Chapter 3, Problem 3.21CTP

(a)

To determine

Find the number of truckloads required to construct the fill.

(a)

Expert Solution
Check Mark

Answer to Problem 3.21CTP

The number of truckloads required to construct the fill is 10,539trips_.

Explanation of Solution

Given information:

Borrow pit:

The water content of the undisturbed soil is wpit=15%.

The unit weight of the undisturbed soil in the borrow pit is (γ)pit=19.1kN/m3.

The specific gravity of the undisturbed soil is Gs=2.70.

Loading truck:

The capacity of the truck is Vtruck=4.80m3.

The net weight of the soil and water when the truck is loaded with is W=72.7kN.

Compacted fill:

The dry unit weight of the compacted fill is (γd)fill=17.3kN/m3.

The finished volume of the compacted fill is Vfill=38,500m3.

The moisture content of the fill is wfill=15%.

Calculation:

Find the weight of the solids (Ws)truck in each truck using the relation:

(Ws)truck=W1+wpit

Substitute 72.7 kN for W and 15% for wpit.

(Ws)truck=72.71+15100=72.71.15=63.2kN

Find the weight of the solids in the compacted fill (Ws)fill using the relation:

(Ws)fill=(γd)fillVfill

Substitute 17.3kN/m3 for (γd)fill and 38,500m3 for Vfill.

(Ws)fill=17.3×38,500=666,050kN

Find the number of truckloads required using the relation:

Numberoftruckloads=(Ws)fill(Ws)truck

Substitute 666,050 kN for (Ws)fill and 63.2 kN for (Ws)truck.

Numberoftruckloads=666,05063.2=10,539trips

Therefore, the number of truckloads required to construct the fill is 10,539trips_.

(b)

To determine

Find the volume of the pit that remains in the borrow area.

(b)

Expert Solution
Check Mark

Answer to Problem 3.21CTP

The volume of the pit that remains in the borrow area is 40,102.5m3_.

Explanation of Solution

Given information:

Borrow pit:

The water content of the undisturbed soil is wpit=15%.

The unit weight of the undisturbed soil in the borrow pit is (γ)pit=19.1kN/m3.

The specific gravity of the undisturbed soil is Gs=2.70.

Loading truck:

The capacity of the truck is Vtruck=4.80m3.

The net weight of the soil and water when the truck is loaded with is W=72.7kN.

Compacted fill:

The dry unit weight of the compacted fill is (γd)fill=17.3kN/m3.

The finished volume of the compacted fill is Vfill=38,500m3.

The moisture content of the fill is wfill=15%.

Calculation:

Find the weight of the soil (Wsoil) using the relation:

(Ws)fill=Wsoil1+wpit

Substitute 666,050 kN for (Ws)fill and 15% for wpit.

666,050=Wsoil1+15100Wsoil=666,050(1+0.15)=765,957.5kN

Find the volume of the pit (Vpit) using the relation:

Vpit=Wsoil(γ)pit

Substitute 765,957.5 kN for Wsoil and 19.1kN/m3 for (γ)pit.

Vpit=765,957.519.1=40,102.5m3

Therefore, the volume of the pit that remains in the borrow area is 40,102.5m3_.

(c)

To determine

Find the liters of water will have to be added per truck load.

(c)

Expert Solution
Check Mark

Answer to Problem 3.21CTP

The liters of water will have to be added per truck load is 193.3liters_.

Explanation of Solution

Given information:

Borrow pit:

The water content of the undisturbed soil is wpit=15%.

The unit weight of the undisturbed soil in the borrow pit is (γ)pit=19.1kN/m3.

The specific gravity of the undisturbed soil is Gs=2.70.

Loading truck:

The capacity of the truck is Vtruck=4.80m3.

The net weight of the soil and water when the truck is loaded with is W=72.7kN.

Compacted fill:

The dry unit weight of the compacted fill is (γd)fill=17.3kN/m3.

The finished volume of the compacted fill is Vfill=38,500m3.

The moisture content of the fill is wfill=15%.

Calculation:

Neglect the moisture lost by evaporation during excavation, haulage, and handling.

The moisture content increased from 15% to 18%.

Find the weight of the water (Ww)  to be added using the relation:

Ww=(Ws)truck(wfillwpit)

Substitute 63.2 kN for (Ws)truck, 18% for wfill, and 15% for wpit.

Ww=63.2×(1810015100)=1.896kN

Consider the unit weight of water as γw=9.81kN/m3.

Find the volume of water (Vw) to be added using the relation:

Vw=Wwγw

Substitute 1.896 kN for Ww and 9.81kN/m3 for γw.

Vw=1.8969.81=0.1933m3×1,000liter1m3=193.3liters

Therefore, the liters of water will have to be added per truck load is 193.3liters_.

(d)

To determine

Find the water content at saturation.

(d)

Expert Solution
Check Mark

Answer to Problem 3.21CTP

The water content at saturation is 19.7%_.

Explanation of Solution

Given information:

Borrow pit:

The water content of the undisturbed soil is wpit=15%.

The unit weight of the undisturbed soil in the borrow pit is (γ)pit=19.1kN/m3.

The specific gravity of the undisturbed soil is Gs=2.70.

Loading truck:

The capacity of the truck is Vtruck=4.80m3.

The net weight of the soil and water when the truck is loaded with is W=72.7kN.

Compacted fill:

The dry unit weight of the compacted fill is (γd)fill=17.3kN/m3.

The finished volume of the compacted fill is Vfill=38,500m3.

The moisture content of the fill is wfill=15%.

Calculation:

Find the void ratio (efill) in the compacted fill using the relation:

(γd)fill=Gsγw1+efill

Substitute 17.3kN/m3 for (γd)fill, 2.70 for Gs, and 9.81kN/m3 for γw.

17.3=2.70×9.811+efill1+efill=26.48717.3efill=0.531

Find the water content (w) using the relation:

Sefill=wGs

Substitute 1 for S, 0.531 for efill, and 2.70 for Gs.

1×0.531=w×2.70w=0.197=19.7%

Therefore, the water content at saturation is 19.7%_.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
A proposed earthen dam will contain 5,000,000 m3of earth. Soil to be taken from a borrow pit will becompacted to a void ratio of 0.78. The void ratio ofsoil in the borrow pit is 1.12. Estimate the volume ofsoil that must be excavated from the borrow pit. Include phase diagrams.
QUESTION 1: PHASE RELATIONS a. The bulk unit weight and water content of a soil at a borrow pit are 17.2 kN/ml and 8.2% respectively. A highway fill is being constructed using the soil from this borrow at a dry unit weight of 18.05 kN/m³. Find the volume of the borrow pit that would make one cubic meter of the finished highway fill. b. A soil to be used in the construction of an embankment is obtained by hydraulic dredging of a nearby canal. The embankment is to be: placed at a dry density of 1.72 t/m³ and will have a finished volume of 20,000 m³. The in situ saturated density of the soil at the bottom of the canal is 1.64 t/m³. The effluent from the dredging operation, having a density of 1.43 t/m³, is pumped to the embankment site at the rate of 600 L per minute. The specific gravity of the soil grains is 2.70. i. ii. How many operational hours would be required to dredge sufficient soil for the embankment? what would be the volume of the excavation at the bottom of the canal? c. A…
A fill having a volume of 15000 m³ is to be constructed at a void ratio of 0.5. The borrow pit solid has a void ratio of 1.5. The volume of soil required (in cubic meters) to be excavated from the borrow pit will be:
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781305081550
Author:Braja M. Das
Publisher:Cengage Learning