Production and Operations Analysis, Seventh Edition
7th Edition
ISBN: 9781478623069
Author: Steven Nahmias, Tava Lennon Olsen
Publisher: Waveland Press, Inc.
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 12.9, Problem 33P
Summary Introduction
Interpretation:
Sampling plan for Spire CDs is to be determined.
Concept Introduction:
Probability Distribution Function is a likelihood of an event to occur for discrete random variables. Graphically, it shows how likely variables will fall under the probability area.
Exponential distribution is a probabilitydistribution which finds probability of an event to occur between independent constant rate and continous rate.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
At Isogen Pharmaceuticals, the filling process for its asthma inhaler is set to dispense
170
milliliters (ml) of steroid solution per container. The average range for a sample of
4
containers is
5
ml. Use the accompanying table to establish control limits for sample means and ranges for the filling process.
Click the icon to view the table of factors for calculating three-sigma limits for the
x-chart
and R-chart.
The
UCLR
equalsz____________ml and the
LCLR
equals _________________ml. (Enter your responses rounded to two decimal places.)
For 50 consecutive days, a process engineer has measured the weight of acomponent after it has been coated with a special paint. Each day, she takes a sampleof 10 components. The average across all 500 components (50 days, 10 componentsper day) is 45.343018 grams. The standard deviation across all parts is 0.0076382 gram.When constructing an X-bar chart, what would be the center line and what would be thelines for the upper and lower control limits?
Need help on calculating control limits for x-bar and r-chart based on the samples below:
Sample No
X-BAR (Sample Mean)
R (Sample Range)
X-BAR
R
1
28.2151942
9.5450186
2
30.5767201
11.1032318
3
29.0253789
5.52221327
4
29.9431791
6.27087883
5
29.947177
12.7568255
6
29.6848334
11.4927456
7
29.2539019
4.72514932
8
29.6694257
13.9330532
9
30.1590205
6.33461804
10
28.6867307
6.49522527
11
30.5960109
8.13717125
12
29.4390565
5.80286433
13
31.863426
3.40227918
14
32.3716448
8.62217828
15
29.7052597
10.0026916
16
30.0060069
4.25003967
17
32.8491753
4.6515662
18
33.5023103
9.62764088
19
28.1876404
9.6980397
20
30.5043768
6.46724539
21
29.6856417
7.65071069
22
32.5728395
9.2483604
23
28.2363719
7.54975234
24
29.6579999
11.3224787
25
28.1319897
13.213391
26
28.8811004
8.08405181
27
31.6730765
12.9865678
28
28.2078142
5.96315947
29
27.9430689
7.39518992
30
29.6269815
9.48802129
31
34.3599108
7.66563648
32
28.2423234
7.34122645…
Chapter 12 Solutions
Production and Operations Analysis, Seventh Edition
Ch. 12.1 - Prob. 2PCh. 12.1 - Prob. 3PCh. 12.1 - Prob. 4PCh. 12.1 - Prob. 5PCh. 12.1 - Prob. 6PCh. 12.2 - Prob. 7PCh. 12.2 - Prob. 8PCh. 12.2 - Prob. 9PCh. 12.2 - Prob. 10PCh. 12.2 - Prob. 11P
Ch. 12.2 - Prob. 12PCh. 12.2 - Prob. 13PCh. 12.3 - Prob. 14PCh. 12.3 - Prob. 15PCh. 12.3 - Prob. 16PCh. 12.3 - Prob. 17PCh. 12.4 - Prob. 18PCh. 12.4 - Prob. 19PCh. 12.4 - Prob. 20PCh. 12.4 - Prob. 21PCh. 12.5 - Prob. 22PCh. 12.6 - Prob. 23PCh. 12.6 - Prob. 24PCh. 12.6 - Prob. 25PCh. 12.6 - Prob. 26PCh. 12.6 - Prob. 27PCh. 12.6 - Prob. 28PCh. 12.9 - Prob. 29PCh. 12.9 - Prob. 30PCh. 12.9 - Prob. 31PCh. 12.9 - Prob. 32PCh. 12.9 - Prob. 33PCh. 12.10 - Prob. 34PCh. 12.10 - Prob. 35PCh. 12.10 - Prob. 37PCh. 12.10 - Prob. 38PCh. 12.10 - Prob. 39PCh. 12.10 - Prob. 40PCh. 12.11 - Prob. 41PCh. 12.11 - Prob. 42PCh. 12.11 - Prob. 43PCh. 12.11 - Prob. 44PCh. 12.12 - Prob. 46PCh. 12.12 - Prob. 47PCh. 12.12 - Prob. 48PCh. 12 - Prob. 49APCh. 12 - Prob. 50APCh. 12 - Prob. 51APCh. 12 - Prob. 52APCh. 12 - Prob. 53APCh. 12 - Prob. 54APCh. 12 - Prob. 55APCh. 12 - Prob. 57APCh. 12 - Prob. 58APCh. 12 - Prob. 59APCh. 12 - Prob. 60APCh. 12 - Prob. 61APCh. 12 - Prob. 62APCh. 12 - Prob. 63APCh. 12 - Prob. 64APCh. 12 - Prob. 65APCh. 12 - Prob. 66APCh. 12 - Prob. 67APCh. 12 - Prob. 68APCh. 12 - Prob. 69APCh. 12 - Prob. 70AP
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A component part for a motorcycle is manufactured by an investment casting process. The air vent opening on this casting is an important functional parameter of the part. The results for five samples are given in the table. The values given have been coded using the last two digits of the dimension Sample Air vent opening diameter (in mm 1 58 61 54 60 2 61 55 58 62 3 66 60 59 55 4 53 57 58 64 5 65 63 79 61 Determine the central line and control limits for the range and mean charts, and discuss whether or not the process is in statistical control.arrow_forwardA control chart for fraction nonconforming is to be established using a center line of p=0.03. What sample size is required if we wish to detect a shift in the process fraction nonconforming to 0.08 with probability 0.50? 1269 475 73 316 216 2 105 150 265arrow_forwardArana is a company that produces homemade Rotini pasta. They use statistical process control to monitor the manufacturing process. The company collects five samples, each containing six packs of pasta. Below is the sample data, but the standard deviation of the process output is unknown. If an R chart is created using three-sigma limits (i.e., z = 3) to monitor the variability of products, what would be the upper control limit for this R chart? Sample 1 Sample 2 Sample 3 Pack 1 452.3 451.6 448.6 Sample 4 454.7 Sample 5 448.9 7.614 9.328 11.653 13.427 Pack 2 452.8 451.2 455.6 451.7 453.4 Pack 3 456 454.6 456.5 451 456.7 Pack 4 457.2 455.3 451.9 452.6 456.3 Pack 5 457.8 452.2 455.6 454.7 452.4 Pack 6 451.8 451.9 448.3 458.4 456arrow_forward
- When a robot welder is functioning properly the cylinders it produces burst (on average) at 3400 psi, with known standard deviation 100 psi. Determine the 3-Sigma mean control chart limits. Test lot sample sizes are n=4 cylinders randomly selected from the production line. a. Centerline = ____ b. Upper Limit = ____ c. Lower Limit = ____ d. What is the probability that random variation will exceed the ± 3-sigma limits ____. (four decimal places with zero before the decimal)arrow_forwardWe want to determine the AOQ for an acceptance samplingplan when the quality of the incoming lots in percent defectiveis 1.5%, and then again when the incoming percent defective is 5%.T he sample size is 80 units for a lot size of 550 units. Furthermore,Pa at 1.5% defective levels is 0.95. At 5% incoming defective levels,the Pa is found to be 0.5. Determine the average outgoing qualityfor both incoming percent defective levels.arrow_forwardLinda Boardman, Inc., an equipment manufacturer in Boston, has submitted a sample cutoff valve to improve your manufacturing process. Your process engineering department has conducted experiments and found that the valve has a mean (u) of 12.00 and a standard deviation (a) of 0.04. Your desired performance is μ = 12.00 +3 standard deviations, where a = 0.045. For the given information, the process capability index (Cpk) - (round your response to three decimal places).arrow_forward
- If the objective function exposure quality of 90 changes by 65 ETV will not be 0. Should the 90 be 25 or 155arrow_forwardSuppose you constructed control charts for the time spent by customers in a retail checkout lane, computing UCL, CL, and LCL based upon a large number of historical observations. Using those control limits, you decide to plot the most recent 12 data points as shown below. Given the following range chart, which general conclusion is most appropriate? (link to image here). Range Chart Sample Range 140 120 100 80 60 40 20 0 1 2 3 4 5 6 7 Sample Number 8 The process is capable The process is not capable The process is in control The process is out of control 9 10 11 12arrow_forward63. X control charts are used to maintain control of the manufacture of the cases used to house a generic brand of personal computer. Separate charts are maintained for length, width, and height. The length chart has UCL = 20.5 inches, LCL = 19.5 inches, and a target value of 20 inches. This chart is based on using subgroups of size 4 and three- sigma limits. However, the customer's specifications require that the target length should be 19.75 inches with a tolerance of ±0.75 inch. What percentage of the cases shipped will fall outside the customer's specifications?arrow_forward
- Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) for this problem. Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Mean (in.) Range (in.) Sample Sample Sample Mean (in.) Range (in.) 1 9.404 0.044 7 9.403 0.021 2 9.402 0.051 8 9.405 0.058 3 9.393 0.042 9.395 0.039 4 9.404 0.037 10 9.401 0.038 9.399 0.048 11 9.401 0.054 9.397 0.053 12 9.404 0.061 For the given data, the x = inches (round your response to four decimal places). Based on the sampling done, the control limits for 3-sigma x chart are: Upper Control Limit (UCL;) = inches (round your response to four decimal places). Lower Control Limit (LCL;) = inches (round your response to four decimal places).arrow_forwardAt Isogen Pharmaceuticals, the filling process for its asthma inhaler is set to dispense 140 milliliters (ml) of steroid solution per container. The average range for a sample of 3 containers is 4 ml. use the accompanying table to establish control limits for sample means and ranges for the filling process. x-chart and R-chart Size of Sample (n) Factor for UCL and LCL for x-chart (A2) Factor for LCL for R-Chart (D3) Factor for UCL for R-Chart (D4) 2 1.880 0 3.267 3 1.023 0 2.575 4 0.729 0 2.282 5 0.577 0 2.115 6 0.483 0 2.004 7 0.419 0.076 1.924 8 0.373 0.136 1.864 9 0.337 0.184 1.816 10 0.308 0.223 1.777 The UCLR equals to what ml and the LCLR equals to what ml. (Enter your responses rounded to two decimal places.) The UCLx equals to what ml and the LCLx is what ml. (Enter your responses rounded to two decimal places.)arrow_forwardManagement at Deluxe Diner is in process of establishing a quality control system for the time it takes to initially make contact with a table of patrons. A sample of size 3 is taken on each of the five different days. The following data table presents the results (all times listed are in seconds). Time 1 Time 2 Time 3 Service Encounter day 1 day 2 day 3 day 4 day 5 200 120 83 68 110 150 85 93 150 90 175 105 130 145 75arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.