Chapter 12, Problem 4P
In problem 3, assume there are two machines of type A, two of type B, and two of type C.
- a. Prepare a finite capacity
schedule. - b. Compare the FCS to the Gantt chart in problem 3.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Problem 4
A bakery needs to evaluate two oven solutions for its renovations. It is currently considering two
possible ovens, a small one for $1,250 and a large one for $2,500. Its operating requirements are
as follows
Item
Small Oven Large Oven
50
Batch size (units)
Processing time (min/unit)
Cleaning time (min)
Heating time (min)
125
0.5
20
30
10
15
According to operating instructions, both the small and large ovens must be cleaned after each
batch and properly heated before each batch can be processed. The bakery estimates the demand
for the next few years to remain steady at 300,000 units per year. Currently, the company operates
8 hours a day (with no overtime allowed) and 300 days a year.
a. Calculate the daily production capacity of each oven (small and large).
b. How many of the small ovens are needed to meet the production demand? What is the total
cost?
c. How many of the large ovens are needed to meet the production demand? What is the total
cost?
d. Calculate the rate of…
The following table contains order-dependent setup times for four jobs. For safety reasons, jobC cannot follow job A, nor can job A follow job C. Determine the processing sequence that willminimize the total setup time. (Hint: There are 12 alternatives.)Following Job’sSetup Time (hrs.)SetupTime (hrs.) A B C DPrecedingjobA 2 — 5 × 4B 1 7 — 3 2C 3 x 2 — 2D 2 4 3 6 —
Bill’s Barbershop has two barbers available to cut customers’hair. Both barbers provide roughly the same experience andskill, but one is just a little bit slower than the other. The pro-cess flow in Figure 5.9 shows that all customers go throughsteps B1 and B2 and then can be served at either of the twobarbers at step B3. The process ends for all customers atstep B4. The numbers in parentheses indicate the minutes ittakes that activity to process a customer.
a. How long does it take the average customer to completethis process?b. What single activity is the bottleneck for the entireprocess?c. How many customers can this process serve in an hour?
Chapter 12 Solutions
OPERATIONS MANAGEMENT IN THE SUPPLY CHAIN: DECISIONS & CASES (Mcgraw-hill Series Operations and Decision Sciences)
Ch. 12 - What types of scheduling decisions are management...Ch. 12 - Specify the kinds of objectives that might be...Ch. 12 - Prob. 3DQCh. 12 - How is the scheduling of patients in a doctor's...Ch. 12 - Describe the differences between Gantt charting,...Ch. 12 - Why are m n ma chine-scheduling algorithms not...Ch. 12 - What is the purpose of a planning and control...Ch. 12 - Prob. 8DQCh. 12 - Prob. 9DQCh. 12 - What scheduling rule should be applied to...
Ch. 12 - Prob. 11DQCh. 12 - Students must complete two activities to register...Ch. 12 - Prob. 2PCh. 12 - Sequence the jobs shown below by using a Gantt...Ch. 12 - In problem 3, assume there are two machines of...Ch. 12 - In problem 2, assume there are two machines of...Ch. 12 - The Security Life Insurance Company processes all...Ch. 12 - At the University Hospital, five blood samples...Ch. 12 - Prob. 8PCh. 12 - Prob. 9PCh. 12 - Using the Gantt charts developed in the following...Ch. 12 - How would the theory of constraints be used to...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- . Shop order 7777 is for 600 of part 8900. From the routing file, it is found that operation 20 is done on work center 300. The setup time is 3.5 hours, and run time is 0.233hours per piece. What is the required capacity on work center 300 for shop order 7777?arrow_forwardNew students who join the university, should visit cer-tain departments in their first day, as part of the registration and induction process. Students are usually allocated to groups of ten,and their visits and their timings are as follows:DEPARTMENT DURATION FOR EACHGROUP (MINUTE)Registration/Finance 60IT 45Library 90Social Club 30Sport Centre 30Student Support Service 45Medical Centre 45Campus Services (banks, restaurant, etc.) 30During the visit, at least one person from the university student support team should be with each team of students. The stu-dent support team has allocated the visit of every two depart-ments to one person as follows: Deborah (Registration and IT), Gemma (Library and Social Club), Frank (Sport Centreand Student support service), and Raj (Medical centre and Campus services). The visits of the departments can be done inany sequence. Based on the current arrangements,a) What is the cycle timeb) What is the throughput per hourc) Total idle time in each…arrow_forward1. Aljon, a softdrink dealer, delivers 14 cases on Monday, 10 cases on Tuesday, 12 cases on Wednesday, 15 cases on Thursday, 19 cases on Friday, and 20 cases on Saturday. How many cases are delivered on the average each day?arrow_forward
- Determine the resources needed and cost for training of 200 sales agents for launching Project X, which has been decomposed in activities marketing training, ordering process training, and suitable training site. Training classes are eight hours long for activities A and B. The resources required for A and B include the following. One conference room for training, which can hold 10 trainees and one trainer. One marketing trainer and one ordering process trainer for a full day of training (i.e., four hours per day for each trainer). The cost for each trainer is $50 per hour. The cost of the training site is $100 per hour. Choose all the apply: 1. The marketing trainer is required for 20 session each four hours long. 2. The ordering process trainer is required for 20 session each four hours long. 3. The number of sessions required for activity A is 20 sessions. 4. The number of sessions required for ordering process training is 20 sessions. 5. The total cost for the…arrow_forwardThe assembly department started the month with 468,000 units in its beginning work in process inventory. An additional 1,524,000 units were transferred in from the prior department during the month to begin processing in the Assembly Department. There were 126,000 units in the ending work in process inventory of the Assembly Department. How many units were transferred to the next processing department during the month? a. 1,992,000 b. 1,992,000 c. 2,118,000 d. 1,866,000 e. 1,398,000 f. 1,182,000arrow_forwardWhat might be some of the problems in scheduling rated capacity too closely to the load?arrow_forward
- A process improvement team is working to improve the production output at the Johnson Manufacturing plant’sHeader Cell that manufactures a key component, headers, used in commercial air conditioners. A header is partof the circulatory system of a commercial air conditioner that moves coolant between various components suchas the evaporator coil and the condenser coil. Currently, the header production cell is scheduled separately fromthe main work in the plant. Often, individual headers are not sequenced to match the product they go into on thefinal assembly line in a timely fashion, and so the product can sit in queue waiting for a headerarrow_forwardExplain the relationship between priority versus capacity that must exist within the production planning and control area of an industry.arrow_forwardSupertronics, Inc., would like to know how the firm’s profit-ability is altered by product mix. Currently, product mix isdetermined by giving priority to the product with the highestper-unit contribution margin (defined as the difference be-tween price and material cost). Details on the Supertronicsproduct line, including processing time at each workstation,follow:a. Assume that Supertronics has 5,500 minutes of capacityavailable at each workstation each week. Develop a linearprogram to define the production mix that maximizescontribution margin.b. Solve your formulation using a computer package such asPOM for Windows. c. Given your solution for part (b), which machine is thebottleneck?d. How would your formulation and solution in part(b) change if 50 units of each product were alreadycommitted to customers and thereby had to beproduced?arrow_forward
- Super Fun Industries manufactures four top-selling toys code-named A-148, B-356, B-457, and C-843. The following table shows how long it takes to process each toy through each required station. Note that all times are in minutes. Super Fun's manufacturing plant is open 12 hours a day, 5 days a week, and 8 hours on Saturday. b. If weekly demand for the four products are A-148=180 units, B-356=310 units, B-457=280 units, and C-843=300 units, which station is the bottleneck, and is it capable of producing all the toys demanded? The bottleneck for Super Fun Industries is ▼ Station 1 Station 2 Station 3 Station 4 , with a utilization of ______%. (Enter your response rounded to one decimal place.)arrow_forwardAjax Manufacturing Inc. (Centralized System With Distributed Terminals) The following describes the conversion cycle processes for AJAX Manufacturing Inc., which employs a centralized computer system with distributed terminals in the departments. The current batch production process at AJAX is initiated from a marketing forecast of expected sales for the quarter. The production planning and control clerk uses this to create a digital production schedule of the various batches to be produced during the quarter. From this schedule, the system automatically produces digital work orders. The production department supervisor accesses the work orders from his terminal and prints the necessary hard-copy move tickets and materials requisitions. The move tickets and two copies of the purchase requisitions are distributed to each work center in the production process. Employees submit the material requisitions to storekeeping in exchange for materials and subassemblies. If additional raw…arrow_forwardA: Which station is the bottleneck? The bottleneck is _______, with a total load of _____ minutes for the next month. B: Using the traditional method, which bases decisions solely on a product's contribution to profits and overhead, what is the optimal product mix and what is the overall profitability? Next, order the products from highest contribution margin to the lowest. The obtained sequence is asfollows: C: Using the bottleneck-based method, what is the optimal product mix and what is the overall profitability?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY