SITUATION 21: The activities, duration and cost under normal and accelerated conditions for a network diagram are shown below. ACTIVITY NODE Duration, Days Costs, Pesos Normal Accelerated Normal Accelerated A 1-2 10 7 3000 3450 2-4 8 6 2600 3400 1-3 6 6 2000 2000 3-5 12 11 4800 5100 2-5 13 10 3900 4500 F 4-5 24 3 2400 2700 G 5-6 2 2 1800 1800 64. Determine the normal duration of the project... a. 20 b. 25 c. 23 d. 22 65. Determine the critical path of the network a. a-e-g b. c-d-g c. a-b-c-d-g d. a-b-f-g 66. Determine the normal cost a. 22950 b. 20500 c. 22250 d. 22550 TMOSBY B с D E -

Engineering Fundamentals: An Introduction to Engineering (MindTap Course List)
5th Edition
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Saeed Moaveni
Chapter19: Probability And Statistics In Engineering
Section: Chapter Questions
Problem 6P
icon
Related questions
Question
SITUATION 21: The activities, duration and cost under normal and accelerated conditions for a network diagram
are shown below.
ACTIVITY NODE
Duration, Days
Costs, Pesos
Normal Accelerated
Normal
Accelerated
A
1-2
10
7
3000
3450
2-4
8
6
2600
3400
1-3
6
6
2000
2000
3-5
12
11
4800
5100
2-5
13
10
3900
4500
F
4-5
24
3
2400 2700
G
5-6
2
2
1800
1800
64. Determine the normal duration of the project...
a. 20
b. 25
c. 23
d. 22
65. Determine the critical path of the network
a. a-e-g
b. c-d-g
c. a-b-c-d-g
d. a-b-f-g
66. Determine the normal cost
a. 22950
b. 20500
c. 22250
d. 22550
TMOSBY
B
с
D
E
-
Transcribed Image Text:SITUATION 21: The activities, duration and cost under normal and accelerated conditions for a network diagram are shown below. ACTIVITY NODE Duration, Days Costs, Pesos Normal Accelerated Normal Accelerated A 1-2 10 7 3000 3450 2-4 8 6 2600 3400 1-3 6 6 2000 2000 3-5 12 11 4800 5100 2-5 13 10 3900 4500 F 4-5 24 3 2400 2700 G 5-6 2 2 1800 1800 64. Determine the normal duration of the project... a. 20 b. 25 c. 23 d. 22 65. Determine the critical path of the network a. a-e-g b. c-d-g c. a-b-c-d-g d. a-b-f-g 66. Determine the normal cost a. 22950 b. 20500 c. 22250 d. 22550 TMOSBY B с D E -
Expert Solution
steps

Step by step

Solved in 3 steps with 2 images

Blurred answer
Knowledge Booster
Control survey and geodetic reductions
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Engineering Fundamentals: An Introduction to Engi…
Engineering Fundamentals: An Introduction to Engi…
Civil Engineering
ISBN:
9781305084766
Author:
Saeed Moaveni
Publisher:
Cengage Learning