To explain: the importance of OSHA requirements for an estimator regarding excavation.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Prior to starting any excavation project, what are two of the most important factors:
How does exploratory testing vary from other types of testing and what are those differences?
Q4/ Answer the following:
If the excavation depth is about 5 ft and the soil is cohesive, where the site area is adjoining
structures, how can be supporting the sides of excavation?
Chapter 4 Solutions
Fundamentals Of Construction Estimating
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- As a geotechnical engineer and considering the questions below, select the question or questions that you would ask your client representative and the other design professionals to obtain the information you need to prepare a proposal for conducting the geotechnical engineering study for a project. Select one or more: O a. What is the site history? O b. What are the allowable total and differential settlements? O c. What is the project schedule? O d. How much of a change in existing site grade (elevation) is expected or planned due to cutting or filling? O e. What type of building construction and materials are being considered? O f. What are the structural loads (columns, walls, floor, etc.) for the proposed project?arrow_forward1. What is the difference between an excavation and a trench?arrow_forwardQuestion 8 Which BIM Use can be used to automate site excavation? Design Review O Machine Control O Specifications Procurement Question 7 If you are doing BIM...you should be utilizing all BIM Uses O True O Falsearrow_forward
- i. Compare the advantages and disadvantages of site investigation and laboratory testing. ii. Give at least three case scenarios where the lab work will not be possible and you can only get results from field testing.arrow_forwardExplain about the Dewatering Shallow Excavations.arrow_forwardA shallow trench for a 1000-foot water line installment will take 10 days. It will take 4 days to install the first 400 feet of pipe. A water meter will then be installed during the following 2 days at the end of the pipe. After the meter is installed, the remaining 600 feet of pipe will be installed in 6 days. develop the linear schedule for this project.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,