A generating plant has a maximum capacity of 100 kW and costs Rs 1,60,000. The annual fixed charges are 12 %. If the load factor is 50 %, the fixed charges per kWh will be ?

Electricity for Refrigeration, Heating, and Air Conditioning (MindTap Course List)
10th Edition
ISBN:9781337399128
Author:Russell E. Smith
Publisher:Russell E. Smith
Chapter7: Alternating Current, Power Distribution, And Voltage Systems
Section: Chapter Questions
Problem 8RQ
icon
Related questions
Question
100%

A generating plant has a maximum capacity of 100 kW and costs Rs 1,60,000. The annual fixed charges are 12 %. If the load factor is 50 %, the fixed charges per kWh will be ?

Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Types of Power Station and Its Characteristics
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Electricity for Refrigeration, Heating, and Air C…
Electricity for Refrigeration, Heating, and Air C…
Mechanical Engineering
ISBN:
9781337399128
Author:
Russell E. Smith
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning