PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
7th Edition
ISBN: 9781119610526
Author: Mannering
Publisher: WILEY
bartleby

Concept explainers

Question
Book Icon
Chapter 6, Problem 20P
To determine

The new level of service of the highway.

Blurred answer
Students have asked these similar questions
A six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and obstructions (fLW = 6.0 mph) 4 ft from the right edge of the traveled pavement (fLC = 0.8 mph). There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. A directional peak-hour volume of 2000 vehicles (primarily commuters) is observed, with 600 vehicles arriving in the highest 15-min flow rate period. The traffic stream contains 12% large trucks (ET = 2.5) and buses and 6% recreational vehicles (ER = 2.0).   What is the estimated free-flow speed of the traffic stream in mph (whole number, nearest 5)?  What is the peak-hour factor (3 decimal places)?  What is the heavy-vehicle adjustment factor (2 decimal places)?  What is the service flow rate (whole number, nearest 5)?  What is the service measure value if the average speed of the traffic stream is 65 mph (one decimal place)?
A divided multilane highway in a recreational area has four lanes (two lanes in each direction) and is on rolling terrain. The highway has 10-ft lanes with a 6-ft right-side shoulder and a 3-ft left-side shoulder. The posted speed is 50 mi/h. Previously, there were 4 access points per mile, but recent development has increased the number of access points to 12 per mile. Before development, the peak-hour factor was 0.95, and the directional hourly volume was 2200 vehicles with 13% heavy vehicles. After development, the directional hourly volume is 2600 vehicles with the same vehicle percentages and peak-hour factor. What is the LOS before and after the development?
A six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and obstructions (fLw = 6.0 mph) 4 ft from the right edge of the traveled pavement (fic = 0.8 mph). There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. A directional peak-hour volume of 2000 vehicles (primarily commuters) is observed, with 600 vehicles arriving in the highest 15-min flow rate period. The traffic stream contains 12% large trucks (ET = 2.5) and buses and 6% recreational vehicles (ER = 2.0). 1.) What is the estimated free-flow speed of the traffic stream in mph (whole number, nearest 5)? 2.) What is the peak-hour factor 3.) What is the heavy-vehicle adjustment factor? 4.) What is the service flow rate? 5.) What is the service measure value if the average speed of the traffic stream is 65 mph
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Structural Analysis
Civil Engineering
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:Cengage,
Text book image
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Text book image
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Text book image
Sustainable Energy
Civil Engineering
ISBN:9781337551663
Author:DUNLAP, Richard A.
Publisher:Cengage,
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning