Interpretation: Number of Kanban card sets needs to be determined based on the given information.
Concept Introduction: A Kanban is important tool used in JIT system, it is a card that has all the relevant information such as order number, delivery time, delivered quantity, production quantity and so on, to make production operations efficient and waste free.
(b)
Interpretation: Maximum authorized inventory needs to be determined based on the given information.
Concept Introduction: A Kanban is important tool used in JIT system, it is a card that has all the relevant information such as order number, delivery time, delivered quantity, production quantity and so on, to make production operations efficient and waste free.
(c)
Interpretation: Pros and Cons of high value of alpha such as 1 needs to discussed
Concept Introduction: A Kanban is important tool used in JIT system, it is a card that has all the relevant information such as order number, delivery time, delivered quantity, production quantity and so on, to make production operations efficient and waste free.
Want to see the full answer?
Check out a sample textbook solution- Flores Manufacturing, Inc., is moving to kanbans to support its electronic-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost Annual holding cost subassembly Daily production Annual usage Lead time Safety stock $23 $200 per subassembly 550 subassemblies 50,000 (= 50 weeks x 5 days each x daily usage of 200 subassemblies) 3 days 1 day's production of subassemblies The kanban size is (round your response to the nearest whole number). The number of kanbans is (round your response to the nearest whole number).arrow_forwardCarol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip: Setup labor cost Annual holding cost $30 per hour $13 per unit 960 units/8 hour day 36,000 (250 days each x daily demand of 144 units) Daily production Annual demand Desired lot size 120 units (one hour of production) To obtain the desired lot size, the set-up time that should be achieved = ☐ minutes (round your response to two decimal places).arrow_forwardTooltron Manufacturing uses a Kanban system for a component. Daily demand is 410 units. Each container has a combined waiting and processing time of 1.6 days. If the container size is 30 and the alpha value (a) is 17 percent, how many Kanban card sets should be authorized? Round your answer up to the whole number. Kanban cards What is the maximum authorized inventory? Use the rounded value from the previous question. Round your answer to the nearest whole number. unitsarrow_forward
- Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip: Setup labor cost Annual holding cost Daily production Annual demand $30 per hour $12 per unit 976 units/8 hour day 46,200 (275 days each × daily demand of 168 units) Desired lot size 122 units (one hour of production) To obtain the desired lot size, the set-up time that should be achieved = minutes (round your response to two decimal places).arrow_forwardPauline Found Manufacturing, Inc., is moving to kanbans to support its telephone switching-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost Annual holding cost Daily production Annual usage Lead time Safety stock $30 $100 per subassembly 30 subassemblies 3,000 (50 weeks x5 days each daily usage of 12 subassemblies) 16 days 3 days' production Kanban container size = 24 units (round your response to the nearest whole number).arrow_forwardPauline Found Manufacturing, Inc., is moving to kanbans to support its telephone switching-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost Annual holding cost Daily production Annual usage Lead time Safety stock $30 $110 per subassembly 40 subassemblies 4,000 (50 weeks × 5 days each daily usage of 16 subassemblies) 12 days 3 days' production Kanban container size = ☐ units (round your response to the nearest whole number).arrow_forward
- IE Carol Cagle has a repetitive manufacturing plant producing trailer hitchos in Arlington, Texas. The plant has an average inventory tumover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes. He has developed the following data for one component, the safety chain clip $25 per hour $13 per unit Setup labor cost Annual holding cost Daily production Annual demand Desired lot size 992 units/8 hour day 33.000 (275 days each daily demand of 120 units) 124 units (one hour of production) To obtain the desired lot size, the set-up time that should be achievedminutes pound your response to two decimal places)arrow_forwardPauline Found Manufacturing, Inc., is moving to kanbans to support its telephone switching-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost Annual holding cost Daily production Annual usage Lead time Safety stock Kanban container size = $30 $125 per subassembly 40 subassemblies 4,500 (50 weeks × 5 days each × daily usage of 18 subassemblies) 14 days 2 days' production units (round your response to the nearest whole number).arrow_forwardIn setting up a Kanban control system you need to determine the number of Kanban card sets needed. If the expected demand during lead time is 50 per hour, the safety stock is 10% of the demand during lead time, the container size is 15. If the lead time to replenish an order is 8 hours, what number of Kanban card sets is needed? Numeric Response 30arrow_forward
- Pauline Found Manufacturing, Inc., is moving to kanbans to support its telephone switching-board assembly lines. Determine the size of the kanban for subassemblies and the number of kanbans needed. Setup cost Annual holding cost Daily production Annual usage Lead time Safety stock $30 $125 per subassembly 20 subassemblies 3,000 (50 weeks x5 days each x daily usage of 12 subassemblies) 12 days 3 days' production Kanban container size = units (round your response to the nearest whole number).arrow_forwardTej Dhakar's company wants to establish kanbans to feed a newly established work cell. The following data have been provided. Note: This is a level production system. Daily demand 275 units Production lead time 0.50 day Safety stock 0.25 day Kanban size 50 units How many kanbans are needed? enter your response here kanbans (round your response to the nearest whole number).arrow_forwardThe demand for milk at a coffee shop is 60 quarts per day. Lead time to replenish inventory is 2 days and the coffee shops want to have ½ of safety stock. If the container size of milk is 10 quarts, what is the Kanban number?arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.