Chapter 6, Problem 6.58BE
1.
To determine
To prepare: The absorption costing income statement for the following:
a. The first year of operations
b. The second year of operations
2.
To determine
The operating income using variable costing for the first year and the second year without preparing the variable costing income statement
3.
To determine
To prepare: The variable costing income statement for the following years:
a. The first year of operations
b. The second year of operations
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
PIUK Learning Ma
Happy Valley Land and Snow Company provides the following ABC costing information:
Activities
Total Costs
Activity-cost drivers
Labor hours
$320,000
8,000 hours
Gas
$36,000
6,000 gallons
Invoices
$40,000
2,500 invoices
Total costs
$396,000
The above activities used by their three departments are:
Lawn Department Bush Department Plowing Department
Labor hours
2,500 hours
1,200 hours
4,300 hours
Gas
1,500 gallons
800 gallons
3,700 gallons
Invoices
1,600 invoices
400 invoices
500 invoices
How much of the labor cost will be assigned to the Lawn Department?
Select one:
a. $100,000
b. s25,600
c. S40,000
Northern Defense manufactures radar systems. It has just completed the manufacture of its first newly designed system, RS-32. Manufacturing data for the RS-32 follow:
(Click icon to view data)
Requirement
Calculate the total variable costs of producing 2, 4, and 8 units.
Begin by calculating the cumulative total time in labor-hours using the cumulative average-time learning model. (Round the cumulative average time per unit to the nearest whole number.)
Cumulative number of Cumulative average time
Cumulative total time:
per unit: Labor-hours
Labor-hours
3700
units
2
4
8
3700
←
Data table
Direct material cost
Direct manufacturing labor time for first unit
Learning curve for manufacturing labor time per radar system
Direct manufacturing labor cost
Variable manufacturing overhead cost
Using the formula for an 85% learning curve, b =
In 0.85
In 2
Print
=
$
$
$
-0.162519
0.693147
81,000 per unit of RS-32
3,700 direct manufacturing labor-hours
85% cumulative average timeª
Done
28 per direct…
The actual and planned data for Broadwater Institute & Technical School for the Fall term were as follows:
Enrollment
Tuition per credit hour
Credit hours
cost.
Line Item Description
Revenue
Variable costs:
Registration, records, and marketing costs per enrolled student
Instructional costs per credit hour
Depreciation on classrooms and equipment
$1,875,000
Registration, records, and marketing costs vary by the number of enrolled students, while instructional costs vary by the number of credit hours. Depreciation is a fixed
Registration, records, and marketing costs $
Instructional costs
Total variable costs
Amount
Contribution margin
Depreciation on classrooms and equipment
Operating income
Actual
Prepare a variable costing income statement showing the contribution margin and operating income for the Fall term.
Broadwater Institute & Technical School
Variable Costing Income Statement
For the Fall Term
5,000
$115
$
$
80,000
$300
$45
Planned
4,500
$100
72,000
$300
$40
$1,875,000
Chapter 6 Solutions
Managerial Accounting (5th Edition)
Ch. 6 - (Learning Objective 1) A graph of a variable cost...Ch. 6 - (Learning Objective 2) Which of the following is...Ch. 6 - (Learning Objective 2) In the cost equation...Ch. 6 - Prob. 4QCCh. 6 - Prob. 5QCCh. 6 - (Learning Objective 3) Which of the following is...Ch. 6 - Prob. 7QCCh. 6 - (Learning Objective 5) Which of the following is...Ch. 6 - Prob. 9QCCh. 6 - Prob. 10QC
Ch. 6 - Identify cost behavior (Learning Objectives 1 2)...Ch. 6 - Prob. 6.2SECh. 6 - Compute fixed costs per unit (Learning Objective...Ch. 6 - Prob. 6.4SECh. 6 - Predict and graph total mixed costs (Learning...Ch. 6 - Prob. 6.6SECh. 6 - Prepare and analyze a scatterplot (Learning...Ch. 6 - Prob. 6.8SECh. 6 - Use the high-low method (Learning Objective 4)...Ch. 6 - Prob. 6.10SECh. 6 - Prob. 6.11SECh. 6 - Prob. 6.12SECh. 6 - Write a cost equation given regression output...Ch. 6 - Prepare a contribution margin income statement...Ch. 6 - Prepare income statements using variable costing...Ch. 6 - Prepare income statements using variable costing...Ch. 6 - Identify cost behavior graph (Learning Objectives...Ch. 6 - Prob. 6.18SECh. 6 - Prob. 6.19SECh. 6 - Prob. 6.20AECh. 6 - Prepare income statement in two formats (Learning...Ch. 6 - Prob. 6.22AECh. 6 - Prob. 6.23AECh. 6 - Sustainability and cost estimation (Learning...Ch. 6 - Create a scatterplot (Learning Objective 3) Melody...Ch. 6 - Continuation of E6-25A: High-low method (Learning...Ch. 6 - Continuation of E6-25A: Regression analysis...Ch. 6 - Regression analysis using Excel output (Learning...Ch. 6 - Prob. 6.29AECh. 6 - Using the high-low method to predict overhead for...Ch. 6 - Using regression analysis output to predict...Ch. 6 - Performing a regression analysis to predict...Ch. 6 - Prob. 6.33AECh. 6 - Prob. 6.34AECh. 6 - Compare absorption and variable costing (Learning...Ch. 6 - Prepare a contribution margin income statement...Ch. 6 - Prepare a contribution margin income statement...Ch. 6 - Prepare income statements using variable costing...Ch. 6 - Prepare a variable costing income statement given...Ch. 6 - Prob. 6.40AECh. 6 - Prob. 6.41BECh. 6 - Prepare income statement in two formats (Learning...Ch. 6 - Use unit cost data to forecast total costs...Ch. 6 - Prob. 6.44BECh. 6 - Sustainability and cost estimation (Learning...Ch. 6 - Create a scatter plot (Learning Objective 3) Tammy...Ch. 6 - Continuation of E6-46B: High-low method (Learning...Ch. 6 - Prob. 6.48BECh. 6 - Prob. 6.49BECh. 6 - Prob. 6.50BECh. 6 - Using the high-low method to predict overhead for...Ch. 6 - Using regression analysis output to predict...Ch. 6 - Prob. 6.53BECh. 6 - Prob. 6.54BECh. 6 - Prob. 6.55BECh. 6 - Prob. 6.56BECh. 6 - Prob. 6.57BECh. 6 - Prob. 6.58BECh. 6 - Prob. 6.59BECh. 6 - Prepare a variable costing income statement given...Ch. 6 - Prob. 6.61BECh. 6 - Analyze cost behavior at a hospital using various...Ch. 6 - Analyze cost behavior (Learning Objectives 1, 2,...Ch. 6 - Prob. 6.64APCh. 6 - Prob. 6.65APCh. 6 - Prob. 6.66APCh. 6 - Analyze cost behavior at a hospital using various...Ch. 6 - Analyze cost behavior (Learning Objectives 1, 2,...Ch. 6 - Prepare traditional and contribution margin income...Ch. 6 - Prob. 6.70BPCh. 6 - Prob. 6.71BPCh. 6 - Prob. 6.72SCCh. 6 - Cost Behavior in Real Companies Choose a company...Ch. 6 - Ethics of building inventory (Learning Objective...Ch. 6 - Prob. 6.76ACT
Knowledge Booster
Similar questions
- Creating and Using a Cost Formula Big Thumbs Company manufactures portable flash drives for computers. Big Thumbs incurs monthly depreciation costs of $15,500 on its plant equipment. Also, each drive requires materials and manufacturing overhead resources. On average, the company uses 9,800 ounces of materials to manufacture 4,900 flash drives per month. Each ounce of material costs $3.00. In addition, manufacturing overhead resources are driven by machine hours. On average, the company incurs $24,500 of variable manufacturing overhead resources to produce 4,900 flash drives per month. In your calculations, round variable rate per flash drive to the nearest cent. If required, round final answers to the nearest cent. Required: 1. Create a formula for the monthly cost of flash drives for Big Thumbs. Total cost of flash drives = + ( x Number of flash drives) Total cost of flash drives = $fill in the blank 3 + ($fill in the blank 4 x Number of flash drives) 2. If the department…arrow_forwardCreating and Using a Cost Formula Big Thumbs Company manufactures portable flash drives for computers. Big Thumbs incurs monthly depreciation costs of $14,400 on its plant equipment. Also, each drive requires materials and manufacturing overhead resources. On average, the company uses 18,500 ounces of materials to manufacture 7,400 flash drives per month. Each ounce of material costs $3.00. In addition, manufacturing overhead resources are driven by machine hours. On average, the company incurs $29,600 of variable manufacturing overhead resources to produce 7,400 flash drives per month. In your calculations, round variable rate per flash drive to the nearest cent. If required, round final answers to the nearest cent. Required: 1. Create a formula for the monthly cost of flash drives for Big Thumbs. Total cost of flash drives = Fixed cost v + ( Variable rate x Number of flash drives) Total cost of flash drives = $ 14,400 v + ($ 10.50 v x Number of flash drives) 2. If the department…arrow_forwardSolomon Bike Company makes the frames used to build its bicycles. During Year 2, Solomon made 20,000 frames; the costs incurred follow. Unit-level materials costs (20,000 units x $55) Unit-level labor costs (20,000 units x $56) Unit-level overhead costs (20,000 x $9) Depreciation on manufacturing equipment Bike frame production supervisor's salary Inventory holding costs Allocated portion of facility-level costs Total costs Solomon has an opportunity to purchase frames for $112 each. Additional Information $ 1,100,000 1,120,000 180,000 96,000 79,000 240,000 520,000 $ 3,335,000 1. The manufacturing equipment, which originally cost $520,000, has a book value of $470,000, a remaining useful life of four and a zero salvage value. If the equipment is not used to produce bicycle frames, it can be leased for $71,000 per year. years, 2. Solomon has the opportunity to purchase for $910,000 new manufacturing equipment that will have an expected useful life of four years and a salvage value of…arrow_forward
- The cutting department of Legacy Production Company started 40,000 units of specialized chairs during the month of March. The department incurred $15,000 in direct material costs; 2,500 direct labor hours paid at $10 per hour; and manufacturing overhead applied at 150% of direct labor cost. Legacy Production Company uses process costing to accumulate costs. NOTE: There was no beginning inventory in March. Required (Excel Template downloadProvided): (Module Learning Outcomes LO5.1 through LO5.5 AND Course Learning Outcome #1 & #2) Calculate the conversion costs incurred during the month of March (show your calculations). Assume, that only 30,000 units were completed and transferred out. The remaining units left in ending inventroy are only 70% complete with respect to conversion costs. Direct materials are added at the beginning of the process. Prepare a Cutting Department cost production report for the month of March Refer to the cost production report in part b. What are…arrow_forwardRequired information Use the following information for the Problems below. (Algo) Skip to question [The following information applies to the questions displayed below.]Tent Master produces Pup tents and Pop-up tents. The company budgets $360,000 of overhead cost and 60,000 direct labor hours. Additional information follows. Per Unit Selling Price Direct Materials Direct Labor Pup tent $ 85 $ 20 $ 47 Pop-up tent 80 27 31 Problem 17-3A (Algo) Using activity-based costing to allocate overhead cost, and compute overhead cost per unit and gross profit per unit LO P3 Activity Budgeted Cost Activity Cost Driver Budgeted Activity Usage Assembly $ 240,000 Direct labor hours (DLH) 60,000 Electricity 42,000 Machine hours (MH) 10,000 Materials purchasing 78,000 Purchase orders (PO) 500 Total $ 360,000 Required:1. Compute an activity rate for each activity using activity-based costing.2. The following actual activity usage produced 10,000 Pup tents and…arrow_forwardYour company has received an order for 20 units of aproduct. Th e labor cost to produce the item is $9.50 per hour. Th esetup cost for the item is $60 and material costs are $25 per unit. Th e item is sold for $92. Th e learning rate is 80 percent. Overheadis assessed at a rate of 55 percent of unit labor cost.(a) Determine the average unit cost for the 20 units if the fi rstunit takes four hours.(b) Determine the minimum number of units that need to bemade before the selling price meets or exceeds the averageunit cost.arrow_forward
- Byron Truck Repair uses a specialized hydraulic lift to work on trucks and busses. Data on the lift and its usage follow: Resources used Operation Maintenance Resources supplied Operation Maintenance Sales revenue from truck repair totaled $32,000. Required A Required B Required: a. Prepare a traditional income statement. b. Prepare an activity-based income statement. Prepare a traditional income statement. Truck repair sales Operation costs Maintenance costs Cost Driver Rate $6.00 per lift-hour $4.50 per job Complete this question by entering your answers in the tabs below. $ 18,000 $ 2,700 Traditional Income Statement Required A Required B b. Prepare an activity-based income statement. Truck repair sales Costs Prepare an activity-based income statement. Volume related - Operation Batch related Maintenance Total costs Truck repair operating profits Complete this question by entering your answers in the tabs below. Activity-Based Income Statement Resources Used $ 0 Unused Resource…arrow_forwardappear below: Instructor wages Classroom supplies Utilities Campus rent Insurance Administrative expenses Fixed Cost Cost per Cost per per Month Course $ 2,930 Student $ 270 $ 80 $ 1,220 $ 5,100 $ 2,400 $ 3,600 $ 40 $ 3 For example, administrative expenses should be $3,600 per month plus $40 per course plus $3 per student. The company's sales should average $890 per student. The company planned to run four courses with a total of 64 students; however, it actually ran four courses with a total of only 62 students. The actual operating results for September appear below: Revenue Instructor wages Classroom supplies Utilities Campus rent Insurance Administrative expenses Required: Actual $ 54,060 $ 11,000 $1,950, $ 17,130 $ 5,100 $ 2,540 $ 3,378 1. Prepare the company's planning budget for September. 2. Prepare the company's flexible budget for September. 3. Calculate the revenue and spending variances for September.arrow_forwardCorazon Manufacturing Company has a purchasing department staffed by five purchasing agents. Each agent is paid 28,000 per year and is able to process 4,000 purchase orders. Last year, 17,800 purchase orders were processed by the five agents. Required: 1. Calculate the activity rate per purchase order. 2. Calculate, in terms of purchase orders, the: a. total activity availability b. unused capacity 3. Calculate the dollar cost of: a. total activity availability b. unused capacity 4. Express total activity availability in terms of activity capacity used and unused capacity. 5. What if one of the purchasing agents agreed to work half time for 14,000? How many purchase orders could be processed by four and a half purchasing agents? What would unused capacity be in purchase orders?arrow_forward
- Jean and Tom Perritz own and manage Happy Home Helpers. Inc. (HHH), a house-cleaning service. Each cleaning (cleaning one house one time) takes a team of three house cleaners about 1.5 hours. On average, HHH completes about 15,000 cleanings per year. The following total costs are associated with the total cleanings: Next year, HHH expects to purchase 25,600 of direct materials. Projected beginning and ending inventories for direct materials are as follows: There is no work-in-process inventory and no finished goods inventory; in other words, a cleaning is started and completed on the same day. Required: 1. Prepare a statement of cost of services sold in good form. 2. How does this cost of services sold statement differ from the cost of goods sold statement for a manufacturing firm?arrow_forwardJean and Tom Perritz own and manage Happy Home Helpers, Inc. (HHH), a house-cleaning service. Each cleaning (cleaning one house one time) takes a team of three house cleaners about 1.5 hours. On average, HHH completes about 15,000 cleanings per year. The following total costs are associated with the total cleanings: Next year, HHH expects to purchase 25,600 of direct materials. Projected beginning and ending inventories for direct materials are as follows: There is no work-in-process inventory; in other words, a cleaning is started and completed on the same day. Required: 1. Prepare a statement of services produced in good form. 2. What if HHH planned to purchase 30,000 of direct materials? Assume there would be no change in beginning and ending inventories of materials. Explain which line items on the statement of services produced would be affected and how (increase or decrease).arrow_forwardBordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On average, the first unit of a new design takes 600 hours. Direct labor is paid 25 per hour. Required: 1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total production of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, cumulative total time in hours, and the time for the last unit. Show results by row for each of units one through eight. (Round answers to two significant digits.)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning