Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
4th Edition
ISBN: 9781337399395
Author: Pratt, David J.
Publisher: Cengage,
Question
Book Icon
Chapter 4, Problem 11RQ
To determine

The volume of cut and the volume of fill in cubic yards.

Blurred answer
Students have asked these similar questions
The image shows the plan of a site that is 60mx40m overall with a grid laid out at 10m in center. The elevation (in meters) of the existing grade is shown at each Intersection point of the grid. Calculate the volume of cut and the volume of fill in cubic meters required to level this site to a new grade of 100.0 m over the entire area. Sample responde format Summary 1 total volumen cut = (include the unit of measure) 2 total fill volume = (ditto)
Discuss the advantages and disadvantages of calculating volumes of cut and fill by using the “grid method” rather than by using the “section method.”
Figure 4.15 shows the plan of a site that is 64' × 160' overall, with a grid laid out as shown. The elevation (in feet) of the existing grade is shown at each intersection point on this grid. Calculate the volume of cut and the volume of fill in cubic yards required to bring this site to the new grades shown on the plan.
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,