EBK ELECTRICAL WIRING RESIDENTIAL
19th Edition
ISBN: 9781337516549
Author: Simmons
Publisher: CENGAGE LEARNING - CONSIGNMENT
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 15, Problem 8R
To determine
Calculate the current draw of the exhaust fan in the laundry.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Follow the procedures in troubleshooting the defects and faults of an electric fan by filling in the missing steps.Doesn't rotate 1.___________ 2.____________ Check for Open AC cord or wiring3. ___________4.___________ Defective switch/electronic system control 5. _____________Defective module (system control).
QUESTION 9
When a ground wire is connected to an interior gas piping system and the underground portion of the gas pipe into the building is plastic, which of the following is (or are) true?
a
A.This would be approved by code as the gas pipe is only being bonded to the electrical system.
b
B.This installation would be approved by code, as the gas pipe is not a grounding electrode.
c
C.Both A and B
d
D.Neither A nor B
A Single Phase Motor is connected to a 120 Volt, 60 Hz line. The motor has a current draw of 15.7 amperes. A watt meter indicates the motor is actually using 1.340 watts. Find the following:
Apparent power: ___________________________________________________________________________________________
Power factor of the motor; _________________________________________________________________________________
Reactive power of the motor: ________________________________________________________________________________
Capacitance needed to correct the power factor to 100%: ____________________________________________________
Capacitance needed to correct the power factor to 95%: _____________________________________________________
Chapter 15 Solutions
EBK ELECTRICAL WIRING RESIDENTIAL
Ch. 15 - Prob. 1RCh. 15 - Prob. 2RCh. 15 - What special type of switch is controlling the...Ch. 15 - Prob. 4RCh. 15 - The total estimated volt-amperes for Circuit B10...Ch. 15 - If an attic is accessible through a scuttle hole,...Ch. 15 - Prob. 7RCh. 15 - Prob. 8RCh. 15 - The following is a layout of the lighting circuit...Ch. 15 - Prob. 10R
Ch. 15 - Prob. 11RCh. 15 - a. What is the minimum power demand allowed by the...Ch. 15 - What is the maximum permitted current rating of a...Ch. 15 - Prob. 14RCh. 15 - a. Must the metal frame of an electric clothes...Ch. 15 - An electric dryer is rated at 7.5 kW and 120/240...Ch. 15 - When a metal junction box is installed as part of...Ch. 15 - A residential air-conditioning unit is installed...Ch. 15 - The Code states that a means must be provided to...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.Similar questions
- A device used in kitchen serving hotels dining rooms club houses and restaurants is__________. a.) Grease basin b.) Yard basin c.) Garage basin d.) Oil catch basinarrow_forward13. If an equipment bonding jumper is run external to a raceway, it must be less than _______ feet.A. 6B. 2C. 4D. 5arrow_forward1.1 PV modules can be wired together in an array using ______ connections to increase voltage. a. Terminating b. Series c. Parallel d. AC 1.2 A PV module, also called a solar panel, is comprised of individual photovoltaic _______ wired and mounted together as an integrated unit. a. Capsules b. Compartments c. Chips d. Cells 1.3 A __________ system uses a storage system that stores the generated electricity so it can provide during times when the system’s panels are not receiving solar energy. a. Direct coupled b. Self regulating c. Charge controlled d. Indirectly connected 1. 4 __________ energy may have the potential to supply all of the world's energy needs, but at this time, it provides a very small percentage. a. Coal b. Natural Gas c. Diesel d. Solararrow_forward
- 4.a. The ___ calculated load is rarely placed on an electrical system.A. optionalB. standardC. total 4.b. What's the primary disadvantage of using copper conductors?A. CostB. AvailabilityC. Weight 4.c. You're evaluating the components of a multioccupancy building that won't have an on-site employee. Tobe compliant with the NEC, each occupant will need to have access to their ownA. service-disconnecting means.B. service conductor.C. cable attachment point.D. emergency fire water-pump disconnect.arrow_forwardDirection. Answer each problem and show your solutions cleanly and clearly. Draw diagrams._______________________________________________________________________________________________________________________arrow_forward2. Imagine that you're asked to install an auxiliary grounding electrode at the base of a lighting pole in aparking lot. This auxiliary grounding electrode will be connected to theA. lighting pole's electrical service equipment grounding conductor.B. electrical service's grounding electrode conductor.C. next lighting pole's auxiliary grounding electrode.D. lighting pole's neutral conductor.arrow_forward
- A means shall be provided in each metal box over 100 cubic inches for the connection of an equipment grounding conductor. The means shall be permitted to be ______. a tapped hole the cover screw III. a screw used to mount the box (a.) I only (c.) I & II only (b.) II only (d.) I, II or IIIarrow_forwardQuestion 9 An FET is a current voltage O voltage and current __-controlled device.arrow_forwardoleg is using a multimeter to test the circuit branch he's just installed. after turning off the current to the circuit at the service panel, he'll first attach one probe to the ----- in the end of the run. a. black wire b. box c. white wire d. ground wire Please answer with explanation In typing formatarrow_forward
- QUESTION 5 A duplex receptacle is installed on a 4-inch square raised metal cover and mounted on a 4-inch square metal box.If the grounding terminal of the receptacle is connected to the grounded metal box, which of the following requirements would also apply to the installation of the duplex receptacle? a It must be secured by at least two screws. b The single 6/32 screw holding it in the cover must be tight. c It must be secured directly to the 4 inch square box. d It is not permitted to be installed in raised covers.arrow_forwardFind the current iy ANSWER:______________mAarrow_forwardAn open in one of the heated rear window grid elements can be repaired by ______. a. pealing the heat grid off the glass with a heat gun and installing a new grid element b. applying a thin strip of a repair compound to the damaged area c. bridging the damaged area with rosin core solder d. replacing the window glassarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- EBK ELECTRICAL WIRING RESIDENTIALElectrical EngineeringISBN:9781337516549Author:SimmonsPublisher:CENGAGE LEARNING - CONSIGNMENT
EBK ELECTRICAL WIRING RESIDENTIAL
Electrical Engineering
ISBN:9781337516549
Author:Simmons
Publisher:CENGAGE LEARNING - CONSIGNMENT