a)

Summary Introduction

To draw: The precedence diagram.

b)

Summary Introduction

To calculate: The highest allowable cycle time.

c)

Summary Introduction

To calculate: The daily production rate.

d)

Summary Introduction

To calculate: The theoretical minimum number of workstations.

e)

Summary Introduction

To calculate: The efficiency.

f)

Summary Introduction

To calculate: The total idle time per cycle.

g)

Summary Introduction

To determine: The best workstation assignment to be made.

Blurred answer
Students have asked these similar questions
Dr. Lori Baker, operations manager at Nesa Electro-nics, prides herself on excellent assembly-line balancing. She has been told that the firm needs to complete 96 instruments per24-hour day. The assembly-line activities are:   TASK TIME (min) PREDECESSORSA 3 —B 6 —C 7 AD 5 A, BE 2 BF 4 CG 5 FH 7 D, EI 1 HJ 6 EK 4 G, I, J 50a) Draw the precedence diagram.b) If the daily (24-hour) production rate is 96 units, what is thehighest allowable cycle time?c) If the cycle time after allowances is given as 10 minutes, whatis the daily (24-hour) production rate?d) With a 10-minute cycle time, what is the theoretical minimumnumber of stations with which the line can be balanced?e) With a 10-minute cycle time and six workstations, what is theefficiency?f) What is the total idle time per cycle with a 10-minute cycletime and six workstations?g) What is the best workstation assignment you can makewithout exceeding a 10-minute cycle time, and what is itsefficiency?
A paced assembly line has been devised to manufacture calculators, as the following data show: Station Work ElementAssigned Work ElementTime (min) S1 S2 S3 S4 S5 S6 A D,E C B,F,G H,I,J K 2.7 0.6, 0.9 3.0 0.7, 0.7, 0.9 0.7, 0.3, 1.2 2.4 a. What is the maximum hourly output rate from this line? (Hint: The line can go only as fast as its slowest workstation.)b. What cycle time corresponds to this maximum output rate?c. If a worker is at each station and the line operates at this maximum output rate, how much idle time is lost during each 10-hour shift?d. What is the line’s efficiency?
A list of tasks has been compiled in an assembly operation. Task Precedence Task Time (mins) A 6. В C А В 7 D В E С, D 4 E i) Calculate the number of work stations required, balance the line and calculate the line efficiency if it is required that the assembly operation is completed within 10 minutes. If there is no constraint on the number of work stations balance the line ii) and calculate the line efficiency in order to maximize output. ii) Compare the number of assemblies that can be made in a four hour period according to sub-divisions (i) and (ii).

Chapter 9 Solutions

Mylab Operations Management With Pearson Etext -- Access Card -- For Operations Management: Sustainability And Supply Chain Management (13th Edition)

Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.