Question
Chapter 5, Problem 4PA
a)
Summary Introduction
To determine: The bottleneck.
b)
Summary Introduction
To determine: The flow rate for each flow unit.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
n a manufacturing process, a molded part spends 7 hours in inventory before being placed in a deburring machine, where the part is processed for 2 minutes. After deburring, the part spends 4 hours in inventory waiting for its turn on the polishing machine. The part then spends 7 minutes in polishing before waiting 6 hours in line to be painted. The part goes through a painting process that takes 7 minutes, then spends 11 hours in inventory before being shipped to the customer.
What is the percentage of value-added time for the part?
A local bakery is renowned for its elaborately cecorated sheet cakes. Consider the following process information: One baker is ivailable to prepare the cake batter (measuring and mixing ingredients and then adding it to baking pans). On average, this takes 10 minutes to prepare two cakes, ie. to make enough batter for 2 cakes and to add the batter to 2 cake pans. Move time to add and remove them from the oven is neglig bile, it takes 32 minutes to bake cakes - the bakery has two ovens, each able to hold 2 cakes. The one pastry chef on staff puts on an amazing show that draws a crowd all day-each cake is decorated in 6 minutes. The bakery operates 8 hours per day.
Answer each of the following questions:
a. What is the cycle time (in minutes per cake) of each stage - preparing, baking, and decorating?
b. What is the dally process capacity? Explain.
c. If orders arrive at a rate of 3 cakes every 20 minutes, can the bakery meet the caily demand Explain,
Note: Be clear about how you…
C&A Candy produces two kinds of gumdrops: regular and sugar-free. The data on these gumdrops are given below:
Regular Sugar-Free
30
10
60
30
80
80
Demand (lbs per hour)
Changeover time (min)
Production rate (lbs per hour)
C&A first makes 60 pounds of regular gumdrops, then 20 pounds of sugar-free gumdrops, and then repeats this sequence. What is the utilization of
the production process?
Multiple Choice
O
O
O
25%
20%
50%
40%
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Consider a process consisting of five resources that are operated 8 hours per day. Theprocess works on three different products, A, B, and C: Demand for the three different products is as follows: product A, 40 units per day;product B, 50 units per day; and product C, 60 units per day.a. What is the bottleneck?b. What is the flow rate for each flow unit, assuming that demand must be served in the mixdescribed above (i.e., for every four units of A, there are five units of B and six units of C)?arrow_forwardFour employees at a fast-food restaurant each perform one of the four activities in serving a customer: greet customer, take order, process order, and deliver order. The processing time for each activity is given as follows: Greet customer Take order Process order Deliver order A) 50% Assume demand is unlimited. What is the average labor utilization? B) 68% C) 40% Activity D) 162% Processing time per customer 2 seconds 30 seconds 60 seconds 5 secondsarrow_forwardA machine operates with the following production cycle: 15 minutes of setup,45 minutes of production. While in production the machine produces 2 parts per minute.What is the capacity of the machine in parts per minute?arrow_forward
- Three employees at a fast-food restaurant each perform one of the three activities in serving a customer: take the order, process the order, and deliver the order. The processing time for each activity is given as follows: Activity Processing Time Take the order 30 seconds Process the order 2 minutes Deliver the order 1 minute Assume that the demand is 20 customers/hour. What is the average labor utilization? a 38.9% b 85.7% c 66.7% d 100%arrow_forwardA lab provides ultrasound service to patients. The service process consists of two steps: 1. Registration. Performed by a receptionist (Salary rate = $25/hr; Process time = 6 minutes/patient) 2. Ultrasound scan. Performed by a technician (Salary rate = $30/hr; Process time = 20 minutes/patient) Note that the ultrasound images need to be read by radiologists, but we assume that they have an ample capacity and thus will not model the role in the service process. Currently, the lab has 2 receptionists and 3 technicians. The manager anticipates demand to grow to 14 patients/hr in the near future. Thus, he plans to hire more receptionists and/or technicians to increase the service capacity to at least 14 patients/hr. What would be the extra payroll cost (in dollars per hr)?arrow_forwardAn injector machine goes down roughly 20% of the time (the injector gums up and needs to be cleaned, a quick process). One operator is assigned to service three identical such machines. Each machine can produce 100 parts/h if running properly (i.e., not down). The operator is paid $10/h and each machine costs $20/h to operate. Consider 8hr/shift a) Please fill in the table below: b) How many parts can you produce per shift? c) What is the unit cost fper part for this operation? d) If you hire another operator at the same rate to assist the first operator, what is the unit cost now? e) Is it worth hiring another operator at the same rate to assist the first operator, in case more than one machine goes down at the same time?arrow_forward
- A company manufactures clay bricks in batches. A batch consists of 200 bricks. The manager reports that his weekly production target is 1500 bricks. Each brick has to be processed through 5 machines on average. It takes on average 30 minutes to set up the machines and the average operation time is 6 minutes. There are 10 machines in the plant. Calculate the manufacturing lead time if the average non-operation time is 2 hrs. Calculate the production rate and If the plant operates 70 hours per week, calculate the production capacity Calculate the Production Capacity if the machines are only available for 85% of the time. Will the manager be able to meet his production target? Justify your answer.arrow_forwardA manufacturing company has a small production line dedicated to the production of a particular product. The line has four stations in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3 and so on. The output from station 4 is the finished product. Station 1 can process 2,700 units per month, station 2 can process 2,500/month, station 3 can process 2,300/month, and station 4 can process 2,100/month. What station sets the maximum possible output from this system? What is that maximum output number?arrow_forwardA Company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 7 workers, who produced an average of 87 carts per hour. Workers receive $15 per hour, and machine coast was $43 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $14 per hour while output increased by four carts per hour. a) Compute the multifactor productivity (MFP) (labor plus equipment) under the Prior to buying the new equipment. The MFP (carts/S) = Blank 1 (round to 4 decimal places). b) Compute the productivity changes between the Prior to and after buying the new equipment. The productivity growth = Blank 2% (round to 2 decimal places) Blank 1 Add your answer Blank 2 Add your answerarrow_forward
- A Company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 6 workers, who produced an average of 78 carts per hour. Workers receive $10 per hour, and machine coast was $36 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $13 per hour while output increased by four carts per hour.a) Compute the multifactor productivity (MFP) (labor plus equipment) under the Prior to buying the new equipment. The MFP (carts/$) = (round to 4 decimal places).b) Compute the % growth in productivity between the Prior to and after buying the new equipment. The growth in productivity = % (round to 2 decimal places)arrow_forwardA manufacturing company has a small production line dedicated to the production of a particular product. The line has four stations in serial. Inputs arrive at station 1 and the output from station 1 becomes the input to station 2. The output from station 2 is the input to station 3 and so on. The output from station 4 is the i nished product. Station 1 can process 2,700 units per month, station 2 can process 2,500/month, station 3 can process 2,300/month, and station 4 can process 2,100/month. What station sets the maximum possible output from this system? What is that maximum output number?arrow_forwardNavern Corporation manufactures and sells custom home elevators. From the time an order is placed until the time the elevator is installed in the customer's home averages 141 days. The 141 days are spent as follows: Wait time Inspection time Process time Move time Queue time What is Navern's manufacturing cycle efficiency (MCE) for its elevators? Multiple Choice O O 41.1% 30.4% 58.9% 29 days 24 days 34 days 31 days 23 days 57.4%arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,