The guidance system of a ship is controlled by a computer that has three major modules. In order for the compute to function properly, all three modules must function. Two of the modules have reliabilities of .97, and the other has a reliability of .99.
a. What is the reliability of the computer?
b. A backup computer identical to the one being used will be installed to improved overall reliability. Assuming the new computer automatically function if the main one fail, determine the reliability.
c. If the backup computer must be activated by a switch in the event that the first computer fails, and the switch has a reliability of .98, what is the overall reliability of the system? (Both the switch and the backup computer must function in order for the backup to take over.)
Want to see the full answer?
Check out a sample textbook solutionChapter 4 Solutions
Operations Management
- 7. Assume that there is a 9% rate of disk drive failure in a year. a. If all your computer data is stored on a hard disk drive with a copy stored on a second hard disk drive, what is the probability that during a year, you can avoid catastrophe with at least one working drive? b. If copies of all your computer data are stored on three independent hard disk drives, what is the probability that during a year, you can avoid catastrophe with at least one working drive? a. With two hard disk drives, the probability that catastrophe can be avoided is nothing. (Round to four decimal places as needed.)arrow_forwardThe remaining part of the case and question below : Fortunately, shipboard emergencies are infrequent, but when they do occur they are problematic. For instance, the Costa Concordia hit a rock and sank off Italy, causing32 people to die. A generator fire on the Carnival Triumph stranded 4000 passengers for four days. Sporadically, viruses causing diarrhea and vomiting strike cruise ships, causingCarnival to take an infected ship out of service to eradicate all traces of the virus by sanitizing virtually every object on board.Although these incidents are costly, the cruise industry has a fatality rate three times better than airlines. Economic Issues Spending for a cruise is generally considered discretionary. During recessions, people are more apt to take shorter cruises and to embark from nearby ports rather than flying to faraway points of departure. Interestingly, however, in comparison with other segments of the tourist industry, cruise lines have fared well during economic…arrow_forwardA Web server has five major components that must all function in order for it to operate as intended. Assuming that each component of the system has the same reliability, what is the minimum reliability each one must have in order for the overall system to have a reliability of .98?arrow_forward
- A University Web server has 5 main components, each with the same reliability. All 5 components must work for the server to function as intended. If the University wants to have a 81 percent reliability, what must be the reliability of each of the components?arrow_forwardAssume that a computer has two 1TB disks, D0 and D1. The Mean Time to Failure (MTTF) ofeach disk is 1M hours.a. If the disk system is configured to have 2TB total storage capacity, when any of the two disksfails, the disk system fails. What is the MTTF of the disk system?b. Mirroring (RAID-1) is a technique can improve the reliability of disk systems by usingredundancy. Each data block will have two identical copies stored in both D0 and D1. Under thisconfiguration, the disk system has only 1TB total storage capacity; but it only fails when bothdisks fail (e.g. when the failed disk is being repaired, the second disk also fails). If the MTTR of afailed disk is 20 hours, what is the MTTF of the disk system now?arrow_forwardThe purpose of a Business Impact Analysis (BIA) is to determine: Choose the correct answer? The cost to repair a failed system The extent of a disaster's damage Critical business processes that must be maintained How often an incident will occurarrow_forward
- A production line has three machines A, B, and C, with reliabilities of 90, 95, and 94, respectively. The machines are arranged so that if one breaks down, the others must shut down. Engineers are weighing two alternative designs for increasing the line's reliability. Plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. In either case, three machines (A. B. and C) would be used with reliabilities equal to the original three. a. Compute overall system reliability under Plan 1. (Round your intermediate calculations and final answer to 4 decimal places.) Answer is complete but not entirely correct. Reliability 0.9859 b. Compute overall system reliability under Plan 2 (Round your intermediate calculations and final answer to 4 decimal places.)arrow_forwardA production line has three machines A, B, and C, with reliabilities of .90, 95, and .98, respectively. The machines are arranged so that if one breaks down, the others must shut down. Engineers are weighing two alternative designs for increasing the line's reliability. Plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. In either case, three machines (A, B, and C) would be used with reliabilities equal to the original three. a. Compute overall system reliability under Plan 1. (Round your intermediate calculations and final answer to 4 decimal places.) b. Compute overall system reliability under Plan 2. (Round your intermediate calculations and final answer to 4 decimal places.) c. Which plan will provide the higher reliability?arrow_forwardAn operation consists of two steps , the first of which has a reliability of 97% and the second a reliability of 99%. What is the probability that the operation will fail? please I need full explanationarrow_forward
- Lily believed that a prospective insured's building might be considered a highly protected risk. Which one of the following buildings is most likely to be considered a highly protected risk? A small building located in the middle of a very rural area A masonry noncombustible industrial complex that relies on its own water supply An office building without any public fire protection A large fire-resistive building with automatic sprinkler systemsarrow_forward2. Suppose that the cumulative distribution function of the lifetime of a piece of operating equipment is given by F(t) = 1 – e-0.61 – 0.6te¬0.61 where t is measured in years of continuous operation. a. Determine the reliability function. b. Determine the failure rate function. c. What is the probability that this piece of equipment fails in the first year of operation? d. What is the probability that this piece of equipment fails in the fifth year of operation? e. What proportion of the equipment surviving four years fails in the fifth year? (Calculate without using the failure rate function.) f. Does r(4) closely approximate the answer to part (e)? Why or why not? g. What proportion of the equipment surviving four years fails in the first month of the fifth year? (Calculate using the failure rate function.)arrow_forwardOne of the industrial robots designed by a leading producer of servomechanisms has four major components. Component 0.98, 0.95, 0.94, and 0.90. All of the components must function in order for the robot to operate effectively. b. Designers want to improve the reliability by adding a backup component. Due to space limitations, only one backup cbackup for any component will have the same reliability as the unit for which it is the backup. Compute the reliability of the robot.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.