Solid Waste Engineering
Solid Waste Engineering
3rd Edition
ISBN: 9781305635203
Author: Worrell, William A.
Publisher: Cengage Learning,
bartleby

Concept explainers

Question
Book Icon
Chapter 3, Problem 3.20P
To determine

The number of commercial location that can be serviced in one day.

Blurred answer
Students have asked these similar questions
O Solid waste from a park is to be collected in large containers. It is estimated that the average time to drive from the garbage to the first container t, and from the last container t₂ to the garbage each day will be 15 and 20 minutes, respectively. If the average time required to drive between the containers is 360 seconds and the two-way distance to the disposal site is 50 km (speed limit 88 km/hr), determine the number of containers that can be emptied per day, based on an 8-hour work day. Note: at 88 km/hr speed, a = 0.016, b=0.011; S = 0.133, W=0.15; Pc+U= 0.4 h/trip.
Calculate the number of stops in each trip of 1.50 h of refuse collection for the following data v= velocity = 15 km/h – 4.17 m/s d= distance= 750 m n = number of containers to empty per stop=1 tc= time to empty one bin/container= 650 s
Estimate the number of dump trucks requireu transportation of 1125 cum of materials per day for average lead of 5 km with the following data; Capacity of one dump-truck = 15 cum Speed during empty haul @ 25 km/hr and loaded haul @ 20 km/hr Loading time for one dump truck = 10 minutes. Take 10% in stand by and 6 hours working period in a day.
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,