a)
Summary Introduction
To decide: What actions to be taken immediately, in case 1,000 finished lamps are required in week 5 and 1,500 finished lamps are required in week 6, given the “parts explosion”, the inventory on hand of finished lamps and parts and lead times as shown below.
b)
Summary Introduction
To calculate the total assembly time required, given that it takes 15 minutes to assemble the parts into the frame and 5 minutes to assemble the shade and frame into a finished lamp.
c)
Summary Introduction
To find out the changes in the material plan, if the lead time of assembly of lamps is extended from one week to two weeks.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Table B shows a partially completed MPS record for ball
Develop the MPS for ball
Four customer orders arrived in the following sequences (Table B).
Table A
Order
Quantity
Week desired
1
500
4
2
400
5
3
300
1
4
300
7
Assume that you must commit to the orders in the sequence of arrival and cannot change the desired shipping dates or your MPS. Which orders should you accept?
Table B
Item: Ball bearings
Quantity on hand: 400
Order policy: 500 units Lead time: 1 week
Week
1
2
3
4
5
6
7
8
9
10
Forecast
550
300
400
450
300
350
200
300
450
400
Customer order
booked
300
350
250
250
200
150
100
100
100
100
Projected on-hand
inventory
MPS
quantity
500
MPS start
Available to promise
(ATP)
Product Z is made from three units of A, two of B, and
four of C. A, in turn, is made of one unit of C and five of
D. A customer order was received for 200 units of Z in
Week 8. (Hint: You will need to use "low-level coding",
i.e., pull each item to the lowest level it appears on
the BOM.) Item Lot Size On Hand Lead Time Z LFL 30 3
A LFL 40 1 B LFL 100 4 C 1000 50 3 D 500 2000 3 a.
Show the Bill of Materials b. Develop MRP schedules
showing gross/net requirements and planned order
releases/receipts for each item.
What is the lead time (in weeks) to respond to a customer order for product A, based on the BOM shown in Figure,assuming no existing inventories or scheduled receipts?
Chapter 15 Solutions
OPERATIONS MANAGEMENT IN THE SUPPLY CHAIN: DECISIONS & CASES (Mcgraw-hill Series Operations and Decision Sciences)
Ch. 15.7 - Prob. 1OLCh. 15 - Prob. 1DQCh. 15 - Prob. 2DQCh. 15 - With regard to inventory management, discuss the...Ch. 15 - Prob. 4DQCh. 15 - How much safety stock should be carried in a MRP...Ch. 15 - Prob. 6DQCh. 15 - Prob. 7DQCh. 15 - Prob. 8DQCh. 15 - Prob. 9DQ
Ch. 15 - Describe how MRP? concepts could be used for the...Ch. 15 - How are MRP and ERP related?Ch. 15 - The following information is given for a...Ch. 15 - eXcel The Old Hickory Furniture Company...Ch. 15 - Product A consists of subassemblies B and C....Ch. 15 - eXcel The BOM for product A given below Part on...Ch. 15 - The master scheduler in the ABC Widget Company is...Ch. 15 - A firm makes a basic scissors consisting of three...Ch. 15 - Prob. 7PCh. 15 - Prob. 8PCh. 15 - A small toy robot is assembled from sis parts: a...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Each A (finished good) requires 1 of component B and 2 of component C. Each B requires 2 of part D and 1 of part E; and each C requires 1 of part D and 1 of part F. If the demand for product A is 30 units, and there are 10 units of B on hand and none of C, how many units of part D will be needed?arrow_forwardHeather Adams, production manager for a Colorado exercise equipment manufacturer, needs to schedule an order for 50 UltimaSteppers, which are to be shipped in week 8. Subscripts indicate quantity required for each parent. Assume lot-for-lot ordering. b. Choose correct time phased-structures c. Develop a net material requirements plan for F (enter your responses as whole numbers).arrow_forwardProduct PI is made of one unit of sub assembly A and four units of sub assembly B. Sub assembly A is made of 4 units of component X while sub assembly B is made of 2 units of X. one unit of Y and 3 units of Z. The manufacturing lead times PI, A, B, X, Y and Z are 1, 1, 1, 4, 6 and 1 (week) respectively. The lead time for delivery of PI in weeks isarrow_forward
- Product M is made of two units of N and two of P. N is made of two units of R and four units of S. R is made of one unit of S and three units of T. P is made of two units of T and four units of U. a. Show the bill-of-materials (product structure tree). b. If 100 Ms are required, how many units of each component are needed? c. Show both a single-level parts list and an indented parts list.arrow_forwardThe three tables above show the master production schedule and the bill of materials of part A, and the inventory records of all the parts. There are no scheduled receipts. Given this information, what is the net requirement of part A in Week 4?arrow_forwardShown below is a partially completed MPS record for hand drills. a. Develop the MPS record for the hand drills. (Enter your responses as integers. A response of "0" is equivalent to being not applicable.) Item: Hand drills Quantity on Hand: 30 Forecast Customer orders (booked) Projected on-hand inventory MPS quantity MPS start 1 15 20 N 40 25 3 15 15 Week Available-to- promise (ATP) inventory b. A distributor of the hand drills places an order for 15 units. What is the appropriate shipping date for the entire order? The order should ship on week (Enter your response as an integer.) 4 20 20 Order Policy: 60 units Lead Time: 1 week 5 55 0 6 35 0arrow_forward
- Which of the following is the planned-order release using an MRP program if the gross requirement is 5,000, inventory on hand is 1,200, and planned receipts are 800?arrow_forwardNote:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. 14.) A part structure, lead time (weeks), and on-hand quantities for product A are shown in Figure 14. From the information shown, generate: a) An indented bell of material for product A. b) Net requirements for each part to produce 10 As in week 8 using lot-for-lot. Figure 14:arrow_forwardFigure below shows a partially completed MPS record for ball bearings.a. Develop the MPS for ball bearings.b. Four customer orders arrived in the following sequence:Order Quantity Week Desired1 500 42 400 53 300 14 300 7Assume that you must commit to the orders in the sequence of arrival and cannot change the desired shipping dates or your MPS. Which orders should you accept?arrow_forward
- Product A is made from components B, C, and D. Item B is asubassembly that requires two units of C and one unit of E.Item D also is an intermediate item, made from two unitsof F. All other usage quantities are two. Draw the BOM forproduct A.arrow_forwardYour boss at Xiangling Hu Products, Inc., has just provided you with the schedule and lead times for the bracket. The unit is to be prepared in week 10. The lead times for the components a re bracket (I week), base (1 week), spring ( I week), clamp (I week), housing (2 weeks), handle (I week), casting (3 weeks), bearing (I week), and shaft (1 week).a) Prepare the time-phased product structure for the bracket.b) In what week do you need to start the castings?arrow_forwardDohini Manufacturing company had following 12 months of data on purchasing cost and number of purchase orders. Required: 1. Determine the high point and low point. 2. Calculate the variable rate for purchasing cost based on the number of purchase orders. (Round to nearest cent) 3. Calculate the fixed monthly cost of purchasing.(Round to nearest dollar). 4. Write the cost formula for the purchasing activity showing the fixed cost and the variable rate. 5. If Dohini manufacturing company estimates that next month will have 430 purchase orders, what is the total estimated purchasing cost for the that month?(Round to nearest dollar) 6. What if Dohini manufacturing wants to estimate purchasing cost for the coming year and expects 5340 purchase orders? What will estimated total purchasing cost be? What is the total fixed purchasing cost? Why doesn't equal the fixed cost calculated in Requirement 3?(Round to nearest dollar)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY