Operations Management
17th Edition
ISBN: 9781259142208
Author: CACHON, Gérard, Terwiesch, Christian
Publisher: Mcgraw-hill Education,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7, Problem 10PA
a)
Summary Introduction
To determine: The capacity of the machine (Housings per hour).
b)
Summary Introduction
To determine: The utilization of the machine.
c)
Summary Introduction
To determine: The average inventory of housings.
d)
Summary Introduction
To determine: The number of D7000 housing to be produced in each batch.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A bicycle component manufacturer produces hubs for bike wheels. Two processes are possible for manufacturing, and the parameters of each process are as follows:
Process 1
Process 2
35 parts/ hour
4 hours/ day
15 parts/hour
7 hours/day
20%
9%
Production rate
Daily production time
Percent of parts rejeted based on visual inspection
Assume that the daily demand for hubs allows all defect-free hubs to be sold. Additionally, tested or rejected hubs cannot be sold.
Find the process that maximizes profit per day if each part is made from Php 200 worth of material and can be sold for Php 1,500. Both processes are fully automated, and variable
overhead cost is charged at the rate of Php 2,000 per hour.
A chemical process involves adding various agents to a vat and then waiting for theagents to react to make a final compound. The vat holds up to 1000 gallons. Chemicalagents are added to the vat at a rate of 4.5 gallons per minute. Once the agents have beenadded to the vat, the reaction takes 85 minutes no matter the actual number of gallonsin the batch. After the batch is complete, the vat must be cleaned. Cleaning always takes15 minutes. What is the setup time of this process?a. 15 minutes c. 100 minutesb. 85 minutes d. 222.22 minutes
A bicycle component manufacturer produces hubs for bike wheels. Two processes are possible for
manufacturing, and the parameters of each process are as follows:
Process 1
Process 2
Production Rate
35 parts per hour
15 parts per hour
Daily production time
4 hours per day
7 hours per day
Percent of Parts Rejected
20%
9%
Assume that the daily demand for hubs allows all defect-free items to be sold. Additionally, defective hubs cannot be sold and their material cannot be recovered anymore. Find the process that minimizes the total cost per piece if each part is made from $4 worth of material. Both processes are fully automated, and the variable overhead cost is charges at $40 per hour.
Chapter 7 Solutions
Operations Management
Ch. 7 - Prob. 1CQCh. 7 - Prob. 2CQCh. 7 - Prob. 3CQCh. 7 - Prob. 4CQCh. 7 - Prob. 5CQCh. 7 - Prob. 6CQCh. 7 - Prob. 7CQCh. 7 - Prob. 8CQCh. 7 - Prob. 9CQCh. 7 - Prob. 10CQ
Ch. 7 - Prob. 11CQCh. 7 - Prob. 12CQCh. 7 - Prob. 13CQCh. 7 - Prob. 14CQCh. 7 - Prob. 1PACh. 7 - Prob. 2PACh. 7 - Prob. 3PACh. 7 - Prob. 4PACh. 7 - Sarahs Organic Soap Company makes four kinds of...Ch. 7 - Prob. 6PACh. 7 - Prob. 7PACh. 7 - Bruno Fruscalzo decided to set up a small...Ch. 7 - Prob. 9PACh. 7 - Prob. 10PACh. 7 - Prob. 1CCh. 7 - Prob. 2CCh. 7 - Prob. 3CCh. 7 - Prob. 4C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The following are applications of recycle in a process except? a. Diluting a process stream b. Increasing efficiency of the process c. Improving the process stream's flow d. Getting rid of impuritiesarrow_forwardThis four-step process loop is termed a machine cycle. Most individuals prioritise which machine cycle factors? Should I worry about replacing worn machine cycle parts? Can increasing the number of modules simplify switching between them?arrow_forwardA service blueprint is best defined as: a process flowchart a process flow chart showing the activity times a flowchart that shows the SERVQUAL differences a flow chart showing failpoints the author discusses poka-yokes as fail-safing devices suitable for services as well as manufacturing. The relationship of poka-yokes to service blueprints is best described as: having been created by the same woman, Lynn Shostack creating poka-yokes for each fail point identified in a service blueprint Having been created by the same company to improve banking services in Japan producing a large amount of personal creativity to increase customer expectationsarrow_forward
- A 10 station automated assembly system produces an ideal cycle time (Tc) of 14 seconds/cycle. When a defective part enters any assembly station it sometimes causes a station jam or stoppage. Defective parts occur at a rate of 0.07 and a jams due to defective parts occur at a rate of 0.4. When a jam occurs, it takes on average 74 seconds to clear and restart the station. Determine the production rate of acceptable parts (Rap) to the nearest 1 part/hour.arrow_forwardA process control system consists of ________ elements.arrow_forwardA fleet repair center resets its computerized diagnostic system after every 15 trucks to help ensure there are limited major downtimes from system failure. The reset takes 22 minutes on average with a CV of 0.3. Each trucks diagnosis takes 28 minutes on average with a CV of 1.75 not considering the resets. 1. What is the effective process time and its CV? 2. If the reset system is not used, failures will occur after 57 hours on average with an average repair time of 3 hours. The CV of repair time is 0.9. What is the effective process time and its CV? Is the maintenance system beneficial if it prevents breakdowns? Just consider effective processing time parameters. 3. The maintenance program costs $10,000 annually. The average profit per car from the diagnostic service is $75. Assume the service center operates 250 days per year, 10 hours per day. Is the maintenance program economically beneficial? What assumptions are needed?arrow_forward
- The principles of process improvement suggest that an ineffective, inefficient process: O Keeps non-value-adding activities off the critical path Processes workpieces on a FIFO basis Produces products in large batch sizes Produces at the rate of customer demandarrow_forwardProcess Redesign is concerned with increasing the performance of processes without changing the order of activities within the process or fundamentally changing the activities themselves. focuses on eliminating costs works to find ways to eliminate activities within a process. is concerned with improving performance by changing the order of activities or fundamentally changing the activities themselves.arrow_forwardA machine makes two components; call them types A and B. It takes 250 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 2 seconds, or 30 units per minute. Assume there is ample demand. If the production schedule could be adjusted with the goal of minimizing inventory in the process, how many units of A should be produced before switching to component B? In other words, calculate the optimal batch size for component A. Assume the same number of units of B would be produced as well. answer:_______unitsarrow_forward
- A machine makes two components; call them types A and B. It takes 250 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 2 seconds, or 30 units per minute. Assume there is ample demand. Suppose the machine rotates between one batch of 1,000 unties of A and 1,000 units of B. What is the utilization of the machine? answer: _____percentarrow_forwardA machine makes two components; call them types A and B. It takes 250 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 2 seconds, or 30 units per minute. Assume there is ample demand. Suppose the machine rotates between one batch of 1,000 untis of A and 1,000 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B? answer: __________ component pair per minutearrow_forwarddefine the following (reference is needed) Process Model:Identifying Problems, Opportunities, and Objectives:Determining Human Information Requirements:Analyzing System Needs:Designing the Recommended System:Developing and Documenting Software:Testing and Maintaining the System:Implementing and Evaluating the System:Risk Management: (reference is needed)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.