Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
12th Edition
ISBN: 9780134741062
Author: Lee J. Krajewski, Manoj K. Malhotra, Larry P. Ritzman
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 8, Problem 2P
A
Summary Introduction
Interpretation:Using linear regression, a relation to forecast Y which is the quality parameter from the current procedure is to be calculated.
Concept Introduction:Linear regression refers to determination of approach signifying the relationship between scalar response, (and dependent variable) and one or more explanatory variables(or independent variables).
B
Summary Introduction
Interpretation:Whether the relationship between Y and X is strong or not should be explained.
Concept Introduction:The level of relationship refers to the extent or the way by which the current and proposed are related.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Chart and Regression analysis :
What does the intercept predict?
X: C16 (number of cars on the sales lot) versus Y: C17 (cars sold per day)
Equation: y=2.9x + 14.5
Slope:2.9
Intercept:14.5
Does the intercept mean the intercept is 14.5 means that the cars sold per day( Y) predicted number of cars on sale lot(X) to be 14.5, but this intercept has no meaning. So, I will not use to predict cars sold per day?
In a car manufacturing company, an automated painting process has been introduced, and the quality assurance team suspects there might be issues that require investigation. The team decides to conduct a root cause analysis to identify potential problems. Through the root cause analysis and further investigation, it appears that the drying time of the paint in minutes is affecting the overall quality of the finish. The aspect they need to examine is the variation in drying time across different colours of paint.
Considering the ongoing concerns in the painting process, the team chooses to collect a sample of six drying time measurements every 20 minutes from various colours of paint. The recorded drying time values for a day's production are presented in Table 1. A total of 10 sets of measurements, each consisting of six drying time values in minutes, have been collected. Each time a set of measurements is taken, the individual drying time values are recorded.
Table 1: Drying Time…
ces
Inter-State Moving and Storage Company wishes to establish a control chart to monitor the proportion of residential moves
that result in written complaints due to late delivery, lost items, or damaged items. A sample of 50 moves is selected for each
of the last 12 months. The number of written complaints in each sample is 8, 7, 4, 8, 2, 7, 11, 6, 7, 6, 8, and 12.
Click here for the Excel Data File
a. Insert the mean proportion defective, UCL, and LCL (Leave no cells blank - be certain to enter "0" wherever required.
Round your intermediate calculations and final answers to 2 decimal places.)
Mean proportion defective
UCL
LCL
c. Does it appear that the number of complaints is out of control for any of the months?
Yes
ONO
Chapter 8 Solutions
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Ch. 8 - Figure 8.9 shows summer air visibility...Ch. 8 - Kay and Michael Passe publish What‘s...Ch. 8 - Demand for oil changes at Garcia’s Garage has...Ch. 8 - Prob. 2PCh. 8 - Ohio Swiss Milk Products manufactures and...Ch. 8 - A manufacturing firm has developed a skills test,...Ch. 8 - The materials handling manager of a manufacturing...Ch. 8 - Marianne Kramer, the owner of Handy Man Rentals,...Ch. 8 - Sales for the past 12 months at Computer Success...Ch. 8 - Bradley’s Copiers sells and repairs photocopy...
Ch. 8 - Consider the sales data for Computer Success given...Ch. 8 - A convenience store recently started to carry a...Ch. 8 - Community Federal Bank in Dothan, Alabama,...Ch. 8 - The number of heart surgeries performed at...Ch. 8 - The following data are for calculator sales in...Ch. 8 - Prob. 14PCh. 8 - Forrest and Dan make boxes of chocolates for which...Ch. 8 - The manager of Alaina’s Garden Center must make...Ch. 8 - The manager of a utility company in the Texas...Ch. 8 - Franklin Tooling, Inc., manufactures specialty...Ch. 8 - Create an Excel spreadsheet on your own that can...Ch. 8 - Prob. 20PCh. 8 - Using the data in Problem 20 and the Time-Series...Ch. 8 - Prob. 22PCh. 8 - Cannister, Inc., specializes in the manufacture of...Ch. 8 - The Midwest Computer Company serves a large number...Ch. 8 - A certain food item at P=0.20 (with a combination...Ch. 8 - Prob. 26PCh. 8 - Prob. 27PCh. 8 - A manufacturing firm seeks to develop a better...Ch. 8 - How much does the forecasting process at Deckers...Ch. 8 - Prob. 2VCCh. 8 - What factors make forecasting at Deckers...Ch. 8 - Prob. 4VCCh. 8 - Prob. 5VCCh. 8 - Comment on the forecasting system being used by...Ch. 8 - Develop your own forecast for bow rakes for each...
Knowledge Booster
Similar questions
- ASQ (The American Society for Quality) Defines a Six Sigma project as: Six Sigma is a method for reducing variation in manufacturing, service, or other business processes. Six Sigma projects measure the cost benefit of improving processes that are producing substandard products or services. Whether in manufacturing or service industries, such projects quantify the effect of process changes on delays or rework. The goal of each successful Six Sigma project is to produce statistically significant improvements in the target process; over time, multiple Six Sigma projects produce virtually defect-free performance. The Six Sigma Black Belt project is one that uses appropriate tools within a Six Sigma approach to produce breakthrough performance and real financial benefit to an operating business or company. The tools are generic. It is the structure of the project and the associated process (improvement model) that distinguish a Black Belt project from other similar quality improvement…arrow_forwardAt a hydrocarbon processing factory, process control involves the periodic analysis of samples for a certain process quality parameter. The analytic procedure currently used is costly and time-consuming. A faster and more economical alternative procedure has been proposed. However, the numbers for the quality parameter given by the alternative procedureare somewhat different from those given by the current procedure, not because of any inherent errors but because of changes in the nature of the chemical analysis. Management believes that if the numbers from the new procedure can be used to forecast reliably the corresponding numbers from the current procedure, switching to the new procedure would be reasonable and cost-effective. The following data were obtained for the quality parameter by analyzing samples using both procedures: a. Use linear regression to find a relation to forecast Y, which is the quality parameter from the current procedure, using the values from the proposed…arrow_forwardWhy is the analyzer used in industrial applications. What would happen if it is not used. Is there a replacement for it?arrow_forward
- Which methods to use depends on the type of variable(s) being analyzed.arrow_forwardAt a hydrocarbon processing factory, process control involves periodic analysis of samples for a certain process quality parameter. The analytic procedure currently used is costly and time consuming. A faster and more economical alternative procedure has been proposed. However, the numbers for the quality parameter given by the alternative procedure are somewhat different from those given by the current procedure, not because of any inherent errors but because of changes in the nature of the chemical analysis. Management believes that if the numbers from the new procedure can be used to forecast reliably the corresponding numbers from the current procedure, switching to the new procedure would be reasonable and cost effective. The following data were obtained for the quality parameter by analyzing samples using both procedures: Current (Y) 2.8 Current (Y) ITTT Proposed (X) 3.2 Proposed (X) 3.1 3.1 3.7 38 2.6 3.0 2.8 3.5 4.0 3.3 3.6 3.6 3.4 4.0 3.6 3.7 2.1 2.6 2.7 3.6 3.2 3.2 3.3 3.5…arrow_forwardAt a hydrocarbon processing factory, process control involves periodic analysis of samples for a certain process quality parameter. The analytic procedure currently used is costly and time consuming. A faster and more economical alternative procedure has been proposed. However, the numbers for the quality parameter given by the alternative procedure are somewhat different from those given by the current procedure, not because of any inherent errors but because of changes in the nature of the chemical analysis. Management believes that if the numbers from the new procedure can be used to forecast reliably the corresponding numbers from the current procedure, switching to the new procedure would be reasonable and cost effective. The following data were obtained for the quality parameter by analyzing samples using both procedures: Current (Y) 2.9 3.0 3.3 3.6 4.0 2.7 3.1 Proposed (X) 3.0 3.8 3.5 4.0 3.7 3.6 3.7 Current (Y) 3.1 2.9 3.3 2.9 2.1 3.2 2.8 The increases in X mostly result in how…arrow_forward
- At a hydrocarbon processing factory, process control involves periodic analysis of samples for a certain process quality parameter. The analytic procedure currently used is costly and time consuming. A faster and more economical alternative procedure has been proposed. However, the numbers for the quality parameter given by the alternative procedure are somewhat different from those given by the current procedure, not because of any inherent errors but because of changes in the nature of the chemical analysis. Management believes that if the numbers from the new procedure can be used to forecast reliably the corresponding numbers from the current procedure, switching to the new procedure would be reasonable and cost effective. The following data were obtained for the quality parameter by analyzing samples using both procedures: TTTT Current (Y) Proposed (X) 3.2 Current (Y) Proposed (X) 3.1 2.8 3.1 3.7 3.8 2.6 3.0 2.8 3.6 3.5 3.3 3.6 4.0 3.4 4.0 3.6 3.7 2.1 2.6 2.7 3.6 3.2 3.2 3.3 3.5…arrow_forwardAt a hydrocarbon processing factory, process control involves periodic analysis of samples for a certain process quality parameter. The analytic procedure currently used is costly and time consuming. A faster and more economical alternative procedure has been proposed. However, the numbers for the quality parameter given by the alternative procedure are somewhat different from those given by the current procedure, not because of any inherent errors but because of changes in the nature of the chemical analysis. Management believes that if the numbers from the new procedure can be used to forecast reliably the corresponding numbers from the current procedure, switching to the new procedure would be reasonable and cost effective. The following data were obtained for the quality parameter by analyzing samples using both procedures: TTTT Current (Y) Proposed (X) 3.2 Current (Y) 3.1 Proposed (X) 3.1 2.8 3.7 3.8 2.6 3.0 2.8 3.6 3.5 4.0 3.7 3.3 3.6 3.4 4.0 3.6 2.1 2.6 2.7 3.6 3.2 3.2 3.3 3.5…arrow_forwardEstimating a cost function, high-low method. Lacy Dallas is examining customer-service costs in the southern region of Camilla Products. Camilla Products has more than 200 separate electrical products that are sold with a 6-month guarantee of full repair or replacement with a new product. When a product is returned by a customer, a service report is prepared. This service report includes details of the problem and the time and cost of resolving the problem. Weekly data for the most recent 8-week period are as follows: Plot the relationship between customer-service costs and number of service reports. Is the relationship economically plausible? Use the high-low method to compute the cost function relating customer-service costs to the number of service reports. What variables, in addition to number of service reports, might be cost drivers of weekly customer-service costs of Camilla Products?arrow_forward
- In response to intensive foreign competition, the management of Florex Company has attempted over the past year to improve the quality of its products. A statistical process control system has been installed and other steps have been taken to decrease the amount of warranty and other field costs, which have been trending upward over the past several years. Costs relating to quality and quality control over the last two years are given below: Costs (in thousands) Last Year This Year Inspection $ 720 $ 909 Quality engineering $ 450 $ 765 Depreciation of test equipment $ 675 $ 270 Rework labor $ 1,080 $ 1,530 Statistical process control $ 0 $ 225 Cost of field servicing $ 1,350 $ 1,260 Supplies used in testing $ 45 $ 81 Systems development $ 720 $ 900 Warranty repairs $ 3,780 $ 1,620 Net cost of scrap $ 630 $ 1,170 Product testing $ 900 $ 1,800 Product recalls $ 3,150 $ 900 Disposal of defective products $ 810 $ 1,080 Sales have been flat over the…arrow_forwardAbernathy, Inc., produces two different generators and is concerned about their quality. The company has identified the following quality activities and costs associated with the two products: Generator A Generator B Units produced 170,000 340,000 Warranty work (units) 1,700 850 Scrapped units (number) 3,400 850 Inspection (hours) 3,400 1,700 Quality training (hours) 85 85 Activities: Performing warranty work $816,000 Scrapping units 612,000 Inspecting 306,000 Quality training 85,000 Required: 1. Calculate the quality cost per unit for each product, and break this unit cost into quality cost categories. If required, round your answers to the nearest cent. Generator A Generator B Unit cost $fill in the blank 1 $fill in the blank 2arrow_forwardScenario 3: Kohl’s Department Store has experienced steady growth in every department over the past decade. Sales and market share continue to grow but Kohl’s wants to know the level of customer satisfaction among its existing target market. In addition, the company would like to know how to continue to expand sales over the upcoming decade and would like to know how they could better serve customers within their stores and online. Using any form of a Likert scale, create a questionnaire with a minimum of 10 questions that Kohl’s current customers could answer:arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.