Textbook Question
Chapter 5, Problem 15P
The arrival rate at a parking lot is 6 veh/min. Vehicles Start arriving at 6:00 P.M., and when the queue reaches 36 vehicles, service begins. If company policy is that total vehicle delay should be equal to 500 veh/min, what is the departure rate? (Assume D/D/1 queuing and a constant service rate.)
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
3-The arrival rate at a parking lot is 6 veh/min. Vehicles start arriving at 6:00 P.M., and when the
queue reaches 36 vehicles, service begins. If company policy is that total vehicle delay should be
equal to 500 veh min, what is the departure rate? (Assume D/D/1 queuing and a constant service rate.)
The arrival rate at a parking lot is 6 veh/min. Vehicles start arriving at 6:00 P.M., and when the queue reaches 36 vehicles, service begins. The company policy states that the total vehicle delay should be equal to 500 veh-min. Assuming D/D/1 queuing and a constant service rate, determine the maximum queue length.
The arrival rate at a parking lot is 6 veh/min. Vehicles start arriving at 6:00 P.M., and when the queue reaches 36 vehicles, service begins. The company policy states that the total vehicle delay should be equal to 500 veh-min. Assuming D/D/1 queuing and a constant service rate, what is the departure rate?
Chapter 5 Solutions
Principles of Highway Engineering and Traffic Analysi (NEW!!)
Ch. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - Prob. 3PCh. 5 - Prob. 4PCh. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prob. 9PCh. 5 - Prob. 10P
Ch. 5 - Prob. 11PCh. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - The arrival rate at a parking lot is 6 veh/min....Ch. 5 - Prob. 16PCh. 5 - At the end of a sporting event, vehicles begin...Ch. 5 - Prob. 18PCh. 5 - Prob. 19PCh. 5 - Vehicles begin arriving at a single toll-road...Ch. 5 - Vehicles begin to arrive at a toll booth at 8:50...Ch. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Vehicles begin to arrive at a parking lot at 6:00...Ch. 5 - At a parking lot, vehicles arrive according to a...Ch. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - Prob. 32PCh. 5 - Prob. 33PCh. 5 - Vehicles arrive at a recreational park booth at a...Ch. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - A truck weighing station has a single scale. The...Ch. 5 - Prob. 39PCh. 5 - Prob. 40PCh. 5 - Vehicles leave an airport parking facility (arrive...Ch. 5 - Vehicles begin to arrive at a parking lot at 7:45...Ch. 5 - Prob. 43PCh. 5 - Prob. 44PCh. 5 - Prob. 45PCh. 5 - Prob. 46PCh. 5 - Prob. 47PCh. 5 - Prob. 48PCh. 5 - Prob. 49PCh. 5 - Prob. 50PCh. 5 - Prob. 51PCh. 5 - Prob. 52PCh. 5 - A theme park has a single entrance gate where...Ch. 5 - Prob. 54PCh. 5 - Prob. 55P
Additional Engineering Textbook Solutions
Find more solutions based on key concepts
1.2 Explain the difference between geodetic and plane
surveys,
Elementary Surveying (14th Edition)
What production method for steel shapes is specified by the following organizations? AISI (American Iron and St...
Structural Steel Design (6th Edition)
5.11 What error results on a 200-ft sight with a level if the rod reading is 6.307 ft but the top of the
7-ft r...
Elementary Surveying: An Introduction To Geomatics (15th Edition)
11-1. Determine the moments at A,B, and C, then draw
the moment diagram for the beam. The moment of ine...
Structural Analysis (10th Edition)
State three examples of a static load application and three examples of a dynamic load application.
Materials for Civil and Construction Engineers (4th Edition)
A 3 ft square footing carries a sustained load of 10 k. It is placed on the surface of a 30 ft thick saturated ...
Foundation Design: Principles and Practices (3rd Edition)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- The arrival rate at a parking lot is 6 veh/min. Vehicles start arriving at 6:00 P.M., and when the queue reaches 36 vehicles, service begins. The company policy states that the total vehicle delay should be equal to 500 veh-min. Assuming D/D/1 queuing and a constant service rate, at what time did the queue clear?arrow_forwardThere is a single gate at an entrance to a recreational park where arriving vehicles must stop to pay their tickets. The park opens at 8:00AM, at which time vehicles begin to arrive at a rate of 480 veh/hr. After 20 minutes the arrival flow rate declines to 120 veh/hr, and it continues at that level for the remainder of the day. If the service time is 15 seconds per vehicle, and assuming D/D/1 queuing, determine the Longest Vehicle Queue. Note: Round off your answers to the nearest whole number. Only include the numeric value of your answer without the unit (i.e. 22).arrow_forwardThere is a single gate at an entrance to a recreational park where arriving vehicles must stop to pay their tickets. The park opens at 8:00AM, at which time vehicles begin to arrive at a rate of 480 veh/hr. After 20 minutes the arrival flow rate declines to 120 veh/hr, and it continues at that level for the remainder of the day. If the service time is 15 seconds per vehicle, and assuming D/D/1 queuing, determine the Length of Queue at 8:1OAM. Note: Round off your answers to the nearest whole number. Only include the numeric value of your answer without the unit (i.e. 22).arrow_forward
- There is a single gate at an entrance to a recreational park where arriving vehicles must stop to pay their tickets. The park opens at 8:00AM, at which time vehicles begin to arrive at a rate of 480 veh/hr. After 20 minutes the arrival flow rate declines to 120 veh/hr, and it continues at that level for the remainder of the day. If the service time is 15 seconds per vehicle, and assuming D/D/1 queuing, determine the time that the queue will dissipate. Answer must be in this format: *:**AM, minute time must be rounded off to the nearest whole number (i.e. 8:50AM)arrow_forwardThe arrival rate at a parking lot is 6 veh/min. Vehicles start arriving at 6:00 P.M., and when the queue reaches 36 vehicles, service begins. The company policy states that the total vehicle delay should be equal to 500 veh-min. Assuming D/D/1 queuing and a constant service rate, determine the average delay of any vehicle.arrow_forwardVehicles arrive at a single toll booth beginning at 7:00 A.M. at a rate of 8 veh/min. Service also starts at 7:00 A.M. at a rate of u(t)=6+0.2t where (f) is in vehicles per minute and it is in minutes after 7:00 A.M. Assuming D/D/1 queuing, determine when the queue will clear, the total delay, and the maximum queue length in vehicles.arrow_forward
- Vehicles begin to arrive to a parking lot at 7:00 AM at a rate of 2000 veh/hour, but the demand reduces to 1000 veh/hour at 7:30 AM and continues at that rate. The ticketing booth to enter the parking lot can only serve the vehicles at 1000 veh/hour until 7:15 AM, after which the service rate increases to 2000 veh/hour. Assuming D/D/1 queuing, draw a queuing diagram for this situation. Find: a) the time at which the queue clears, b) the total delay, c) the longest queue length, and d) wait time of the 500th and 2000th vehicles to arrive to the parking lot (assuming FIFO conditions)?arrow_forwardQUESTION 1 3 booths, each of which can handle one vehicle every 6 second. a. If D/D/1 model is used, what is total service rate of the system? (you can express this in total vehicles that can be handled in 10 minutes) 6. Draw the queuing diagram (cumulative traffic volumes vs. time) with traffic upstream arriving volume and this service rate. C. Using the queuing diagram, determine the max queue, the longest delay to an individual vehicle and total delay (veh-min). Time Period 10-min Volume 7:00-7:10 200 स 7:10-7:20 400 7:20-7:30 500 7:30-7:40 250 7:40-7:50 200 7:50-8:00 150arrow_forwardVehicles arrive at a single toll booth beginning at8:00 A.M. They arrive and depart according to a uniformdeterministic distribution. However, the toll booth doesnot open until 8:10 A.M. The average arrival rate is 8veh/min and the average departure rate is 10 veh/min.Assuming D/D/1 queuing, when does the initial queueclear and what are the total delay, the average delay pervehicle, longest queue length (in vehicles), and the waittime of the 100th vehicle to arrive (assuming first-infirst-out)?arrow_forward
- A ramp meter operates during the morning peak period. Ramp meter cycles vary with time as shown in the table. The metering scheme allows one vehicle to pass the signal. The table below gives the number of vehicles demanding service on the ramp during the particular time intervals, the cumulative demand for the ramp for the morning peak, the ram meter cycle for each interval. Using a queuing diagram, determine the maximum queue, the maximum delay to any vehicle, and the total delay in the system. draw a figure.arrow_forward9- Vehicles arrive at a recreational park booth at a uniform deterministic rate of 4veh/min. If uniform deterministic processing of vehicles (collecting of fees) begins 30 minutes after the first arrival and the total delay is 3600 veh-min, how long after the arrival of the first vehicle will it take for the queue to be cleared?arrow_forwardVehicles arrive at a single toll booth beginning at 8:00 AM. They arrive and depart according to a uniform deterministic distribution. However, the toll booth does not open until 8:10 AM. The average arrival rate is 8 veh/min and the average departure rate is 10 veh/min. Assuming D/D/1 queuing, when does the initial queue clear and what are the total delay, the average delay per vehicle, longest queue length (in vehicles), and the wait time of the 100th vehicle to arrive (arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
What Is A Construction Takeoff? | Are They Still Necessary In Quantity Surveying?; Author: Metroun Quantity Surveying;https://www.youtube.com/watch?v=uTWoDPtcOjg;License: Standard Youtube License