A generating plant has a maximum capacity of 100 kW and costs Rs 2,000,000.The annual fixed charges are 12% consisting of 6% interest, 4% depreciation and 2% taxes. Find the fixed charges per kWh if the load factor is (i) 100% and (ii) 60%.
A generating plant has a maximum capacity of 100 kW and costs Rs 2,000,000.The annual fixed charges are 12% consisting of 6% interest, 4% depreciation and 2% taxes. Find the fixed charges per kWh if the load factor is (i) 100% and (ii) 60%.
Electricity for Refrigeration, Heating, and Air Conditioning (MindTap Course List)
10th Edition
ISBN:9781337399128
Author:Russell E. Smith
Publisher:Russell E. Smith
Chapter7: Alternating Current, Power Distribution, And Voltage Systems
Section: Chapter Questions
Problem 8RQ
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps with 2 images
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Recommended textbooks for you
Electricity for Refrigeration, Heating, and Air C…
Mechanical Engineering
ISBN:
9781337399128
Author:
Russell E. Smith
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Electricity for Refrigeration, Heating, and Air C…
Mechanical Engineering
ISBN:
9781337399128
Author:
Russell E. Smith
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning