Is the capacity of the bottleneck larger than, equal to, or smaller than the capacity of the process?
- a. Larger than
- b. Equal to
- c. Smaller than
- d. The answer depends on the specific process under consideration.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
n a manufacturing process, a molded part spends 7 hours in inventory before being placed in a deburring machine, where the part is processed for 2 minutes. After deburring, the part spends 4 hours in inventory waiting for its turn on the polishing machine. The part then spends 7 minutes in polishing before waiting 6 hours in line to be painted. The part goes through a painting process that takes 7 minutes, then spends 11 hours in inventory before being shipped to the customer.
What is the percentage of value-added time for the part?
Is the capacity of the bottleneck larger than, equal to, or smaller than the capacity of the process?a. Larger thanb. Equal toc. Smaller thand. The answer depends on the specific process under consideration.
In a job shop, effective capacity is only 43 percent of design capacity, and actual output is 71 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is its effective capacity?a. The Design Capacity needed to achieve the required actual job outputs = (round to whole number)b. The Effective Capacity needed to achieve the required actual job outputs = (round to whole number)
Chapter 3 Solutions
Operations Management
Ch. 3 - Prob. 1CQCh. 3 - Prob. 2CQCh. 3 - Prob. 3CQCh. 3 - Prob. 4CQCh. 3 - You observe a long line at the airport security....Ch. 3 - Prob. 6CQCh. 3 - What is the maximum utilization a resource can...Ch. 3 - Is the capacity of the bottleneck larger than,...Ch. 3 - Prob. 9CQCh. 3 - You observe a vehicle registration department at...
Ch. 3 - Prob. 1PACh. 3 - A community health systems nurse team consists of...Ch. 3 - Consider a process consisting of three resources....Ch. 3 - Prob. 4PACh. 3 - Prob. 5PACh. 3 - Prob. 6PACh. 3 - Prob. 7PACh. 3 - Consider a four-step serial process with...Ch. 3 - Consider a four-step serial process with the...Ch. 3 - Prob. 10PACh. 3 - Prob. 11PACh. 3 - The Tesla Model S, one of the most sought-after...Ch. 3 - The Tesla Model S, one of the most sought-after...Ch. 3 - The Tesla Model S, one of the most sought-after...Ch. 3 - The Tesla Model S, one of the most sought-after...
Additional Business Textbook Solutions
Find more solutions based on key concepts
There is a huge demand in the United States and elsewhere for affordable women’s clothing. Low-cost clothing re...
Loose-leaf for Operations Management (The Mcgraw-hill Series in Operations and Decision Sciences)
There is a huge demand in the United States and elsewhere for affordable women’s clothing. Low-cost clothing re...
Operations Management
What is precedent, and how does it affect common law?
Business in Action (8th Edition)
2. Identify four people who have contributed to the theory and techniques of operations management.
Operations Management
2. In what circumstances might a market-pull approach or a technology-push approach to new-product design be th...
OPERATIONS MANAGEMENT IN THE SUPPLY CHAIN: DECISIONS & CASES (Mcgraw-hill Series Operations and Decision Sciences)
What are the three major business functions, and how are they related to one another? Give specific examples.
Operations Management, Binder Ready Version: An Integrated Approach
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The company has the following information about its two service departments and two production departments, Cutting and Assembly: Departments SquareFeet Number ofEmployees Maintenance Department 500 20 Cafeteria Department 1,400 10 Cutting Department 1,500 60 Assembly Department 7,100 20 What is the percentage (proportional) usage of the Maintenance Department by the Cutting Department?arrow_forwardIn a job shop, effective capacity is only 79 percent of design capacity, and actual output is 53 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is its effective capacity? a. The Design Capacity needed to achieve the required actual job outputs Blank 1 (round to whole number) b. The Effective Capacity needed to achieve the required actual job outputs = Blank 2 (round to whole number) Blank 1 Add your answerarrow_forward3.Consider the following three-stage production process of glass ceramics. The process is experiencing severe quality problems related to insufficiently trained workers. Specifically, 20 percent of the parts going through operation 1 are badly processed by the operator. Rather than scrapping the unit, it is moved to a highly skilled rework operator, who can correct the mistake and finish up the unit completely within 15 minutes. The same problem occurs at station 2, where 10 percent of the parts are badly processed, requiring 10 minutes of rework. Station 3 also has a 10 percent ratio of badly processed parts, each of them requiring 5 minutes by the rework operator. a)What is the utilization of station 2 if work is released into the process at a rate of 5 units per hour? b)Where in the process is the bottleneck? Why? (Remember, the bottleneck is the resource with the lowest capacity, independent of demand.)arrow_forward
- Does the process optimise the desired demand of the customer?arrow_forwardA process is designed to produce 2,050 units per hour. The process has a scrap rate of 0.9% and a 14% inherent inefficiency. Assuming that the actual output of the process is 1,550 units per hour, what is the process design capacity, available capacity, actual capacity, capacity utilization, efficiency and the output gap for this process? The design capacity is ____ units per hour. (Enter your response as a whole number.)arrow_forwardA company that produces liquid facial lotion processes 2,375 lbm per hour of the product (ρ = 1.144 g/cm3).The production planning of the company is two shifts, one of 8 hours and the other of 6 hours per day and 300 working days per year. Calculate:a) How many liters of lotion are processed per year?b) How many bottles are required annually, if each bottle has a volume of 485 mL and they are filled to 95%?of your capacity?c) The company has a request from a customer for 795,350 bottles to deliver in a month. The companywill achieve this production?d) In case of not complying with the production, what would you do as a production manager to comply with therequested by the client? Justify your answer with informationarrow_forward
- The Swanky Hotel provides room service for its guests. The process for room service begins with a room service manager who takes orders by phone at an average of 5 minutes per order. The manager then sends the order to the kitchen, where it takes an average of 16 minutes to prepare the food for each order. There are four chefs in the kitchen. If the customer requires a beverage (alcoholic or nonalcoholic), the room service manager sends the order to the bar at the same time the order is sent to the kitchen. It takes 3 minutes to fill the order by one bartender, and 80 percent of the orders require a beverage. When the kitchen and bar orders are both ready, a waiter will take them to the room and bill the guest. There are six waiters to provide the service, and each order takes 20 minutes for the waiter to complete. What is the capacity of the process, and what is the bottleneck? What is the throughput time of a typical order? Assume that on Friday evenings an average of 10…arrow_forwardA recurring maintenance job in a factory is being done by a three-man crew. Due to the nature of the job and space limitations, it was observed that two of the men were idle 37% of the time; one of the men was also idle an additional of the time, and at any given time only one man was required. The men were each paid P24.00 per hour. Each time the job was performed a set of tools and equipment with a value equivalent to P36.00 per hour was used. If the three-men crew could complete the work in 5 hours, which crew size would be the most economicalarrow_forwardThe Swanky Hotel provides room service for its guests. The process for room service begins with a room service manager who takes orders by phone at an average of 5 minutes per order. The manager then sends the order to the kitchen, where it takes an average of 16 minutes to prepare the food for each order. There are four chefs in the kitchen. If the customer requires a beverage (alcoholic or nonalcoholic), the room service manager sends the order to the bar at the same time the order is sent to the kitchen. It takes 3 minutes to fill the order by one bartender, and 80 percent of the orders require a beverage. When the kitchen and bar orders are both ready, a waiter will take them to the room and bill the guest. There are six waiters to provide the service, and each order takes 20 minutes for the waiter to complete. Assume that on Friday evenings an average of 10 room-service orders per hour are placed. How many orders are in the system on average on Friday nights?arrow_forward
- A loan processing operation at a local bank processes an average of 7 loans per day. The operation has a design capacity of 10 loans per day and an effective capacity of 8 loans per day. What is the utilization of the processing operation? Select one: a. 100.0% b. 87.5% c. 70.0% d. 80.0% Warranty expense, the cost that a business incurs for the repair or replacement of goods that has sold, is an example of which of the following? Select one: a. Internal failure cost b. Appraisal cost c. Prevention cost d. External failure costarrow_forwardA two station nurses clinic operates where you must visit the first station before the second. The CV of a cycle time for this is .75. Average process time for the first nurses station is 15 minutes. Average process time for the second nurses station is 9 minutes. a. Find the standard deviation of the overall cycle time b. Assume the std dev of the first nurses station is to be twice that of the second. What would the new coefficient of variation be if the standard deviation of the second nurse station is reduced by 60%?arrow_forwardThe Swanky Hotel provides room service for its guests. The process for room service begins with a room service manager who takes orders by phone atan average of 2 minutes per order. The manager then sends the order to the kitchen, where it takes a cook an average of 16 minutes to prepare the food for eachorder. There are four cooks in the kitchen. If the customer orders a beverage, the room service manager sends the order to the bar at the same time the order issent to the kitchen. It takes 3 minutes for a bartender to fill the order, and 80 percent of the orders require a beverage. When the kitchen and bar orders are bothready, a waiter takes them to the room and bills the guest. There are six waiters to provide the service,and each order takes 20 minutes for the waiter to complete.a. What is the capacity of the process, and what is the bottleneck?b. What is the throughput time of a typical order?c. Assume that on Friday evenings an average of 10 room-service orders per hour are…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY