Chapter 5, Problem 5.8P
To determine

Find the cubic meters of soil are needed from the excavation site to produce 7,651m3 of compacted fill.

Find the number of 1,789 kN truck loads is needed to transport the excavated soil.

Blurred answer
Students have asked these similar questions
The in situ moisture content of a soil is 18% and the moist unit weight is 16.5 kN/m3.The specific gravity of soil solids is 2.75. This soil is to be excavated and transported toa construction site for use in a compacted fill. If the specifications call for the soil tobe compacted to a minimum dry unit weight of 16.27 kN/m3 at the same moisturecontent of 18%, how many cubic meters of soil from the excavation site are needed toproduce 7651 m3 of compacted fill? How many 178 kN truckloads are needed totransport the excavated soil
In its natural state the soil in a borrow pit, the total (moist) unit weight is 120 lb/ft³, and the water (moisture) content is 20 %. The result of the Modified compaction test of the soil of the borrow pit is given in the figure below. The soil from the borrow pit will be used to construct a compacted fill. The construction of the fill requires 10,000 ft³ of compacted soil. The specifications required that the compaction of the fill be performed at the optimum moisture content to obtain the maximum dry unit weight for fill. How much (volume in ft³) must be excavated from the borrow pit? Dry unit weight (lb/ft³) 107 106 105 104 103 102 8 12 w (%) 16 20 24
An earth dam needs to be compacted to reach 1.84 g/cm' at 15% water content. The field unit weight before compaction of the earth dam soil is 1.77 g/cm', the moisture content is 8% and specific gravity is 2.7. What is the amount of soil required to construct one cubic meter of the earth dam after compaction?
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning