To identify: The impact of Takt time on the employee requirement.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
. If the takt time increases, the operation requires:a. more workers.b. fewer workers.
If the demand rate increases, the takt time:a. increases.b. decreases.
While setting the cycle time as the maximum possible will result in more output rate
a. TRUE
O b. FALSE
Chapter 8 Solutions
Operations Management
Ch. 8 - Prob. 1CQCh. 8 - Prob. 2CQCh. 8 - Prob. 3CQCh. 8 - Prob. 4CQCh. 8 - Prob. 5CQCh. 8 - Prob. 6CQCh. 8 - Prob. 7CQCh. 8 - Prob. 8CQCh. 8 - What are the two pillars of the Toyota Production...Ch. 8 - Prob. 10CQ
Ch. 8 - Prob. 11CQCh. 8 - Prob. 12CQCh. 8 - Prob. 13CQCh. 8 - Prob. 14CQCh. 8 - Prob. 15CQCh. 8 - Prob. 16CQCh. 8 - Prob. 17CQCh. 8 - Prob. 18CQCh. 8 - Prob. 19CQCh. 8 - A company makes two models, A and B. Which of the...Ch. 8 - Prob. 21CQCh. 8 - Prob. 22CQCh. 8 - Prob. 23CQCh. 8 - Prob. 24CQCh. 8 - Prob. 25CQCh. 8 - Prob. 26CQCh. 8 - Prob. 1PACh. 8 - Prob. 2PACh. 8 - Prob. 3PACh. 8 - Prob. 4PACh. 8 - Prob. 5PACh. 8 - Prob. 6PACh. 8 - Prob. 7PACh. 8 - Prob. 8PACh. 8 - Prob. 9PACh. 8 - Prob. 10PA
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- While setting the cycle time as the maximum possible will result in more output rate O a. FALSE O b. TRUE S PAGEarrow_forward(a) T. Smunt Manufacturing Corp. has the process displayed below. The drilling operation occurs separately from and simultaneously with the sawing and sanding operations. The product only needs to go through one of the three assembly operations (the assembly operations are "parallel"). ASSEMBLY SAWING SANDING 78 min/unit 15 min/unit 15 min/unit WELDING ASSEMBLY DRILLING 25 min/unit 78 min/unit 27 min/unit ASSEMBLY 78 min/unit 1. Which operation is the bottleneck? 2. What is the throughput time for the overall system? 3. If the firm operates 8 hours per day, 22 days per month, what is the monthly capacity of the manufacturing process? 4. Suppose that a second drilling machine is added, and it takes the same time as the original frilling machine. What is the new bottleneck time of the system? 5. Suppose that a second drilling machine is added, and it takes the same time as the original drilling machine. What is the new throughput time?arrow_forwardA large-scale bakery is laying out a new production process for its packaged bread, which it sells to several grocery chains. It takes 11 minutes to bake the bread. Instruction: Do not round your intermediate calculations and round final answer to nearest integer. How large of an oven is required so that the company is able to produce 4000 units of bread per hour (measured in the number of units that can be baked simultaneously)? unitsarrow_forward
- Suppose a resource has setup times and a setup time must be incurred each time theresource switches production to a different product. Requiring the resource to make anew product (that requires its own setup) is likely to have what effect on the process?a. Inventory for existing products remains the same, but the process must now carryinventory of the new product.b. Inventory of all products is likely to increase.c. Inventory of existing products decreases even though the process must now carryinventory of the new product.d. Inventory of products with short setup times will decrease, while inventory of products with long setup times will increase.arrow_forwardThe ClickClock corporation produces clocks with six stations. Each station is manned by a human worker, who do the following tasks: These workers get paid $ 10 an hour. Ignore any Station Task Sequence Processing Time (secs) Task Heat-stake lens to bezel Inspect bezel Clean switch holes Install set switch in bezel Total time for A Check switch travel Clean inside bezel Install module in bezel Total time for B Install battery clip in module Heat-stake battery clip in module Install two batteries in module Check switch 14 2 26 A 3 10 Preparation 1 4 18 68 23 B 6 12 Preparation 2 7 25 60 8 20 9 20 Battery 10 22 Installation 11 8. Total time for C 70 Install band Inspect band Total time for D Cosmetic inspection Final test D 12 45 Band 13 13 Installation 58 E 14 4 Packaging 15 71 Preparation Total time for E 75 Place watch and cuff in display box Place cover in display box base 16 20 17 14 Watch 18 Place owner's manual and box into tub 30 packaging Total time for F 64arrow_forwardTravelers are the flow unit in a process with two resources. The capacities of the resources are 1.3 and 0.88 travelers per second. Demand occurs at the rate 1.3 travelers per second. Instruction: Round your answer to one decimal place. What is the utilization (%) of the first resource? %arrow_forward
- The slowest point in a process is a ________. Group of answer choices Bottleneck Lost production Surplus Throughputarrow_forwardWhile setting the cycle time as the minimum possible will resultin more outputrate O a. FALSE O b. TRUEarrow_forwardCalculate the total number of machine-hours needed to produce enough units to meet the sales demand for the two products. Total number of machine hours Marwick Innovations, Inc. produces exercise and fitness gear. Two of its newer products require a finishing process that can only be completed on machines that were recently purchased for this purpose. The machines have a maximum capacity of 10,500 machine hours, and no other products that the company makes use these machines.Sarah Jacob, the company’s operations manager, is preparing the production schedule for the coming month and can’t seem to find enough machine time to produce enough units to meet the customer demand that the marketing department has included in the sales budget.Michael Stoner, the company’s controller, has gathered the following information about the two products: DumbbellRack WeightBench Selling price per unit $50 $60 Direct materials 20 12 Direct labor…arrow_forward
- Drivers are trained in a process with two resources. A worker in the first resource trains 0.028 drivers per hour and a worker in the second resource trains 0.014 drivers per hour. The first resource has 4 workers and the second resource has 7 workers. Demand occurs at the rate 0.09 drivers per hour. Instruction: Round your answer to one decimal place. What is the implied utilization (%) of the second resource? %arrow_forwardThe production process shown below consists of five stages. The numbers in parentheses are the times in minutes to complete one unit before it moves on to the next stage. The demand rate is 46 units per hour. 2 workers workers workers Stage A (4 workers Stage B (3) a. How many workers are needed at each stage if management wants a utilization of at least 90 percent? Round your answers down to the nearest whole number. Stage A: workers Stage B: Stage C: Stage D: Stage E: Stage C (6) Stage D (5 Stage E (4arrow_forwardIt is possible to increase process capacity by balancing a process. True or false?a. Trueb. Falsearrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.