Consider the master flight
Interpretation: The similarities between the master flight schedule of an airlines to the master production schedule for a manufacturer.
Concept Introduction: Master flight schedule of any airlines shows the timings of each of the flight. Similarly the master production schedule of a manufacturing organization shows the time when the manufacture of each product starts. Both have some similarities.
Answer to Problem 2DQ
There are many similarities between the master flight schedule and the master production schedule of an airlines and a manufacturer respectively.
Explanation of Solution
Given information: Activities consisting lead times to aircraft’s readiness and related to the time of departure.
- The master flight schedule shows the time for the flight to a certain destination. This is similar to a master production schedule showing the taking up the production of a certain part/job.
- The flight schedule shows the time to the destination i.e. the length of this flight (run) and the time allowed. Similarly the master production schedule shows the no. of parts to be manufactured and the time to be taken (for this run).
- Before the flight, many tasks are to be completed viz. loading fuel, meals and other consumables; boarding passengers etc. Similarly before the manufacturing equipment starts the production run, there are tasks like setting the machine and loading the components etc.
- There can be delays/interruptions in these tasks for both-the flight and the production run.
- The flight will end after completing the run. Similarly the production run will stop after completing the scheduled quantity.
- The plane moves on for the next scheduled flight. The manufacturing equipment also moves on the run of the next scheduled product.
Want to see more full solutions like this?
Chapter 11 Solutions
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Additional Business Textbook Solutions
Operations Management: Sustainability and Supply Chain Management (12th Edition)
Principles Of Operations Management
Business in Action
Operations and Supply Chain Management 9th edition
Operations Management
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
- Prepare a master schedule given this information: It is now the end of week 1; customer orders are 25 for week 2, 16 for week 3, 11 for week 4, 8 for week 5, and 3 for week 6. Use the MPS rule of ordering production when projected on-hand inventory would be negative without production. Suppose that there were 64 pumps in inventory at the beginning of week 1. A production lot size of 70 pumps is used. (Leave no cells blank - be certain to enter "0" wherever required.)arrow_forwardWho and why does the master schedule need to be interfaced with?arrow_forwardWhat is the difference between thread scheduling and process scheduling?arrow_forward
- Why is it important to integrate cost and schedule controls? Give an example for which separate cost and schedule control systems may not function properly.arrow_forwardWhich approach to scheduling works best when time is shared?arrow_forwardDescribe what is a concept by the name batch scheduling ?arrow_forward
- What advantages does the level strategy have over the chase strategy Discuss the different priority rules of short-term scheduling.arrow_forwardAssume that you are the manager of Assembly, Inc. You have just received an order for 26 units of an industrial robot, which is to be delivered at the start of week 7 of your schedule. Using the following information, determine how many units of subassembly G to order and the timing of those orders, given that subassembly G must be ordered in multiples of 80 units and all other components are ordered lot-for-lot. Assume that the components are used only for this particular robot. Item Lead Time (weeks) On Hand Components Robot 2 10 B, G, C(3) B 1 5 E, F C 1 20 G(2), H E 2 4 — F 3 8 — G 2 15 — H 1 10 — Subassembly G order quantity (in units) Subassembly G should start at beginning of Weekarrow_forwardAssume that you are the manager of Assembly, Inc. You have just received an order for 25 units of an industrial robot, which is to be delivered at the start of week 7 of your schedule. Using the following information, determine how many units of subassembly G to order and the timing of those orders, given that subassembly G must be ordered in multiples of 80 units and all other components are ordered lot-for-lot. Assume that the components are used only for this particular robot. Item Lead Time (weeks) On Hand Components Robot 2 10 B, G, C(3) B 1 5 E, F C 1 20 G(2), H E 2 4 — F 3 8 — G 2 15 — H 1 10 — Subassembly G order quantity (in units) Subassembly G should start at beginning of Week (Click to select) 1 2 3 4arrow_forward
- Describe the master scheduling process and explain its importance.arrow_forwardSunny Park Tailors has been asked to make three differenttypes of wedding suits for separate customers. The followingtable highlights the time taken in hours for (1) cutting and sewingand (2) delivery of each of the suits. Which schedule finishes sooner:first come, first served (123) or a schedule using Johnson's rule?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.