Chapter 3, Problem 3.24P

(a)

To determine

Calculate the moist weight of borrow soil needed to construct the first lift per ft of the embankment.

(b)

To determine

Calculate the moist weight of borrow soil needed to construct the first lift after heavy rain.

Blurred answer
Students have asked these similar questions
An embankment will be constructed from borrowed Soil. The cross section of the embankment is shown in Exhibit 10.10. The soil in the embankment has to be compacted to a dry unit weight of 108 lb/ft³ at a moisture content of 14.5%. The borrowed soil will be brought in 10 cubic-yard truck loads. The borrowed Soil has a void ratio of 1.1. Given: specific gravity Of Soil Solids, Gs=2.68. The volume of excavation needed at the borrow site for construction of each 100' length of embankment is most nearly: 1 a) 4144 yd ³ b) 5260 yd3 c) 3550 yd3 d) 4890 yd³ 25ft 15ft Exhibit 10.10
An embankment for a highway 30 m wide and 1.3 m in compacted thickness is to be constructed from a sandy soil trucked from a borrow pit. The water content, w, of the sandy soil in the borrow pit is 17% and its void ratio, e, is 0.75. The specification requires the embankment be compacted to a dry unit weight of 19 kN/m^3. Determine, for 3 km length of embankment. Assume Gs = 2.7 a) Compute the volume (m³) of borrow material required b) solve the cost of fill if the earth fill from borrow site costs Pho 150/m³ c) calculate the volume (m³) of borrow material required is the specification required a void ratio of 0.20
Solve with complete solutions and explain. An embankment for a highway 30 m wide and 1.5 m in compacted thickness is to be constructed from a sandy soil trucked from a borrow pit. The water content of the sandy soil in the borrow pit is 15% and its void ratio is 0.69. The swell index is 1.2. The specification requires the em-bankment to be compacted to a dry unit weight of 18 kN/m3. Determine, for a 1 km stretch of embankment, the weight of sandy soil from the borrow pit required to construct the embankment, the number of truckloads of sandy soil required for the construction. The full capacity of each truck is 22.2 m3 and local government policies require a maximum loaded capacity of 90%, the weight of water per truckload of sandy soil and the degree of satu-ration of the sandy soil in situ.
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Principles of Geotechnical Engineering (MindTap C...
Civil Engineering
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Cengage Learning
Text book image
Fundamentals of Geotechnical Engineering (MindTap...
Civil Engineering
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning