EBK ELECTRICAL WIRING RESIDENTIAL
19th Edition
ISBN: 9781337516549
Author: Simmons
Publisher: CENGAGE LEARNING - CONSIGNMENT
expand_more
expand_more
format_list_bulleted
Textbook Question
Chapter 15, Problem 15R
- a. Must the metal frame of an electric clothes dryer be grounded? ___________
- b. Is it permitted to ground the metal frame of an electric clothes dryer to the neutral conductor? ___________
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
a.2. Which of the following statements about grounding electrode conductors is true?A. They restrict the ground connection.B. They eliminate potential differences between conductive objects and the Earth electrode.C. They facilitate operation of overcurrent protective devices.D. They perform bonding between the Earth and grounded conductors.a.3. Main bonding jumpers are required to be made of _______ or other corrosion-resistant material.A. brassB. aluminumC. copperD. copper-clad aluminum
7.A. Ferrous metal raceways or enclosures are made with _______ content.A. steel or brassB. aluminum or ironC. brass or aluminumD. iron or steel7.B. The size of a grounding electrode conductor for a service or separately derived system is generally basedon the size of the largestA. ungrounded supply conductor.B. equipment grounding conductor.C. grounded electrode.D. bonding jumper.7.C. Which of the following statements about bonding is true?A. The joint or termination must offer opposition in the circuit for effective electrical connections.B. Effective bonding keeps impedance high if a fault should occur.C. The entire electrical safety circuit is only as good as its strongest bonded link.D. Bonding connections must endure high levels of fault current until overcurrent protective devices can operate.
6. Ferrous metal raceways or enclosures are made with _______ content.A. brass or aluminumB. steel or brassC. aluminum or ironD. iron or steel
Chapter 15 Solutions
EBK ELECTRICAL WIRING RESIDENTIAL
Ch. 15 - Prob. 1RCh. 15 - Prob. 2RCh. 15 - What special type of switch is controlling the...Ch. 15 - Prob. 4RCh. 15 - The total estimated volt-amperes for Circuit B10...Ch. 15 - If an attic is accessible through a scuttle hole,...Ch. 15 - Prob. 7RCh. 15 - Prob. 8RCh. 15 - The following is a layout of the lighting circuit...Ch. 15 - Prob. 10R
Ch. 15 - Prob. 11RCh. 15 - a. What is the minimum power demand allowed by the...Ch. 15 - What is the maximum permitted current rating of a...Ch. 15 - Prob. 14RCh. 15 - a. Must the metal frame of an electric clothes...Ch. 15 - An electric dryer is rated at 7.5 kW and 120/240...Ch. 15 - When a metal junction box is installed as part of...Ch. 15 - A residential air-conditioning unit is installed...Ch. 15 - The Code states that a means must be provided to...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Similar questions
- 2. Imagine that you're asked to install an auxiliary grounding electrode at the base of a lighting pole in aparking lot. This auxiliary grounding electrode will be connected to theA. lighting pole's electrical service equipment grounding conductor.B. electrical service's grounding electrode conductor.C. next lighting pole's auxiliary grounding electrode.D. lighting pole's neutral conductor.arrow_forward1.1 PV modules can be wired together in an array using ______ connections to increase voltage. a. Terminating b. Series c. Parallel d. AC 1.2 A PV module, also called a solar panel, is comprised of individual photovoltaic _______ wired and mounted together as an integrated unit. a. Capsules b. Compartments c. Chips d. Cells 1.3 A __________ system uses a storage system that stores the generated electricity so it can provide during times when the system’s panels are not receiving solar energy. a. Direct coupled b. Self regulating c. Charge controlled d. Indirectly connected 1. 4 __________ energy may have the potential to supply all of the world's energy needs, but at this time, it provides a very small percentage. a. Coal b. Natural Gas c. Diesel d. Solararrow_forwardEquipment Grounding 10. Which of the following statements about ground faults is true?A. They usually occur between any grounded circuit conductor and the equipment grounding conductor. B. They're often normal and typically intentional.C. They can't result from human error.D. They can happen if a conductive tool is dropped in an energized equipment's electrical enclosure.arrow_forward
- 12. Which of the following statements about ground faults is true?A. They can happen if a conductive tool is dropped in an energized equipment's electrical enclosure.B. They usually occur between any grounded circuit conductor and the equipment grounding conductor.C. They can't result from human error.D. They're often normal and typically intentional.arrow_forward4.A. If a bonding jumper is installed from a grounded metal box to a grounding-type receptacle, the length ofthe bonding jumper will be betweenA. 2 and 4 feet.B. 2 and 4 inches.C. 6 and 10 feet.D. 6 and 10 inches.4.B. Why isn't solder permitted to be relied on for grounding electrode connections?A. The solder increases the chances of a ground-fault event occurring.B. The heat from the solder weakens the connection and exposes it to physical damage.C. The use of solder doesn't meet the requirements for corrosive influences.D. The connection's integrity can be negatively affected by heat during a ground-fault event.4>c. Which of the following statements about bonding is true?A. The strike terminals of a lightning protection system must be bonded to the building or structure grounding electrode system.B. Bonding requirements on the supply side of the service disconnect are less restrictive.C. Wire-type supply-side bonding jumpers are usually short in length and installed from the…arrow_forward____ current occurs when the system neutral is grounded improperly downstream from the service equipment. Select one: A. PHASED B. OBJECTIONABLE C. POSITIVE D. NEGATIVEarrow_forward
- To testing installation of grounds, the usual procedure is to connect one lead of the megohmmeter to one of the conductors, then the other lead is___. A, connected to another conductor b, connected to the conduit or raceway c. Connected to a special grounding electrode on the megohmmeter d. Left unconnectedarrow_forwardA cable wire maybe coaxial or twisted. Coaxial costs 25 centavos per meter while twisted wire costs only 18 centavos. The soldering cost for coaxial wire is P1.30 per connection, for twisted wire P1.70. What length of cable run will make the cost of installing coaxial equal to that of the twisted wire. Assume that the number of soldered connection is 350. ANSWER_____________marrow_forwardQUESTION 9 When a ground wire is connected to an interior gas piping system and the underground portion of the gas pipe into the building is plastic, which of the following is (or are) true? a A.This would be approved by code as the gas pipe is only being bonded to the electrical system. b B.This installation would be approved by code, as the gas pipe is not a grounding electrode. c C.Both A and B d D.Neither A nor Barrow_forward
- 24. The National Electrical Code® _____ contains tables dealing with conductors for general wiring. Select one: A. 100 B. 110 C. 310 D. 300arrow_forward1. A14/2 type copper used for a general lighting branch circuit. Ampacity:______________ Maximum Fuse or Circuit Breakers Sizes:________________ 2.Three 8 AWG copper conductors with THHN insulation Installed in garage in electrical metallic tubing (EMT). The ambient temperature in the garage can reach as high as 110'F. All termination points for this circuit are rated 60'C. Ampacity:______________ Maximum Fuse or Circuit Breakers Sizes:________________ 3.Four 4 AWG copper conductor with THWN insulation imstalled in EMT in a basement. All termination points are rated at 60'C. Ampacity:______________ Maximum Fuse or Circuit Breakers Sizes:________________ 4. An 8/3 Type UF copper cable installed underground from a house to a detached garage to feed a 120/240-volt subpanel. All termination points are rated at 60'C.…arrow_forwardMessages AA Statement one Training will allow you to safely erect a mobile. tower scaffold on any ground surface condition. and access the tower both internal and externally Statement two In windy conditions placing sheeting around the mobile tower scaffold will protect the workers on the tower a) Statement two is incorrect b) Statement one and two are correct c) Statement one is correct and statement two is incorrect d) Both statements are incorrect actclass.co.uk 22 Questi 23 Questi 24 Questi 25 Questi 26 Questi Submit Answers Ćarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENT
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT
Introduction to 8051 Microcontroller | Part 1 | Bharat Acharya Education; Author: Bharat Acharya Education;https://www.youtube.com/watch?v=2-geyR_aM28;License: Standard Youtube License