Example 7-2 Selection of container size for use at a commercial facility A commercial facility produced the following quantities of solid waste each week for a calendar quarter of operation. Using these waste production data, determine the size of container at which it becomes more cost effective to make extra pickup trips, on call instead of using a larger-sized container. Assume the data given below are applicable.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Example 7-2 Selection of container size for use at a commercial facility
A commercial facility produced the following quantities of solid waste
each week for a calendar quarter of operation. Using these waste production
data, determine the size of container at which it becomes more cost effective to
make extra pickup trips, on call instead of using a larger-sized container.
Assume the data given below are applicable.
1. Waste production data
Week no.
1
2
3
4
5
6
7
2. Collection system data
Capacity yd3
30
35
40
45
50
-
-
Waste yd3/wk
41
30
35
34
39
25
32
-
Week no.
8
9
10
11
12
13
Capital cost $ Annual O&M cost &/yr
3000
150
175
225
Waste yd3/wk
27
37
36
33
28
31
3500
4000
4900
6100
Cost per trip= 50$.00/trip
Useful life of the containers= 10 yr
Discount rate=10%
Capital recovery factor= (i=10%, n=10yr) = 0.16275
300
400
Transcribed Image Text:Example 7-2 Selection of container size for use at a commercial facility A commercial facility produced the following quantities of solid waste each week for a calendar quarter of operation. Using these waste production data, determine the size of container at which it becomes more cost effective to make extra pickup trips, on call instead of using a larger-sized container. Assume the data given below are applicable. 1. Waste production data Week no. 1 2 3 4 5 6 7 2. Collection system data Capacity yd3 30 35 40 45 50 - - Waste yd3/wk 41 30 35 34 39 25 32 - Week no. 8 9 10 11 12 13 Capital cost $ Annual O&M cost &/yr 3000 150 175 225 Waste yd3/wk 27 37 36 33 28 31 3500 4000 4900 6100 Cost per trip= 50$.00/trip Useful life of the containers= 10 yr Discount rate=10% Capital recovery factor= (i=10%, n=10yr) = 0.16275 300 400
Expert Solution
steps

Step by step

Solved in 5 steps with 4 images

Blurred answer
Knowledge Booster
Collection systems
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning