The refuge collection route for the suburban development.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A community of 100,000 people wants to initiate public garbage collection and disposal to a landfill that is 30 miles away. The collection frequency is once a week. For garbage transportation to the landfill, there are two options: no transfer station and a transfer station that is 10 miles away from the community and is on the way to the landfill. Determine:
Total transportation cost for the no transfer station option.
Total transportation cost for the transfer station option.
Breakeven point (for the two options), if the transfer station can be placed anywhere on the way to the landfill. Your answer must be in term of distance between the station and the community.
Assumptions/given information:
Generation rate: 4 lbs/person/day.
As collected density: 200 lb/yd3.
Collection truck size of 20 yd3 with a compaction ratio of 3.
Transfer truck/trailer size of 60 yd3 with no compaction capability.
Costs: 30 cents per mile per collection truck, 10 cents per mile per transfer…
(84
Solid waste from a park is to be collected in large containers. It is estimated that the average time to
drive from the garbage to the first container t, and from the last container t₂ to the garbage each day
will be 15 and 20 minutes, respectively. If the average time required to drive between the containers
is 360 seconds and the two-way distance to the disposal site is 50 km (speed limit 88 km/hr), determine
the number of containers that can be emptied per day, based on an 8-hour work day.
Note: at 88 km/hr speed, a = 0.016, b= 0.011; S = 0.133, W = 0.15; Pc+U= 0.4 h/trip.
Determine the fry for the following conditions:
• 4.0% upgrade for 0.875 miles
Traffic composition: 12% trucks (30% SUTS/70% TTs)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- 5 What is the derivation of the minimum radius allowed for each operating speed? Superelevation Centripetal Acceleration Gravitational Pull 6 Crossfalls that are flatter than most likely wont drain adequately O 1.5% 2.0% O 2.5%arrow_forwardThe first decision to be made is how the solid waste container will get from the residence to the collection vehicle. Compare the advantages and disadvantages of the two methods of collection truck routing. i. Daily route method ii. Single load methodarrow_forwardDiscuss the concept of pipeline hazards and their impact on pipeline efficiency.arrow_forward
- When using the parking space hour supply equation, you must take into account efficiency of the facility during its highest demand period. What is the average efficiency factor that must use if you are addressing curb parking? youarrow_forwardplz, solve this problem, it is not graded question. Transportation Engineering-1arrow_forward9. Calculate the estimated free flow speed of a Class II two-lane highway if the field measured mean speed is 56.5 mph and the flow rate during the field data collection was 650 vph and all vehicles are passenger vehicles.arrow_forward
- A major weaving segment on an urban freeway as shown in Figure below. What are the level of service and capacity of the weaving segment? If volume (A-C) is 1,000 vph, volume (A-D) is 500 vph, volume (B-C) is 900 vph, and volume (B-D) is 1,200 vph, 13% trucks, PHF = 0.95, rolling terrain, drivers are regular commuters, FFS = 120 km/h for freeway, and weaving %3D segment is 450 m. L=450 m 1,000 500 900 1,200arrow_forwardWhat are the factors affecting the handling capacity of highways.arrow_forwardScheduled maintenance will close two of the four westbound lanes of a freeway during one weekday for the period from 9:00 AM to 4:00 PM. The demand on the two lanes are as follows: Time Demand, vph 9:00-10:00 AM 4000 10:00-11:00 AM 3500 11:00-12:00 NN 2500 12:00-1:00 PM 2000 1:00-2:00 PM 2000 2:00-3:00 PM 2000 3:00-4:00 PM 2000 If the estimated capacity of the 4 lanes with 2 lanes open is 2960 vph, a. compute the time when maximum queue occurs. 11:00 AM b. compute the maximum queue formed. 1580 vehicles c. compute the maximum length of queue if the average length of cars is equal to 5 meters. 1975 m Show all necessary diagrams and solutions.arrow_forward
- Subject : Transportation engineering This is my second time uploading first time I was received wrong solution attached below. If you don't know the solution please leave it but don't waste my question. Wha iI'm asking Read the question carefully. A curved segment of an existing road has a radius of 180 m, which restricts the posted speed limit for that segment to 75% of the speed limit of the road. If this segment of the road is to be improved so that the posted speed limit is that of the rest of the road, determine the radius of the improved segment. The maximum superelevation allowed is 8%.arrow_forwardES 3 USING NSCP 2015 CODE PLEASE SOLVE THE PROBLEMarrow_forwardWhich of the following road used extensively for maintenance? * O Gravel road O Surface dressing O Porous Asphalt O Concrete Roadarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning