Chapter 6.S, Problem 37P
Summary Introduction
To determine: If the process is under control.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Daily samples of I 00 power drills are removed fromthe assembly line at Drills by Stergios Fotopoulos and inspectedfor defects. Over the past 21 days, the following information hasbeen gathered. Develop a 3 standard deviation (99.73% confidence)p-chart and graph the samples. Is the process in control?
Waiting time (minute) at a Tim Horton is monitored using sample mean and range control charts. Six samples of n = 10 observations have been obtained and the sample means and ranges computed (in minutes):
Determine the upper and lower limits for sample mean and range control charts.
Is the process in control? Draw appropriate control chart (s).
The number of workmanship nonconformities (imperfections) observed in the final inspection of disk-drive
assemblies has been tabulated as shown in the following table. Which one of the following is closest to the upper
control limit for the 8 day using the appropriate control chart.
Nonconformities on assemblies
Day Total number of Number of
Day Total number of
Number of
imperfections
assemblies
imperfections
assemblies
inspected
inspected
1
10
6
26
3
16
7
4
14
2
17
8.
25
4
23
9
1
12
4
18
10
10
Select one:
a. 0.45080
b. 0.55214
c. 0.50145
d. 0.46512
e. 0.41048
3.
4.
3.
Chapter 6 Solutions
Principles Of Operations Management
Ch. 6.S - Prob. 1DQCh. 6.S - Define in statistical control.Ch. 6.S - Prob. 3DQCh. 6.S - Prob. 4DQCh. 6.S - Prob. 5DQCh. 6.S - Prob. 6DQCh. 6.S - Prob. 7DQCh. 6.S - Prob. 8DQCh. 6.S - Prob. 9DQCh. 6.S - Prob. 10DQ
Ch. 6.S - Prob. 11DQCh. 6.S - Prob. 12DQCh. 6.S - Prob. 13DQCh. 6.S - Prob. 14DQCh. 6.S - Prob. 15DQCh. 6.S - Prob. 16DQCh. 6.S - Prob. 17DQCh. 6.S - Prob. 18DQCh. 6.S - Prob. 19DQCh. 6.S - Prob. 1PCh. 6.S - Prob. 2PCh. 6.S - Prob. 3PCh. 6.S - Prob. 4PCh. 6.S - Prob. 5PCh. 6.S - Prob. 6PCh. 6.S - Prob. 7PCh. 6.S - Prob. 8PCh. 6.S - Prob. 9PCh. 6.S - Prob. 10PCh. 6.S - Prob. 11PCh. 6.S - Prob. 12PCh. 6.S - Prob. 13PCh. 6.S - Prob. 14PCh. 6.S - Prob. 15PCh. 6.S - Prob. 16PCh. 6.S - Prob. 17PCh. 6.S - Prob. 18PCh. 6.S - Prob. 19PCh. 6.S - Prob. 20PCh. 6.S - Prob. 21PCh. 6.S - Prob. 22PCh. 6.S - Prob. 23PCh. 6.S - Prob. 24PCh. 6.S - Prob. 25PCh. 6.S - Prob. 28PCh. 6.S - Prob. 29PCh. 6.S - Prob. 30PCh. 6.S - Prob. 32PCh. 6.S - Prob. 33PCh. 6.S - Prob. 34PCh. 6.S - Prob. 35PCh. 6.S - Prob. 36PCh. 6.S - Prob. 37PCh. 6.S - Prob. 39PCh. 6.S - Prob. 40PCh. 6.S - Prob. 41PCh. 6.S - Prob. 42PCh. 6.S - Prob. 43PCh. 6.S - Prob. 44PCh. 6.S - Prob. 45PCh. 6.S - Prob. 46PCh. 6.S - Prob. 48PCh. 6.S - Prob. 49PCh. 6.S - Prob. 50PCh. 6.S - Prob. 51PCh. 6.S - Prob. 52PCh. 6.S - Prob. 53PCh. 6.S - Prob. 54PCh. 6.S - Prob. 55PCh. 6.S - Prob. 1CSCh. 6.S - Prob. 2CSCh. 6.S - Prob. 1.1VCCh. 6.S - Prob. 1.2VCCh. 6.S - Prob. 1.3VCCh. 6.S - Prob. 2.1VCCh. 6.S - Prob. 2.2VCCh. 6.S - Prob. 2.3VCCh. 6.S - Prob. 2.4VCCh. 6 - Prob. 1EDCh. 6 - Prob. 1DQCh. 6 - Prob. 2DQCh. 6 - Prob. 3DQCh. 6 - Prob. 4DQCh. 6 - Prob. 5DQCh. 6 - Prob. 6DQCh. 6 - Prob. 7DQCh. 6 - Prob. 8DQCh. 6 - Prob. 9DQCh. 6 - Prob. 10DQCh. 6 - Prob. 11DQCh. 6 - Prob. 12DQCh. 6 - Prob. 13DQCh. 6 - Prob. 14DQCh. 6 - Prob. 15DQCh. 6 - Prob. 16DQCh. 6 - Prob. 17DQCh. 6 - Prob. 18DQCh. 6 - An avant-garde clothing manufacturer runs a series...Ch. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Kathleen McFaddens restaurant in Boston has...Ch. 6 - Prob. 6PCh. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10PCh. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 18PCh. 6 - Prob. 19PCh. 6 - Prob. 20PCh. 6 - Prob. 21PCh. 6 - Prob. 1CSCh. 6 - Prob. 2CSCh. 6 - Prob. 3CSCh. 6 - Prob. 1.1VCCh. 6 - Prob. 1.2VCCh. 6 - Prob. 1.3VCCh. 6 - Prob. 1.4VCCh. 6 - Prob. 2.1VCCh. 6 - Prob. 2.2VCCh. 6 - Prob. 2.3VCCh. 6 - Prob. 2.4VCCh. 6 - Prob. 3.1VCCh. 6 - Prob. 3.2VCCh. 6 - Prob. 3.3VCCh. 6 - Prob. 3.4VCCh. 6 - Prob. 3.5VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The upper and lower specification limits for a component are 5.20, and 5.30 ounces, respectively. The process standard deviation is .05, and the process average is 5.24 ounces. a) Calculate Cpk. (Show formula and calculations) b) Does the process posses six sigma capability? Why or Why not? Please explain.arrow_forwardThe upper and lower limits for diving ring diameters made by John's Swimming Co. are 40 and 39 cm., respectively. John took 11 samples with the following average diameters (39, 39.1, 39.2, 39.3, 39.4, 39.5 39.6, 39.7, 39.8, 39.9, 40). Calculate for the UCL and LCL. Is the process in control?arrow_forwardQuality Engineering question What is Statistical Process Control? With what purpose is it used for? Please explain breifly with an example. Please answer in your own words.arrow_forward
- 621 Daily samples of 100 power drills are removed from Drill Master's assembly line and in- spected for defects. Over the past 21 days, the following information has been gathered. Develop a 3 standard deviation (99.73% confidence) p-chart and graph the samples. Is the process in control? Number of Defective Drills Number of Defective Drills Day Day 6. 12 13 4 5. 14 3 15 16 17 6. 18 5. 8. 19 9. 20 3 10 21 7 11 643t n36 37 123 456Narrow_forwardThe inner diameter of piston rings follows a normal distribution with mean 75mm and variance =9. The sample size is 5, X-bar chart is established. If L =2, what is the type I error rate when process is in-control? If we change the control limits to UCL = 78.354, and LCL = 71.646, what is Type I error rate?arrow_forwardPepsi wants to conduct a study to determine whether their process is under control or not. For that reason, a sample of six bottles are collected and measured by the quality manger five times a day. 1 2 3 4 5 6 1 12.11 12.15 12.09 12.13 12.06 12.09 2 12.1 12.12 12.09 12.12 12.11 12.13 3 12.11 12.1 12.15 12.08 12.1 12.07 4 12.08 12.11 12.11 12.12 12.1 12.1 5 12.1 12.12 12.1 12.1 12.11 12.14 What is the sample size and what is the number of samples? Given the table above, draw a conclusion about the process.arrow_forward
- Q3 Following is the number of defects in daily samples (n=100) in January. Create the P and C charts and decide if the process is in control. Sample Day Number of Defects Sample Day Number of Defects i Xi i Xi 6. 8. 1 16 6. 2 17 4 3 8. 18 6. 4 13 19 8. 6. 6. 9. 20 2 6. 21 7 7 22 4 8. 7 23 4 9. 1 24 10 8. 25 1 11 26 12 2 27 15 13 4 28 1 14 29 4 15 4 30 1 31 5arrow_forwardWidgets are made in a two-shift operation. Management is wondering if there is any difference in the proportion of defectives produced by these two shifts. a. How would you use the p control chart to determine if there is a difference between the two shifts? Explain. b. On the first shift, samples of 200 units have been used and p = .06. Calculate CL, UCL, LCL for the first shift. c. On the second shift, six samples of 200 units have been taken with the proportion of defectives .04, .06,.10, .02, .05, and .03. Using the samples from the second shift, has the process mean shifted upward or downward? Explain.arrow_forwardQuality Engineering question What is Statistical Process Control? With what purpose is it used for? Please explain with an example. Please answer in your own words.arrow_forward
- explain in detail How can the value of a human life be included in the cost of quality control?arrow_forwardA manager wishes to build a control chart for a process. A total of five (05) samples are collected with four (04) observations within each sample. The sample means (X-bar) are; 14.09, 13.94,16.86, 18.77, and 16.64 respectively. Also, the corresponding ranges are; 9.90, 7.73, 4.41, 7.56, and 3.49 respectively. The lower and upper control limits of the x-bar chart are respectively Select one: a. 11.23, 20.89 b. 12.40, 19.72 C. 11.47, 16.55 d. 18.55, 13.47arrow_forwardA process that is assumed to be in control with limits of 91 +2 had sample averages for the X-bar chart of the following: 87.1, 87, 87.2, 89, 90, 88.5, 89.5, and 88. Which of the following statement below are correct? O a. Process mean is not in-control O b. None is correct O c. Process mean is in-control O d. Not enough information to determinearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.