Question
Chapter 4, Problem 4RQ
To determine
(a)
Definition of "bank measure" related to estimating process.
To determine
(b)
Definition of"Swell factor" related to the estimating process.
To determine
(c)
Definition of compaction factor related to the estimating process.
To determine
(d)
Definition of Cut and fill related to the estimating process.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
An earth embankment requires 2000 m of soil for construction at a target dry density of
17 kN/m. Quotations from three different vendors are shown in the table below along with
their distances from site. Assume cost of transportation = 10 per km, G= 2.7 and y = 10 kN/m³.
%3D
S.No. Vendor Name Void ratio of soil Rate (/m') Distance from site
1.
A
0.6
6.0
99.5 km
2.
B
0.7
5.5
131 km
3.
C
0.8
5.0
175 km
Which vendor would you choose as the most economic solution?
(a) Vendor A
(c) Vendor C
(b) Vendor B
(d) Any of these
A lot is divided into squares of 10 m. on its side and the elevation at each corner is given in
the figure. It is required to fill and level the ground at elevation 10 m.
a. Determine the volume of fill required by unit area method
b. Determine the volume of fill required by parallel sections method
9.2
6.2
9.6
10
10
9.6
9.1
8.6
10
9.2
7.6
6.2
6.9
7.1
10
9.6
8.6
7.9
7.4
7
10
10
10
10
Q2. After surveying a borrow pit, the surveyor produced the following pit grade below.
What is the total volume (cubic yard)? The unit in the map is ft.
-20. O
6.1
5.4
5.8
20, 0
4.7
H3. 3-
4.8
5. 1
4. 6
3.9
-26. 7–
4.6
5.0
4. 4
5.5
5. 1
4. 9
4. 2
3. 7
3. 9
4. 4
3. 7
20.0
Chapter 4 Solutions
Fundamentals Of Construction Estimating
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- What is the purpose of a soils report, and how can the information it contains assist the estimator?arrow_forwardQ1: Explain the procedure for hydrometer analysis. Use online sources for detail descriptive study of the process. Hints: Search for the answers of these questions in particular. · For what type of soil hydrometer analysis is used. · Credibility of the results obtained from hydrometer analysis. · Precautions and limitations of the test. Q2: Explain the given table. Hints: · Explain the terms given in the table. · Explain the use of this table in hydrometer analysis.arrow_forwardThe grading works of a proposed road shows the following data. Free haul distance = 50m Cost of Haul = P0.25 per meter station Length of Economical Haul = 450m 1 station = 20m What is the cost of excavation?arrow_forward
- Define Alternative Methods of Transporting Earth Fill.arrow_forwardQ12. After surveying a borrow pit, the surveyor produced the following pit grade below. What is the total volume (cubic yard)? The unit in the map is ft, the square is 20ft x 20ft. 5.0 4.9 20.0 4.2 3.9 5.4 13.3- -13.3 4.3 4.6 5.4 4.4 -20.0 6.1 5.4 5.8 4.9 4.7 4.8 5.1 4.6 3.9 -13.3- -26.7- 4.6 5.4 4.4 |3.9 5.5 5.1 4.9 4.2 4.2 3.9 4.4 4.7 -20.0 -20.0arrow_forwardIn reply to figure-4.15-site-plan-for-review-question-11 I calculated the answer as cubic feet and converted to cubic yards, so 3606 cu ft cut and 1699.1 cu ft fill becomes 133.6 cubic yards cut, and 62.9 cubic yards fill. See graphic. Am i right? what is correct answer please? Regards R Goddardarrow_forward
- What are the main methods for collecting or taking soil samples to be analyzed in the laboratory when a geotechnical study or soil mechanics study is carried out? if you can please write it in a computer, and be claer please. I WILL RATE ITarrow_forward2. A lot is divided into squares of 10 m. on its side and the elevation at each corner is given in the figure. It is required to fill and level the ground at elevation 10 m. a. Determine the volume of fill required by unit area method b. Determine the volume of fill required by parallel sections method 9.2 6.2 9.6 10 10 9.6 9.1 8.6 10 9.2 7.6 6.2 6.9 7.1 10 9.6 8.6 7.9 7.4 10 10 10 10 SITYarrow_forwardThe cross-section notes shown below are for a ground excavation for a 10m wide roadway. STA 23+4000 8.87 505 8.09 3.16 6 4 3 3.95 Determine the cross sectional area at STA 23+4000. Round your answer to 3 decimal places. Add your answerarrow_forward
- In an earthwork computation , the results shown that the length of free haul distance is 50 m, with a limit of economical haul of 450 m. If the cost of haul is estimated to be P40 per cu.m. per meter station, what is the cost of borrow per cu.m. A. P800 per cu.m. B. P850 per cu.m. ·C. P700 per cu.m. D. P450 per cu.m.arrow_forwardQUESTION 2 The following net accumulations were calculated. The free haul area begins at station 4+30 and continues to 14+30. What is the total overhaul distance (ft)? Round to the nearest hundredths. from station to station net accumulation, yd³ 2+60 3+00 3.85 3+00 4+00 5.85 4+00 4+30 8.35arrow_forward4. Given the approximate flat area and depth of excavation of the following borrow pits: a. 3750.0 sq. m. and 758.0 cm b. 0.035 sq. km and 180.0 m c. 15.6 ares and 495.0 m d. 9.250 ha and 250.0 m e. 46750 sq. m. and 195.0 m Determine the volume of earth removed from each pit in cubic meters.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,