develop appropriate control charts and determine whether thereis any cause for concern in the cutting process. Plot the informationand look for patterns.arrow_forward
- The results of inspection of DNA samples taken over the past 10 days are given below. Sample size is 100. LCLp Day Defectives = 1 5 2 7 3 7 4 9 5 5 6 6 a) The upper and lower 3-sigma control chart limits are: UCL = 0.127 (enter your response as a number between 0 and 1, rounded to three decimal places). (enter your response as a number between 0 and 1, rounded to three decimal places). 7 1 8 6 9 10 10 1arrow_forwardThirty-five samples of size 7 each were taken from a fertilizer-bag-filling machine at Panos Kouvelis Lifelong Lawn Ltd. The results were: Overall mean = 54.75 lb.; Average range R = 1.78 lb. a) For the given sample size, the control limits for 3-sigma x chart are: Upper Control Limit (UCL) = lb. (round your response to three decimal places).arrow_forward1. The data shown in Table 1 are x and R values for 20 samples of size n= 5 taken from a process producing bearings. The measurements are made on the inside diameter of the bearing, with only the last three decimals recorded (i.e., 31.6 should be 0.50316). Please show all your work for full credit. (a) Set up x and R charts on this process. Does the process seem to be in statistical control? If necessary, revise the trial control limits. (b) Assume that diameter is normally distributed. Estimate the process standard deviation. Sample R Sample R 1 31.6 4 11 29.8 4 33.0 3 12 34.0 4 35.0 4 13 33.0 10 4 32.2 4 14 34.8 4 5 33.8 38.4 31.6 15 35.6 7 3 16 30.8 7 4 17 33.0 5 8 36.8 10 18 31.6 3 9. 35.0 15 19 28.2 9 10 34.0 6 20 33.8 Table 1: Bearing Diameter Dataarrow_forward
- The results of inspection of DNA samples taken over the past 10 days are given below. Sample size is 100. Day 1 2 3 4 5 6 7 8 9 10 Defectives 7 9 9 11 7 8 0 11 13 2 The upper and lower 3-sigma control chart limits are: UCLp = (enter your response as a number between 0 and 1, rounded to three decimal places). LCLp = (enter your response as a number between 0 and 1, rounded to three decimal places).arrow_forwardExplain how to construct process control chart and use them to determine whether a process is out of statistical control?arrow_forwardThe results of inspection of DNA samples taken over the past 10 days are given below. Sample size is 100. Day 1 2 3 4 5 6 7 8 9 10 Defectives 6 8 8 10 6 7 0 9 12 1 a) The upper and lower 3-sigma control chart limits are: Part 2 UCLp = enter your response here (enter your response as a number between 0 and 1, rounded to three decimal places).arrow_forward
- Can someone please explain to me how to complete 3-sigma control limits (upper and Lower) using Excel? This is the question I am trying to answer: Thirty-five samples of size 7 each were taken from a fertilizer-bag-filling machine at Panos Kouvelis Lifelong Lawn Ltd. The results were: Overall mean = 57.75 lb., Average range R = 1.78 lb.a) For the given sample size, the control limits for 3-sigma x chart are:Upper Control Limit (UCL) = ____Ib (round your response to three decimal places)arrow_forwardThe defect rate for data entry of insurance claims hashistorically been about 1.5%.a) What are the upper and lower control chart limits if you wishto use a sample size of 100 and 3-sigma limits?b) What if the sample size used were 50, with 3s ?c) What if the sample size used were 100, with 2s ?d) What if the sample size used were 50, with 2s ?e) What happens to snp when the sample size is larger?f) Explain why the lower control limit cannot be less than 0.arrow_forwardThe overall average on a process you are attempting to monitor is 60.0 units. The process population standard deviation is 1.72. Sample size is given to be 4. Part 2 a) Determine the 3-sigma x-chart control limits. Upper Control Limit (UCLx)=enter your response here units (round your response to two decimal places). Part 3 Lower Control Limit (LCLx)=enter your response here units (round your response to two decimal places). Part 4 b) Now determine the 2-sigma x-chart control limits. Upper Control Limit (UCLx)=enter your response here units (round your response to two decimal places). Part 5 Lower Control Limit (LCLx)=enter your response here units (round your response to two decimal places). Part 6 How do the control limits change? A. The control limits are tighter for the 3-sigma x-chart than for the 2-sigma x-chart. B. The control limits for the 2-sigma x-chart and for the 3-sigma x-chart are the same. C. The control limits…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.