(a)
Interpretation: Themanufacturing system best suitable for the case where a local shop that accepts custom orders from a different customers in the electrical industry.
Concept Introduction:
A stand-alone numerically controlled machine is most applicable in the situation where the flexibility and variety are very high. Productivity in such a case becomes very low. A flexible manufacturing system refers to the production method that is designed in such a way that it could easily adapt to changes in the quality and quantity of the goods being manufactured. A fixed transfer line is generally used in the situation where the variety and flexibility of parts are very low.
(b)
Interpretation: Themanufacturing system best suitable for the case where a global supplier of standard-sized metal container.
Concept Introduction:
A stand-alone numerically controlled machine is most applicable in the situation where the flexibility and variety are very high. Productivity in such a case becomes very low. A flexible manufacturing system refers to the production method that is designed in such a way that it could easily adapt to changes in the quality and quantity of the goods being manufactured. A fixed transfer line is generally used in the situation where the variety and flexibility of parts are very low.
(c)
Interpretation: Themanufacturing system best suitable for the case where a meatl working section of the large aircraft producers, which should serve the requirement of a cariety of sections in the organization.
Concept Introduction:
A stand-alone numerically controlled machine is most applicable in the situation where the flexibility and variety are very high. Productivity in such a case becomes very low. A flexible manufacturing system refers to the production method that is designed in such a way that it could easily adapt to changes in the quality and quantity of the goods being manufactured. A fixed transfer line is generally used in the situation where the variety and flexibility of parts are very low.
Want to see the full answer?
Check out a sample textbook solutionChapter 11 Solutions
Production and Operations Analysis, Seventh Edition
- Discuss and analyse the practicality of AR/VR/MR/XR applications in the industrial sector in which you have experience. provide an outline analysis of the value and constraints of applying the approach. use the following papers as example references for your bibliography (1000 words). you need to build your bibliography of at least 20 recent (within the last 5 years) references from a range of sources. Dudhee. V. and Vukovic. V. (2021), "Building information model visualisation in augmented reality", smart and sustainable built environment, vol. ahead-of-print No. ahead-of-print. https://doi.org/1108/SASBE-02-2021-002 Alizadehsalehi, s., Hadavi, A., Huang, J. C. (2020), From BIM to extended reality in AEC industry" , Automation in Construction, Vol. 116, No. 103254, ISSN 0926-5805, https://doi.org/10.1016/j.autcon.2020.103254arrow_forwardA large hospital that batches orders for a variety of surgical supplies with its preferred supplier should use a? A. P system B. D system C. Q system D. Z systemarrow_forwardRelevant Costs and Quality Improvement Lightening Bulk Company is a moving companyspecializing in transporting large items worldwide. The firm has an 85% on-time delivery rate.Thirteen percent of the items are misplaced and the remaining 2% are lost in shipping. On average,the firm incurs an additional $65 per item to track down and deliver misplaced items. Lost items costthe firm about $300 per item. Last year, the firm shipped 6,000 items with an average freight bill of$200 per item shipped.The firm’s manager is considering investing in a new scheduling and tracking system costing$125,000 per year. The new system is expected to reduce misplaced items to 1% and lost items to0.5%. Furthermore, the firm expects total sales to increase by 10% with the improved service. Theaverage contribution margin ratio on any increased sales volume, after cost savings associated witha reduction in misplaced and lost items, is expected to be 37.5%.Required1. Based on a relevant cost analysis, should…arrow_forward
- systems designed for a specific customer. Select one of the following: • Multipurpose items Components for systems that are tailored to the needs of the client What about generic drugs?arrow_forwardWhich of the following is a primary activity in the value chain? A. Receiving and handling of raw materials and other inputs B. Setting up Contractual arrangements with various suppliers C. Finding suitable vendors to supply raw materials D. Negotiating prices with vendors E. Investigating new designs.arrow_forwardOne of the following is not an element in the primary activities of a value chain? Inbound logistics Outbound logistics Service all of above None of thesearrow_forward
- Because of the perishability of services, _____________ is especially important. Group of answer choices customization outsourcing tangible evidence of quality demand managementarrow_forwardWorks Inc. designs industrial tooling parts and makes the molds for those parts. The following activities take place when the company creates a new mold. Classify each cost as unit level (U), batch level (B), product/process level (P), or organizational level (O). Consultation with equipment manufacturer on design specifications Engineering design of mold Creating mold Moving materials from warehouse for test quantity Direct materials for test quantity to judge conformity to design specifications Inspecting test quantity Preparing design specification changes based on test molds Depreciating small kiln used solely for test quantities Depreciating manufacturing buildingarrow_forwardExplain the concept of "system resilience engineering" and its focus on minimizing system failures.arrow_forward
- The relationship illustrated by the following E-R Diagram is valid in the SD module Give answer fast and only type answerarrow_forwardInput techniques, such as batching and real-time processing, need specifications. Describe one way in which source data collection might be made more mechanically efficient.arrow_forwardSuppose we have a business of supplying fruits and vegetables to customers. So How to manage a order when there is lack of team members(more then 3-5 employes on leave on same time ) in the order management and order need to be fulfilled in short span of time in the following situations :-I) When Delivery team missing II) When Packaging Team missingIII) When Billing Team missing (Answer in points only ) upvote for quality answerarrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.