A hydroelectric plant has a reservoir of area 2 sq. kilometers and a capacity 5 million cubic meters. The net head of water at the turbine is 50 m. If the efficiency of the generator is 95% and the total energy generated is 315.36*10° MW Calculate: 1- The turbine efficiency 2- If a load of 15MW has been supplied for 2 days, what will be the new head of water?
A hydroelectric plant has a reservoir of area 2 sq. kilometers and a capacity 5 million cubic meters. The net head of water at the turbine is 50 m. If the efficiency of the generator is 95% and the total energy generated is 315.36*10° MW Calculate: 1- The turbine efficiency 2- If a load of 15MW has been supplied for 2 days, what will be the new head of water?
Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.31P: Consider two interconnected voltage sources connected by a line of impedance Z=jX, as shown in...
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 4 steps with 4 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning